(F) Reprint permit | | | 12/14/2006 | | DONE |
|
|
|
|
Code Occupancy Approval | 3/2/2005 | 3/1/2005 | 3/1/2005 | A | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF. 3/2/2005 11:37:07 AM
|
Letter of compliance | | | 3/1/2005 | | DONE |
|
|
|
Letter of Compliance issued 3-1-05.
|
BLD-Final | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Tom Arcoraci
|
|
|
Dean-late in the afternoon; Phone #: ###-#### Internet Inspection Request from: Jan Rice final ok 2/25/2005 3:26:46 PM
|
FIRE-Final Inspection | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 2/25/2005 1:57:49 PM
|
FIRE-Final Inspection | 2/3/2005 | 2/3/2005 | 2/3/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide landing at the east exit, provide address, remove thumbturn from the main exit/entrance, repair the exit discharge light at the east exit. 2/3/2005 3:40:58 PM
|
BLD-Final | 1/27/2005 | 1/31/2005 | 1/31/2005 | A | CANC |
Tom Arcoraci
|
|
|
###-####
|
FIRE-Final Inspection | 1/27/2005 | 1/28/2005 | 1/28/2005 | A | FAIL |
Rick Jackson
|
|
|
###-#### No approved plans; talked to Dean and told him to have approved plans and reschedule - will need address and landing at street side exit 1/28/2005 10:55:58 AM
|
BLD-Framing/Rough-in | 12/1/2004 | 12/2/2004 | 12/2/2004 | A | NR |
Tom Arcoraci
|
|
|
Dean; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 11/17/2004 | 11/17/2004 | 11/17/2004 | P | PART |
Tom Arcoraci
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover ext 11/17/2004 3:00:01 PM
|
BLD-Framing/Rough-in | 11/8/2004 | 11/9/2004 | 11/9/2004 | A | PART |
Tom Arcoraci
|
|
|
Dean; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner siding and roof nailing ok 11/9/2004 10:15:48 AM
|
BLD-Footing | 9/16/2004 | 9/20/2004 | 9/20/2004 | A | PASS |
Tom Arcoraci
|
|
|
###-#### - dean Note: Please - early as possible before 10:00
|
BLD-Foundation | 9/10/2004 | 9/13/2004 | 9/13/2004 | A | PART |
Lane Manuel
|
|
|
GIL PLEASE CALL FOR ACCESS; Phone #: ###-#### Internet Inspection Request from: Annette Moore
footings only ok. 20ft # 4 bare copper electrode ok. 9/13/2004 10:20:19 AM
|
(F) Reprint permit | | | 9/3/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/2/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/9/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2004 | | DONE |
|
|
|
spoke with Bob -- permit is ready.
|
Plan assigned to (JCM) | 6/8/2004 | | 7/9/2004 | | PASS |
John Menard
|
|
|
7/9/2004 14:40:32 JCM - activity updated through activity BLDA022 from case BLD04-01222.
|
Routing - PLAN CHECK | 7/9/2004 | | 7/9/2004 | | PASS |
|
|
|
|
Routing - FIRE | 7/1/2004 | | 7/8/2004 | | PASS |
|
|
|
resubmittal acceptable with D. Miller approval of hydrant location.
|
Plan resubmittals received | | | 7/2/2004 | | DONE |
|
|
|
Received Transmittal Letter, 4 Sets of A-1 , A-2 , A-3 , A-4 , A-5 , A-6 , A-7 , A-8 Taken to John M. ....
|
Plan Review Completed(1st rev) | | | 6/30/2004 | | FAIL |
|
|
|
failed Plan check and fire.
|
Routing - PLAN CHECK | 6/23/2004 | | 6/24/2004 | | FAIL |
|
|
|
JOHN M
|
Plan resubmittals requested | | | 6/24/2004 | | |
|
|
|
Mailed the architect a copy of the nonstructural and structural plan review requesting revisions. JCM
|
Routing - PLUMBING | 6/21/2004 | | 6/23/2004 | | PASS |
|
|
|
recommend inch and half water service be brought into building in lieu of one inch shown on P1.1 for additional tenants
|
Routing - PLANNING | 6/16/2004 | | 6/21/2004 | | PASS |
|
|
|
Approved per DRH04-00069.
|
Routing Off Site - STRUCTURAL | 6/9/2004 | | 6/18/2004 | | DONE |
|
|
|
Received comment list from the consulting structural engineer. Revisions not significant & will be reviewed by City Plan Reviewer. JCM
|
Routing - PUBLIC WORKS | 6/10/2004 | | 6/16/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 6/16/2004 | | 6/16/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING Land Div | 6/8/2004 | | 6/9/2004 | | PASS |
|
|
|
Lot 5 of O'Jess Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2004 | | DONE |
|
|
|
|
Application received | | | 6/3/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2004 | | DONE |
|
|
|
|
Routing - FIRE | 6/24/2004 | | 6/30/2003 | | FAIL |
|
|
|
hydrant locations and flow issues. Review faxed to architect.
|
Fee Review-notes | 6/3/2004 | 6/3/2004 | | | |
|
|
|
|