Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-01129
StatusFinaled
Name MARK WICKLUND
Site Address 1509 S ROBERT ST
Project NameROBERT OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
("DEF-DAWG BLIND MAN" Recording / Production Studios)(ROBERT OFFICE BLDG-SUITES 103/104) To establish a certificate of occupancy for new tenant. To remodel and combine two existing spaces to create one 2,496 sq.ft. office area in the west half of the building for new professional service's & office tenant per approved plans. The existing spaces were completed to "VANILLA FINISH" stage under BLD97-02616. Work will include selective demolition as shown on plans and construction of new interior non-bearing walls to create new open & private office areas; receiving & storage room with new exterior double doors of same width of window being replaced; new exterior landing at new door; and two, double wall sound rooms. To relocate one restroom for compliance with 2000 IBC & '98 ICC/ANSI and leave one existing accessible restroom, installed in compliance with 1997 UBC, as-is. There are NO modifications to exterior Envelope or HVAC that require energy code review. Switching in new rooms shall comply with Section 805, 2000 IECC. PC03-336/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/20/20055/20/200512/9/2005 DONE
Second Notice has not been responded to.///Over a year old No final values
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 9/17/20044/26/2005 DONE
Case Summary (BLD)  4/20/2005  
(F) Reprint permit  4/6/2005 DONE
(F) Reprint permit  4/6/2005  
BLD-Final9/17/20049/17/20049/17/2004PPASS
DetailsJim Storey
mark ###-#### final ok 9/17/2004 3:32:04 PM
Permanent occupancy UNPAID FEE  9/17/2004 DONE
Perm. Occ. Cert. # 10295 issued 9-17-04 to Def-Dawg Blind Man recording/production studio.
Place hold on job6/21/2004 9/17/2004 DONE
returned check - hold on job until paid - total of 135.10 check 91.00 admin 44.10 lh
Permanent Occupancy 9/7/20049/7/2004 DONE
Details
BLD-Final8/31/20049/1/20049/1/2004PDONE
DetailsJim Storey
mark ###-#### (cell); Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final9/1/20049/1/20049/1/2004PNR
DetailsJim Storey
mark ###-#### linda's hold still in place. 9/1/2004 2:59:23 PM
BLD-Conference7/14/20047/14/20047/14/2004PCANC
DetailsJim Storey
place hold on job....Wicklund consulting group has returned check of 91.00 + 44.10 = 135.10 due thanks Linda linda will contact/ no final until check is approved by linda. 7/14/2004 12:45:10 PM
Temporary occupancy  7/1/2004 DONE
Temp. Occ. Cert. # 5123 issued 7-1-04 to Def-Dawg Blind Man Recording/Production Studios.
FIRE-Final Inspection6/29/20046/30/20046/30/2004APASS
DetailsTroy Cobbley
Fire life safety finaled 6/30/2004 10:17:51 AM
BLD-Final6/29/20046/30/20046/30/2004APART
DetailsDave Hannah
Mark; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok for temp occ needs landing outside double doors alley side also needs to finish ada bathroom and instill signs needs egress hardware on to int doors 6/30/2004 2:55:44 PM
FIRE-Final Inspection6/25/20046/28/20046/28/2004PFAIL
DetailsRick Jackson
Mark; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Move deadbolt to main lobby and west exit to be openable from the inside...; repair exit signs; hang extinguishers with annual certification 6/28/2004 2:15:00 PM
Plan assigned to (DRS)6/3/2004 6/18/2004 PASS
DetailsDan Stuart
< $25,000
Routing - PLAN CHECK6/17/2004 6/18/2004 PASS
Approved as noted on and attached plan review conditions by all reviewing agencies.
PLANS/APPL TAKEN TO FRONT DESK  6/18/2004 PASS
To permit desk to issue.
Print Occupancy Form  6/18/2004 DONE
Inspection Record Card- Bld  6/18/2004 DONE
Permit Ready to Issue  6/18/2004 DONE
Telephone call  6/18/2004 DONE
left a general message with Def-Dawg Studios -- permit is ready.
Inspection Record Card- Bld  6/18/2004 DONE
Issue PAID IN FULL permit  6/18/2004 DONE
Routing - FIRE6/15/2004 6/17/2004 PASS
Plan Review Completed(1st rev)  6/17/2004 PASS
Routing - PLAN CHECK6/4/2004 6/14/2004 PEND
No resubmittals required. Routing to fire code analyst for review.
Routing - PUBLIC WORKS6/3/2004 6/4/2004 PASS
Plans ACCEPTED BY PLAN TECH  6/1/2004 DONE
Plan resubmittals received  5/26/2004 DONE
Received two A1 sheets put with plans.
Application received  5/24/2004  
Recd Pcfee & Taken To Pln CK  5/24/2004  
Fee Review-notes5/24/20045/24/2004