Permit Information
Permit NumberBLD04-01189
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 138 N BRUCE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for an extensive remodel of an existing single family dwelling and a upper level addition of 876s.f. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." Separate electrical, plumbing, mechanical and ESC permits are required. R-2 ok per smc..CAA04-98. All per the approved plans as marked and attached Engineering; REScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/27/2005 DONE
BLD-Final12/22/200512/23/200512/23/2005PPASS
DetailsDave Hannah
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie all c/n items completed
DOC - Permit Finaled12/23/200512/23/200512/23/2005PPASS
DetailsDave Hannah
BLD-Final12/22/200512/22/200512/22/2005PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/22/2005 at 7:30:06 AM. Contact: ###-####. patch 5/8 gyp on garage ceilling and wrap posts/ address numbers
BLD-Final12/21/200512/21/200512/21/2005PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/21/2005 at 7:08:53 AM. Contact: ###-####. Mike called to canc intil ele
Case Summary (BLD)  12/8/2005  
BLD-Energy code compliance3/15/20053/15/20053/15/2005PPASS
DetailsTroy James
BLD-Energy code compliance3/3/20053/4/20053/4/2005AFAIL
DetailsTroy James
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles no energy calcs 3/4/2005 10:17:18 AM
BLD-Framing/Rough-in2/23/20052/23/20052/24/2005PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/23/2005 at 7:58:11 AM. Contact: ###-####.
BLD-Framing/Rough-in2/23/20052/24/20052/24/2005AFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 2/23/2005 at 4:53:25 PM. Contact: ###-####. draft stop high wall at ceiling by bathroom, window at stair need to be tempered 2/24/2005 9:02:37 AM
BLD-Conference2/24/20052/24/20052/24/2005ACANC
DetailsTony Young
BLD-Framing/Rough-in2/23/20052/23/20052/23/2005PNH
DetailsTroy James
Scheduled by a contractor via Hello! on 2/23/2005 at 7:58:11 AM. Contact: ###-####.
BLD-Framing/Rough-in2/3/20052/4/20052/4/2005PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/3/2005 at 9:35:41 AM. Contact: ###-####. c/n on site 2/4/2005 1:46:35 PM
Case Summary (BLD)  1/31/2005  
BLD-Footing7/30/20047/30/20047/30/2004PNR
DetailsTroy James
Scheduled by a contractor via Hello! on 7/30/2004 at 10:03:46 AM. Contact: ###-####.
BLD-Footing7/28/20047/29/20047/29/2004ANR
DetailsTroy James
Scheduled by a contractor via Hello! on 7/28/2004 at 6:15:44 PM. Contact: ###-####.
Application received  5/28/2004  
Plan assigned to (PEP)5/28/2004 5/28/2004 PASS
DetailsPerry Paine
5/28/2004 15:42:59 PEP - activity updated through activity BLDA022 from case BLD04-01189.
Case Summary (BLD)  5/28/2004  
Plan Review Report  5/28/2004  
PLANS/APPL TAKEN TO FRONT DESK  5/28/2004 DONE
Inspection Record Card- Bld  5/28/2004 DONE
Issue PAID IN FULL permit  5/28/2004 DONE