BLD-Final | 9/22/2004 | 9/23/2004 | 9/23/2004 | A | PASS |
Lane Manuel
|
|
|
allan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 8/3/2004 | 8/4/2004 | 8/4/2004 | A | PASS |
Jim Sly
|
|
|
allen; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Energy code compliance | 7/29/2004 | 7/29/2004 | 7/29/2004 | P | FAIL |
Jim Storey
|
|
|
allan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n on site 7/29/2004 3:10:25 PM
|
BLD-Framing/Rough-in | 7/27/2004 | 7/27/2004 | 7/27/2004 | P | FAIL |
Lane Manuel
|
|
|
Alan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 7/6/2004 | 7/7/2004 | 7/7/2004 | P | PART |
Jim Sly
|
|
|
allan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 1hr walls OK up to 8' Fairview....S on Kimball (betw Mitch/ M.G L Cascade...... 7/7/2004 12:52:51 PM
|
BLD-Foundation | 6/21/2004 | 6/22/2004 | 6/22/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/21/2004 at 5:20:53 PM. Contact: ###-####.
|
BLD-Footing | 6/18/2004 | 6/18/2004 | 6/18/2004 | P | PASS |
Jim Sly
|
|
|
allen ###-####
|
Issue PAID IN FULL permit | | | 6/18/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/18/2004 | | |
|
|
|
|
Plan assigned to (DJO) | 6/17/2004 | 6/17/2004 | 6/17/2004 | | DONE |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | 6/17/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 6/17/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/17/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Permit Ready to Issue | | | 6/17/2004 | | DONE |
|
|
|
|
Pending Assignment by DJO | 5/25/2004 | | 6/17/2004 | | DONE |
Dan Overy
|
|
|
6/17/2004 09:30:41 DJO - activity updated through activity BLDA169 from case BLD04-01151.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/17/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/9/2004 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/9/2004 | | |
|
|
|
revisions will be resubmitted showing correct 1 hour wall detail, engineering for rear and front walls, additional support at overbuild and false eave section at side of garage.
|
Routing - PUBLIC WORKS | 6/3/2004 | | 6/4/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 5/25/2004 | | 6/3/2004 | | PASS |
|
|
|
CUP03-49
Side setback of 5'5" to allow for 20' interior garage width as shown on "Site Plan" sheet, not shown on floor plan
|
Application received | | | 5/25/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 6/7/2004 | | | | |
|
|
|
|