Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/15/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice | | 5/12/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 12/9/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 12/2/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 1`0373 issued 12-2-04 to the J.R. Simplot Company.
|
Permanent Occupancy | | 11/29/2004 | 11/29/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/24/2004 | 11/29/2004 | 11/29/2004 | A | PASS |
Rick Jackson
|
|
|
Fire/life safety final okay 11/29/2004 11:20:24 AM
|
BLD-Final | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/15/2004 at 10:30:26 AM. Contact: ###-####. ok for temp occ ok for perm occ after fire alarm go perm 11/16/2004 10:37:21 AM
|
FIRE-Final Inspection | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/15/2004 at 10:31:14 AM. Contact: ###-####. Temp occupancy approved per Dave Miller for fire alarm - need detectors at doors with hold opens 11/16/2004 12:05:39 PM
|
BLD-Final | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/12/2004 at 8:34:36 AM. Contact: ###-####. cable trays not protected per listing. doors not latching/ separate permit needed for sucurty firerated stairs and rated door function. 11/12/2004 2:46:43 PM
|
FIRE-Final Inspection | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | FAIL |
Rick Jackson
|
|
|
Rated doors not latching; it appears card reader access control locks are being installed by tenant contractors - a separate permit will be required to interface with alarm system with motion sensor and push to exit button release; hang fire extinguishers 11/12/2004 2:50:26 PM
|
BLD-Framing/Rough-in | 9/23/2004 | 9/24/2004 | 9/24/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 5:38:37 PM. Contact: ###-####. ok to cover north half 9/24/2004 2:14:31 PM
|
BLD-Framing/Rough-in | 8/27/2004 | 8/27/2004 | 8/27/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/27/2004 at 9:54:36 AM. Contact: ###-####. short wall bracing ok 8/27/2004 4:13:29 PM
|
BLD-Energy code compliance | 8/24/2004 | 8/26/2004 | 8/26/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/24/2004 at 10:18:37 AM. Contact: ###-####. ok to cover walls 8/26/2004 9:52:15 AM
|
BLD-Wall cover | 8/19/2004 | 8/20/2004 | 8/20/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/19/2004 at 2:57:22 PM. Contact: ###-####. ok to cover one side but need to remove screws from top track that have run into ceiling grid also need braceing on 4 and 6 high walls and detail on soffit item 17 on plans 8/20/2004 10:36:29 AM
|
Issue PAID IN FULL permit | | | 8/5/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/12/2004 | | 7/30/2004 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/30/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/30/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/30/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan assigned to (CJW) | 6/14/2004 | | 7/30/2004 | | PASS |
Carl Westfall
|
|
|
7/30/2004 09:50:56 CJW - activity updated through activity BLDA022 from case BLD04-01253.
|
Plan resubmittals received | | | 7/28/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Sets of A0.1,A1.1, A2.1,A3.1,A6.1,A10.1 Taken to Carl Westfall
|
Routing - FIRE | 7/1/2004 | | 7/9/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/9/2004 | | FAIL |
|
|
|
failed plan check.
|
Plan resubmittals received | | | 7/2/2004 | | DONE |
|
|
|
Received Transmittal Letter, 3 Sets of M0.1 , M0.2 , M1.1 , M2.1 , M4.1 , MPS1 , P0.1 , P2.1, E1.1 , E2.1 , E2.2 Taken to Carl Westfall...
|
Routing - PLAN CHECK | 6/16/2004 | | 7/1/2004 | | |
|
|
|
Failed first IBC plan review. IBC plan review started June 29, 2004 and was finished July 1, 2004. A response from the archtiect was required. See the plan review report. A copy was E-mailed to the architect.
|
Routing - PUBLIC WORKS | 6/14/2004 | | 6/16/2004 | | PASS |
|
|
|
|
Application received | | | 6/7/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/7/2004 | | |
|
|
|
|
Fee Review-notes | 6/7/2004 | 6/7/2004 | | | |
|
|
|
|