Permit Information
Permit NumberBLD04-01136
StatusFinaled
Name LESLIE CONSTRUCTION
Site Address 1873 N WHITEWATER AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a three bedroom, two bathroom 1185 sq. ft. single story single family dwelling with a attached 441 sq. ft. two car garage and a 112 sq. ft. covered front porch. Per approved plans and requriement list. PC#249 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/25/200410/25/200410/25/2004PPASS
DetailsJim Sly
###-#### - ron C/C issued. 10/25/2004 4:24:34 PM
BLD-Energy code compliance8/6/20048/6/20048/6/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/6/2004 at 7:43:44 AM. Contact: ###-####.
BLD-Framing/Rough-in8/5/20048/5/20048/5/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/5/2004 at 8:03:01 AM.
BLD-Footing7/1/20047/1/20047/1/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/1/2004 at 7:06:03 AM. Should be wall insp. OK 7/1/2004 12:05:02 PM
BLD-Footing6/30/20046/30/20046/30/2004PPASS
DetailsJim Sly
dane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  6/22/2004  
(F) Reprint permit  6/22/2004  
Plan assigned to (SAM)6/2/2004 6/3/2004 PASS
DetailsSteve Munroe
6/3/2004 13:30:51 SAM - activity updated through activity BLDA022 from case BLD04-01136.
Routing - PLAN CHECK5/25/2004 6/3/2004 DONE
Case Summary (BLD)  6/3/2004  
Plan Review Report  6/3/2004  
PLANS/APPL TAKEN TO FRONT DESK  6/3/2004 DONE
Only one set of plans are being approved due to excessive red-lining.
Permit Ready to Issue  6/3/2004  
Inspection Record Card- Bld  6/3/2004 DONE
Telephone call  6/3/2004 DONE
left mess that permit is ready
Pending Assignment by DJO5/24/2004 6/2/2004 DONE
DetailsDan Overy
6/2/2004 08:19:18 SAM - activity updated through activity BLDA183 from case BLD04-01136.
Plan Reviewer's activity  6/2/2004 DONE
6/2/04 11:20 I called and left a message for Ron. I let him know that I need a roof framing plan before I can finish the plan review. Plans are on hold.
Routing - PLANNING5/24/2004 5/25/2004 PASS
Routing - PUBLIC WORKS5/25/2004 5/25/2004 PASS
Application received  5/24/2004