BLD-Final | 8/29/2005 | 8/30/2005 | 8/30/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/29/2005 at 4:19:30 PM. Contact: ###-####.
|
DOC - Permit Finaled | 8/30/2005 | 8/30/2005 | 8/30/2005 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 8/26/2005 | 8/29/2005 | 8/29/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/26/2005 at 1:04:24 PM. Contact: ###-####. conf. only,, need f/p final,,, ok to move furniture,, stair issues
|
BLD-Grading Inspection | 8/29/2005 | 8/29/2005 | 8/29/2005 | | DONE |
|
|
|
Final grading and daiange approved
|
BLD-Framing/Rough-in | 3/31/2005 | 4/1/2005 | 4/1/2005 | A | PASS |
Troy James
|
|
|
dan--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 3/31/2005 | 4/1/2005 | 4/1/2005 | A | PASS |
Troy James
|
|
|
dan--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 3/22/2005 | 3/23/2005 | 3/23/2005 | P | FAIL |
Troy James
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles shear ok and to insulate 3/23/2005 4:07:30 PM
|
BLD-Foundation | 12/10/2004 | 12/10/2004 | 12/10/2004 | P | PASS |
Jim Storey
|
|
|
jed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 12/7/2004 | 12/9/2004 | 12/9/2004 | P | PASS |
Dave Hannah
|
|
|
jed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore garage 12/9/2004 1:30:07 PM
|
BLD-Footing | 12/6/2004 | 12/7/2004 | 12/7/2004 | P | CANC |
Troy James
|
|
|
Ann; Phone #: ###-#### Internet Inspection Request from: Jan Rice
canc per contractor 12/7/2004 3:00:58 PM
|
BLD-Grading Inspection | 12/6/2004 | 12/6/2004 | 12/6/2004 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
PubWorks Subgrade Approval | 7/6/2004 | 7/6/2004 | 12/6/2004 | | DONE |
|
|
|
Letter from applicants geotechnical engineer indicating footing subgrade is acceptable must be approved by Public Works prior to scheduling footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 12/6/2004 | | |
|
|
|
|
BLD-Foundation | 11/2/2004 | 11/2/2004 | 11/2/2004 | P | PART |
Troy James
|
|
|
stem wall ###-####
foundation wall for house ok 11/2/2004 3:07:57 PM
|
Override - Activity Holds | | | 11/2/2004 | | |
|
|
|
|
BLD-Footing | 10/5/2004 | 10/6/2004 | 10/6/2004 | A | PASS |
Troy James
|
|
|
jed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 10/4/2004 | 10/5/2004 | 10/5/2004 | P | FAIL |
Troy James
|
|
|
jed; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Need approval by Terry Records 10/5/2004 4:21:18 PM
|
BLD-Grading Inspection | 10/5/2004 | 10/5/2004 | 10/5/2004 | | DONE |
|
|
|
subgrade for basement footing has been aopproved by the geotechnical engineer
|
Override - Activity Holds | | | 10/5/2004 | | |
|
|
|
|
Case Summary (BLD) | | | 9/22/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 9/22/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 9/22/2004 | | 9/22/2004 | | PASS |
|
|
|
final plat of Mendiko Sub. recorded.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 9/22/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 9/22/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 9/22/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/22/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/22/2004 | | DONE |
|
|
|
called and left message about the permit is ready to be picked up
|
Override - Activity Holds | | | 9/22/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/22/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/20/2004 | | DONE |
|
|
|
Mark Wagner has supplied resubmittals. ok to issue.
|
Plans ACCEPTED BY PLAN CHECK | | | 9/20/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/30/2004 | | FAIL |
|
|
|
PLANS HAVE BEEN ROUTED TO ME FOR STRUCTURAL REVIEW. HAVE CONTACTED OWNER FOR ADDITIONAL INFORMATION IN ORDER TO ISSUE PERMIT.
|
Plan Reviewer's activity | | | 7/30/2004 | | FAIL |
|
|
|
will hold plans until subdivision has been recorded and additional information being requested is received. insulated panel engineering and evaluation report, revision for overspan joist situation, and rated door between garage and house.
|
Routing - PLANNING | 6/30/2004 | | 7/21/2004 | | FAIL |
|
|
|
Mendiko Plat required to be recorded.
|
Routing - PLAN CHECK | 6/22/2004 | | 6/22/2004 | | HOLD |
|
|
|
Plans placed in hold drawer awaiting planning & planning land...
|
Routing - Erosion and Sediment | 6/18/2004 | | 6/21/2004 | | PASS |
|
|
|
ESC approved with conditons attached to plans.
|
Routing - FIRE | 6/21/2004 | | 6/21/2004 | | PASS |
|
|
|
No Fire sprinklers required.(Mendiko subdiv'n)
|
Routing - PLANNING | 6/17/2004 | | 6/17/2004 | | FAIL |
|
|
|
CFH04-00006 - 37-foot chimney is over max. allowed height of 35-feet (see rear elevation) kg.
**Note hold by land division until final plat is approved. This is also a condition of CFH04-6.
|
Routing - PLANNING Land Div | 6/11/2004 | | 6/16/2004 | | FAIL |
|
|
|
Do not issue permit until Final Plat of Mendiko Subdivsion is recorded. SUB04-00007.
|
Routing - PUBLIC WORKS | 6/10/2004 | | 6/10/2004 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 5/27/2004 | | 6/10/2004 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 1 with conditions of approval in letter from Boise Public Works attached to the plans.
|
Application received | | | 5/27/2004 | | |
|
|
|
|
Pending Assignment by DJO | 5/27/2004 | | | | |
Dan Overy
|
|
|
|