Permit Information
Permit NumberBLD04-01188
StatusFinaled
Name CM COMPANY
Site Address 12400 W MCMILLAN RD
Project NameCENTENNIAL HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
**CENTENNIAL HIGH SCHOOL PERFORMING ARTS CENTER** To construct a 32,606 sq. ft. one story, Type II-B fully fire sprinklered theater / classroom building. Other work includes all site improvements, paving and landscaping per approved plans and attachments, cup04-0002. Fire sprinklers are used for area. Building to have fire alarm system for theater with more than 1000 occupants and for group E area in accordance with Chapter 9 IBC as regulated by the Fire Dept.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/15/20063/15/20063/27/2006 DONE
Second Notice has not been responded to.
Second Notice BLD3/1/20063/1/20063/15/2006 DONE
First Notice has not been responded to.
First Notice 2/14/20063/1/2006 DONE
BLD-Final2/13/20062/14/20062/14/2006APASS
DetailsJim Sly
Bruce; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
OK for Perm Occ. (:
FIRE-Final Inspection2/10/20062/13/20062/14/2006PPASS
DetailsTroy Cobbley
Life safety finaled. Fire doors operated correctly. Per Sam the links on the stage sides only are ok.
Permanent Occupancy 2/14/20062/14/2006 DONE
Details
Permanent occupancy  2/14/2006 DONE
Perm. Occ. Cert. # 10905 issued 2-14-06 to Centennial High School.
BLD-Final2/10/20062/13/20062/13/2006PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/10/2006 at 2:45:09 PM. Contact: ###-####.
Temporary occupancy  1/20/2006 DONE
Temp. Occ. Cert. # 5356 issued 1-20-06 to Centennial High School Performing Arts Center.
BLD-Final1/18/20061/19/20061/19/2006PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 1/18/2006 at 10:13:06 AM. Contact: ###-####.
OK for Temp OCC.........OK to Perm when Fire perms. ():
FIRE-Final Inspection1/18/20061/19/20061/19/2006APART
DetailsTroy Cobbley
A temporary occupancy was given with dave hanniman's permission. The two roll down fire doors are to remain closed until their operation is worked out. Provide "Fire Doors Do Not Obstruct"signs at both doors and provide occupant load signs for the three assembly areas.
FIRE-Final Inspection1/13/20061/18/20061/18/2006ACANC
DetailsTroy Cobbley
Duplicate inspection
FIRE-Final Inspection1/13/20061/18/20061/18/2006ACANC
DetailsTroy Cobbley
ran out of time for life safety inspection
Code Occupancy Approval11/2/200511/2/200511/7/2005PPASS
DetailsCarol Montgomery
Complies w/ CUP04-0002 Plans on site.
(Addendas 1,2, & 3 dated May 14, 2005.
PubWorks Occupancy Approval11/3/200511/3/200511/3/2005 DONE
Drainage project complete, signed permanent occupancy 11/02/05. R.Rokovitz
Extend Permit 180 days11/2/200511/2/200511/2/2005PCANC
DetailsCarol Montgomery
BLD-Conference10/18/200510/18/200510/18/2005PFAIL
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
C/N Ceiling in Auditorium not per Architects original spec.....Architect to approve "as built" auditorium ceiling.
BLD-Framing/Rough-in10/17/200510/17/200510/17/2005PFAIL
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Auditorium Ceiling not per Architects specs. Waiting for Architects approval for "as built" ceiling.
BLD-Framing/Rough-in9/1/20059/1/20059/2/2005PPART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Ceilings in small rooms OK
BLD-Framing/Rough-in8/3/20058/3/20058/3/2005PCANC
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/28/20057/29/20057/29/2005AFAIL
DetailsJim Sly
darrell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
C/N Arch to provide detail for Auditorium ceiling
BLD-Framing/Rough-in7/27/20057/28/20057/28/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/27/2005 at 1:07:06 PM.
Provide Eng. standard for Auditorium ceiling and call for insp.
BLD-Other7/14/20057/15/20057/15/2005ADEFR
DetailsMike Jordan
ross - Note: hookup roof drains to seepage beds - water test inpsect; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in6/22/20056/23/20056/23/2005APART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
C/N Architect to provide UL assembly for top of all 1hr rated walls to metal pan deck.
BLD-Framing/Rough-in5/31/20056/1/20056/1/2005APART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Interior E. & W. Auditorium walls, Ext. eyebrows, and misc interior walls OK.
BLD-Framing/Rough-in5/26/20055/27/20055/27/2005APART
DetailsJim Sly
bruce ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Looked at all metal stud walls....Need to check Eng for bracing later when time allows.
BLD-Framing/Rough-in4/26/20054/27/20054/27/2005APART
DetailsTom Arcoraci
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore hard lids in center baths ok and storage areas next to them box beams ok at front entry and rear entry furred aut framing ok at south bathroom and north office area
BLD-Framing/Rough-in4/7/20054/8/20054/8/2005APART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Rated Ceilings in storage rooms OK to cover. 4/8/2005 12:28:45 PM
BLD-Framing/Rough-in4/4/20054/4/20054/4/2005PPART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need Listed tested assembly from Architect that is do-able for 1hr ceilings in selected rooms. 4/4/2005 4:40:02 PM
Plan resubmittals received  11/1/2004 DONE
Received letter of transmittal with drainage calcs. and 5 sheets of C1.3 taken to Brian M per Marlene.
