Case Summary (BLD) | | | 2/23/2007 | | |
|
|
|
|
DOC - Permit Finaled | 12/8/2004 | 12/8/2004 | 12/8/2004 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 12/8/2004 8:46:42 AM
|
BLD-Final | 12/8/2004 | 12/8/2004 | 12/8/2004 | A | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 12/3/2004 | 12/6/2004 | 12/6/2004 | A | PASS |
Jim Storey
|
|
|
per jim
|
BLD-Foundation | 12/3/2004 | 12/6/2004 | 12/6/2004 | A | PASS |
Jim Storey
|
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 12/3/2004 | | |
|
|
|
Okay to inspect carport footing. Carport must be 5' away from property line as original drawings indicated.
|
Override - Parcel Holds | | | 12/3/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 12/3/2004 | | |
|
|
|
|
BLD-Conference | 11/29/2004 | 11/30/2004 | 11/30/2004 | P | PART |
Lane Manuel
|
|
|
david; Phone #: ###-####2 Internet Inspection Request from: Barbara Moore
one layer 5/8 type x drywall @ gable end fill framing above wall 11/30/2004 2:50:28 PM
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 11/29/2004 | | |
|
|
|
scheduling a conference for Bld for storage area
|
MISC ACTIONS | | | 11/29/2004 | | DONE |
Dena Gambrel
|
|
|
Stop Work order issued on this location for building the structure not per the approved plans. Meeting with Scott Spjute and Cody Riddle resulted in a lifting of the SWO and an issuing of a NOV to either obtain a variance for the carport or move the carport back 5 feet from the side property line per the plans that were approved by the City.
|
BLD-Conference | 11/22/2004 | 11/23/2004 | 11/23/2004 | A | DONE |
Dave Hannah
|
|
|
David; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Conference | 11/23/2004 | 11/23/2004 | 11/23/2004 | P | DONE |
Dave Hannah
|
|
|
David; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 11/22/2004 | | |
|
|
|
tagged for ele. & Plum. only
|
BLD-Foundation | 10/28/2004 | 11/1/2004 | 11/1/2004 | A | PASS |
Jim Storey
|
|
|
###-####
|
Override - Parcel Holds | | | 10/28/2004 | | |
|
|
|
|
BLD-Conference | 10/26/2004 | 10/27/2004 | 10/27/2004 | A | PASS |
Jim Storey
|
|
|
David; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner wip 10/27/2004 9:48:04 AM
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/26/2004 | | |
|
|
|
Inspection only-Okay per Cody
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/27/2004 | | |
|
|
|
|
Case Summary (BLD) | | | 9/27/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/27/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/27/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/27/2004 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/27/2004 | | DONE |
|
|
|
|
BLD-Wall cover | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | PART |
Jim Storey
|
|
|
david Note: sheetrock on the carport post - also possible after 9:00 am; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles exterior post protection ok at front of building. 9/22/2004 9:01:10 AM
|
Application received | | | 6/1/2004 | | |
|
|
|
|
Plan assigned to (PEP) | 6/1/2004 | | 6/1/2004 | | PASS |
Perry Paine
|
|
|
6/1/2004 10:23:27 PEP - activity updated through activity BLDA022 from case BLD04-01192.
|
Print Pending Permit.LaserJet4 | | | 6/1/2004 | | |
|
|
|
|
Case Summary (BLD) | | | 6/1/2004 | | |
|
|
|
|
Plan Review Report | | | 6/1/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/1/2004 | | DONE |
|
|
|
|