Code Occupancy Approval | | | 5/18/2006 | | PASS |
|
|
|
|
(F) Reprint permit | | | 6/10/2005 | | DONE |
|
|
|
|
BLD-Final | 6/7/2005 | 6/8/2005 | 6/8/2005 | P | PASS |
Tom Arcoraci
|
|
|
traux; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 6/8/2005 | 6/8/2005 | 6/8/2005 | P | PASS |
Tom Arcoraci
|
|
|
traux; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 6/6/2005 | 6/7/2005 | 6/7/2005 | P | FAIL |
Tom Arcoraci
|
|
|
rob jr --call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs zoning sign off and gasket elec boxes then ok for co
|
BLD-Framing/Rough-in | 5/2/2005 | 5/3/2005 | 5/3/2005 | A | PASS |
Tom Arcoraci
|
|
|
rob ###-####
|
BLD-Framing/Rough-in | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | PART |
Tom Arcoraci
|
|
|
rob ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cn posted
|
BLD-Framing/Rough-in | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | NR |
Tom Arcoraci
|
|
|
Please call at least a half hour prior to inspection so he can meet ya there///Rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs to see plan review on 1 hr walls 4/15/2005 4:44:03 PM
|
BLD-Conference | 2/23/2005 | 2/23/2005 | 2/23/2005 | P | PART |
Lane Manuel
|
|
|
Gerry; Phone #: ###-#### Internet Inspection Request from: Jan Rice
fire walls, and doubled drywall at soffits ok. 6 units 2/23/2005 3:49:09 PM
|
BLD-Foundation | 10/21/2004 | 10/21/2004 | 10/21/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/21/2004 at 7:43:10 AM. Contact: ###-####.
|
BLD-Footing | 10/19/2004 | 10/19/2004 | 10/19/2004 | P | PASS |
Tom Arcoraci
|
|
|
dane; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Issue PAID IN FULL permit | | | 10/18/2004 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 5/26/2004 | | 9/14/2004 | | PASS |
Steve Munroe
|
|
|
9/14/2004 14:31:55 SAM - activity updated through activity BLDA022 from case BLD04-01158.
|
Routing - FIRE | 9/9/2004 | | 9/14/2004 | | PASS |
|
|
|
Acceptable per resubmittals received
|
Routing - PLAN CHECK | 9/14/2004 | | 9/14/2004 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 9/14/2004 | | |
|
|
|
|
Plan Review Report | | | 9/14/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/14/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2004 | | DONE |
|
|
|
|
Routing - FIRE | 8/4/2004 | | 8/10/2004 | | FAIL |
|
|
|
Need hydrant location, fire flow, scaled plans to verify FD vehicle access. Advised Robert Truax of resubmittal requirements by phone in absence of a fax machine.
|
Plan Review Completed(1st rev) | | | 8/10/2004 | | FAIL |
|
|
|
failed plan check, planning ESC and Fire.
|
Routing - PLAN CHECK | 8/10/2004 | | 8/10/2004 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 8/5/2004 | | |
|
|
|
|
Plan resubmittals requested | | | 8/4/2004 | | |
|
|
|
Talked with Brian with Gowanwood.
|
Routing - PLAN CHECK | 7/26/2004 | | 8/4/2004 | | FAIL |
|
|
|
Routed to Fire.
|
Routing - Erosion and Sediment | 8/2/2004 | | 8/3/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 7/26/2004 | | 7/26/2004 | | PASS |
|
|
|
Approved per DRRH04-00172 -it is a modification of DR129-88.
|
Routing - PLAN CHECK | 6/17/2004 | | 6/17/2004 | | FAIL |
|
|
|
Plans are on hold. Modifications need to be submitted and approved by Planning and Zoning before plan review can be done.
|
Routing - PLANNING | 6/8/2004 | | 6/9/2004 | | FAIL |
|
|
|
Needs a DR modification for DR-129-88. The front and rear elevation designs are different then the 1988 approved elevations. I have left a message for Rod Atwood at Gowenwood Design to contact me.
|
Routing - Erosion and Sediment | 6/4/2004 | | 6/8/2004 | | FAIL |
|
|
|
No ESC plan or waiver request submitted.
|
Routing - PUBLIC WORKS | 5/26/2004 | | 6/3/2004 | | PASS |
|
|
|
|
Application received | | | 5/26/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/26/2004 | | DONE |
|
|
|
per Marlene
|