BLD-Foundation10/21/200410/22/200410/22/2004APART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Slab and stage wall.... MTI here... OK pending special insp reports and approvals. 10/22/2004 10:30:52 AM
BLD-Concrete10/12/200410/13/200410/13/2004APART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Footing at wall between lobby and auditorium OK pending MTI special insp tests and approvals 10/13/2004 10:09:35 AM
BLD-Foundation9/28/20049/29/20049/29/2004APART
DetailsJim Sly
BRUCE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Pouring small Sect of wall N E corner and Sm sect foot @ S E co 9/29/2004 11:49:50 AM
BLD-Foundation9/22/20049/23/20049/23/2004APART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Poured most of West wall and footing... A-2 to B-2 OK pending MTI special insp and appr. 9/23/2004 11:36:24 AM
BLD-Footing9/16/20049/17/20049/17/2004APART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Foot at West wall and 3/4 of south wall OK Pending special insp reports and appr. 9/17/2004 10:55:40 AM
BLD-Foundation9/16/20049/17/20049/17/2004ANR
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore !st pour of foundation walls NR....Need extra verts on order. 9/17/2004 10:56:48 AM
BLD-Footing9/13/20049/14/20049/14/2004APART
DetailsJim Sly
bruce cell ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie MTI Doing special insp. Partial footing insp at area B OK Pending special insp testing and appr. 9/14/2004 11:12:20 AM
(F) Reprint permit  8/25/2004  
Inspection Record Card- Bld  8/24/2004 DONE
Print Occupancy Form  8/24/2004 DONE
Permit Ready to Issue  8/24/2004 DONE
Telephone call  8/24/2004 DONE
permit ready and fee due
Issue PAID IN FULL permit  8/24/2004 DONE
Routing - PLANNING8/19/2004 8/23/2004 PASS
Ok per CUP04-02.
PLANS/APPL TAKEN TO FRONT DESK  8/23/2004 DONE
Plan assigned to (MLO)6/1/2004 8/23/2004 PASS
DetailsMike Otto
8/23/2004 15:29:04 MLO - activity updated through activity BLDA022 from case BLD04-01188.
Routing Off Site - STRUCTURAL7/29/2004 8/23/2004 PASS
Called PDQ for pick -up
Routing - FIRE8/19/2004 8/19/2004 PASS
Resubmittal acceptable.
Plan resubmittals received  8/19/2004 DONE
Received letter of transmittal,three fax transmittals & response with structural calcs. taken to Mike Otto.
Routing - PLAN CHECK8/10/2004 8/19/2004 PASS
Plan resubmittals received  8/18/2004 DONE
Received Transmittal Letter, 1 Set of A2.02, A2.03,E2.11F Taken to Mike Otto...
Plan resubmittals received  8/18/2004 DONE
Received Transmittal Letter, & 2 Sets of A1.00,A1.01,A3.02 Taken to Mike Otto...
Routing - Erosion and Sediment8/9/2004 8/10/2004 PASS
ESC plan approved with attached conditions.
Plan resubmittals received  8/9/2004 DONE
Received Transmittal Letter, 3 Structural Calc Booklets 2 Sets of C1.2,C1.3,C1.4,C1.5,A1.00,A1.01,A2.01,A5.01 Taken to Mike Otto....
Routing - PLANNING7/30/2004 8/3/2004 FAIL
North elevation - 4 windows removed - add windows back somewhere on this elevation for staff to review.
Site Plan - widen parking stalls to 9-feet wide and show bike rack. KG
Plan resubmittals received  7/29/2004 DONE
Received Transmittal Letter, 2 Structural Calc books 2 Sets of A0.02,A2.03,A5.01,A6.02,S1.0,S2.0,S2.1,S2.2,S3.0,S3.1,S3.2,S3.3,S4.1,S5.0,S5.1,S5.2,S6.0S6.1,P1.0,P2.0,P2.1,P3.0,P3.1,M1.0,M1.1,M2.0,FP1.0,E3.00...& 1 set of S1.0,S2.0,S2.1,S2.2,S3.0,S3.1,S3.2,S3.3,S4.1,S5.0,S5.1,S5.2,S6.0S6.1 Taken to Mike Otto
Plan Review Completed(1st rev)  7/8/2004 FAIL
failed structural, ESC, planning, plan check and fire.
Routing - PLAN CHECK7/8/2004 7/8/2004 FAIL
Routing - FIRE6/30/2004 7/8/2004 FAIL
FD access, sprinler flow, fire extinguiisher and building review resubmittal comments relating to IFC. Review faxed to architect.
Plan resubmittals requested  6/30/2004 DONE
IBC corrections
Routing Off Site - STRUCTURAL6/2/2004 6/30/2004 FAIL
Contacted PDQ for pickup Corrections sent to architect
Routing - PLAN CHECK6/16/2004 6/30/2004 FAIL
corrections sent to architect
Routing - PLUMBING6/16/2004 6/16/2004 PASS
1. branch drains over five feet need cleanouts(not shown on p2.0) 2. water line to concession stand needs backflow preventor as it is a seperate building.
Routing - PLANNING6/15/2004 6/15/2004 FAIL
Need bike rack, class III trees, and February 1/, 2004 colored elevations before I can approve (CUP04-02). Called Ed Daniels on 6-15-2004.
Routing - Erosion and Sediment6/14/2004 6/15/2004 FAIL
Contractor is listed as CM company. Individual listed as RP not certified by Boise City.
Routing - PUBLIC WORKS6/3/2004 6/14/2004 PASS
Routing - PLANNING Land Div6/2/2004 6/2/2004 PASS
Site is over 5 acres in size.
Pending Assignment by JCM5/29/2004 6/1/2004 DONE
DetailsJohn Menard
6/1/2004 07:47:07 JCM - activity updated through activity BLDA174 from case BLD04-01188.
Plans ACCEPTED BY PLAN TECH  5/29/2004 DONE
Took 2 Project Manuals to Mike Otto ...
Application received  5/28/2004  
Recd Pcfee & Taken To Pln CK  5/28/2004  
Fee Review-notes5/28/20045/28/2004