Permit NumberBLD04-01105
StatusFinaled
Name MAUI TACO
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(MAUI TACO - BOISE AIR TERMINAL - FOOD COURT) This building is fire sprinkered for fire area reasons. To construct a 1,055 square foot commercial kitchen including a stock room and service counter next to the food court within the new airport terminal building. This project is located on the 2nd floor within the security area (i.e. between the security check point and airplane loading). Work is to include interior nonbearing walls, suspended ceilings, counters, equipment, security grilles, and finishes all per the approved drawings and the plan review report on file. Operations that produce smoke or grease laden vapors are NOT approved within this tenant space. The location of fire sprinkler heads shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/20/200512/9/2005 DONE
over a yr old No final value
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 2/3/20054/26/2005 DONE
Permanent occupancy UNPAID FEE  12/20/2004 DONE
Perm. Occ. Cert. # 10393 issued 12-20-04 to Maui Taco.
BLD-Final12/14/200412/15/200412/15/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/2004 at 10:48:45 AM. Contact: ###-####. surf board gone final ok. 12/15/2004 2:40:34 PM
Permanent Occupancy 12/15/200412/15/2004 DONE
Details
FIRE-Final Inspection10/25/200410/26/200410/26/2004PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/25/2004 at 3:39:40 PM. Contact: ###-####. Need flame spread data on surfboards 10/26/2004 2:56:28 PM
BLD-Final10/25/200410/26/200410/26/2004PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/25/2004 at 3:40:03 PM. Contact: ###-####.
Temporary occupancy  9/23/2004 DONE
Temp. Occ. Cert. # 5144 issued 9-22-04 to Maui Taco.
BLD-Other9/22/20049/22/20049/22/2004 PART
DetailsJim Storey
final ok pending submital to supply smoke and flame spread on micro bus . and health dept. 9/23/2004 11:48:29 AM
FIRE-Final Inspection9/17/20049/17/20049/17/2004PPASS
DetailsRick Jackson
BLD-Framing/Rough-in8/4/20048/5/20048/5/2004ACANC
DetailsJim Storey
mark///fire caulking; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rolled over out of time. 8/5/2004 11:43:06 AM
BLD-Other8/5/20048/5/20048/5/2004PNR
DetailsJim Storey
mark///fire caulking; Phone #: ###-#### Internet Inspection Request from: Barbara Moore pending revised listing for fire stopping. 8/5/2004 2:21:44 PM
Routing - PLAN CHECK6/16/2004 6/18/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/18/2004 DONE
Inspection Record Card- Bld  6/18/2004  
Print Occupancy Form  6/18/2004 DONE
Permit Ready to Issue  6/18/2004 DONE
Telephone call  6/18/2004 DONE
left mess that permit is ready
Issue PAID IN FULL permit  6/18/2004  
Plan assigned to (CJW)6/2/2004 6/18/2004 PASS
DetailsCarl Westfall
6/18/2004 13:27:03 CJW - activity updated through activity BLDA022 from case BLD04-01105.
Routing - FIRE6/14/2004 6/16/2004 PASS
Plan Review Completed(1st rev)  6/16/2004 PASS
Routing - PLAN CHECK6/9/2004 6/14/2004 PASS
IBC plan review started June 11, 2004 and was finished June 14, 2004. The drawings were approved with clarifications. See the plan review report.
Routing - PLUMBING6/8/2004 6/9/2004 PASS
add a hand sink at M22 per cdhd review, additional cross connection protection may be required, if an automatic soap dispensor is installed at the mop sink provide a water supply for it.
Routing - PUBLIC WORKS6/2/2004 6/7/2004 PASS
Plans ACCEPTED BY PLAN TECH  5/28/2004 DONE
Application received  5/21/2004  
Recd Pcfee & Taken To Pln CK  5/21/2004 DONE
Fee Review-notes5/21/20045/21/2004