Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01255
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Building 2
Customer Number6191
ePlanReviewNo
Description
Micron Building #2 - Remodel Old Smock and Bootie for CVD, Photo - (#02-20036191) - To demo and remove some interior partitions, doors and ceiling; to demo some interior concrete slab floor areas and excavate to five feet. To pour new structural concrete retaining walls and recessed concrete floor for new access floor system. To install new cleanroom walls, doors and cleanroom HEPA ceilings system to create s 746 sq. ft. RDA Bay 7 (104C), a 914 sq. ft. Plenum 318 (104A) and a 497 sq. ft. Diffusion Bay 6 (104B). On the second floor remove HVAC equipment, remove floor trusses, install new steel framing and floor system level with adjacent floor level. To reinstall some of the existing mechanical equipment and install some new HVAC equipment. Fit-up area for future use with lighting, exhaust, water, power, and gas monitoring systems. This project also includes the construction of a new 120 sq. ft. addition at the west wall of Building #2, costructed of concrete foundation and subfloor, metal stud,joists, siding and roofing. This addition will house a new vertical recirculating fan air handling unit. This work is being done in an approximate 2500 square foot area of the north end of the first floor of Building #2, between grid lines #a & #D and #6 & #7.6. And at the northeast end of the second floor of Building #2 between grid lines #B & #D and #6 & #7.6. The sprinklers are used for area and story increases. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/31/2005 DONE
Letter of compliance  12/20/2004 DONE
Letter of Compliance issued 12-20-04.
FIRE-Final Inspection11/22/200411/23/200411/23/2004APASS
DetailsRick Jackson
Internet Inspection Request from: Wayne Berry
BLD-Conference11/22/200411/22/200411/22/2004APASS
DetailsJim Storey
Accoustical ceiling Internet Inspection Request from: Wayne Berry
FIRE-Final Inspection11/17/200411/18/200411/18/2004PFAIL
DetailsRick Jackson
Cell Phone ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino need temp doors removed and hallway clear; complete alarm and sprinkler permits 11/18/2004 4:20:11 PM
BLD-Final11/5/200411/8/200411/8/2004ANR
DetailsJim Storey
Pat; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
BLD-Conference10/19/200410/20/200410/20/2004PPASS
DetailsJim Storey
Internet Inspection Request from: Wayne Berry
BLD-Footing9/22/20049/24/20049/24/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/22/2004 at 10:16:02 AM. Contact: ###-####. si 9/24/2004 2:05:27 PM
BLD-Footing9/22/20049/23/20049/23/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/22/2004 at 10:15:46 AM. Contact: ###-####.
BLD-Footing9/22/20049/22/20049/22/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/22/2004 at 10:15:30 AM. Contact: ###-####.
BLD-Footing9/8/20049/10/20049/10/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/8/2004 at 9:34:32 AM. Contact: ###-####. wip 9/10/2004 2:06:38 PM
BLD-Footing9/8/20049/8/20049/8/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/8/2004 at 9:34:11 AM. Contact: ###-####. si 9/8/2004 3:30:43 PM
BLD-Footing8/27/20049/1/20049/1/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/27/2004 at 2:05:03 PM. Contact: ###-####.
BLD-Footing8/27/20048/31/20048/31/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/27/2004 at 2:04:44 PM. Contact: ###-####.
BLD-Footing8/23/20048/26/20048/26/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/23/2004 at 2:25:28 PM. Contact: ###-####.
BLD-Footing8/23/20048/26/20048/26/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/23/2004 at 2:25:28 PM. Contact: ###-####.
BLD-Footing8/23/20048/25/20048/25/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/23/2004 at 2:25:07 PM. Contact: ###-####. rebar ok pending si. 8/25/2004 9:19:57 AM
BLD-Footing8/24/20048/24/20048/24/2004PPART
DetailsJim Storey
si 8/25/2004 8:24:45 AM
BLD-Footing8/23/20048/24/20048/24/2004ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/23/2004 at 2:24:48 PM. Contact: ###-####.
BLD-Footing8/17/20048/20/20048/20/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/17/2004 at 3:26:44 PM. Contact: ###-####.
BLD-Footing8/17/20048/19/20048/19/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/17/2004 at 3:26:23 PM. Contact: ###-####. pending sp inp 8/19/2004 1:15:29 PM
BLD-Footing8/17/20048/18/20048/18/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/17/2004 at 3:26:04 PM. Contact: ###-####. pwsi 8/18/2004 10:56:37 AM
BLD-Footing8/11/20048/16/20048/16/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/11/2004 at 2:41:38 PM. Contact: ###-####. placed with s/i 8/16/2004 2:59:27 PM
BLD-Footing8/11/20048/13/20048/13/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/11/2004 at 2:41:19 PM. Contact: ###-####. maintane 3 inch clearance to soil/ pending special insp. reports, 8/13/2004 9:46:14 AM
BLD-Footing8/11/20048/12/20048/12/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/11/2004 at 2:41:01 PM. Contact: ###-####. pwsi 8/12/2004 3:24:56 PM
BLD-Footing8/9/20048/11/20048/11/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/9/2004 at 8:19:45 AM. Contact: ###-####. pwsi 8/11/2004 3:02:28 PM
BLD-Footing8/9/20048/10/20048/10/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/9/2004 at 8:19:29 AM. Contact: ###-####. wip 8/10/2004 5:09:21 PM
BLD-Footing8/9/20048/9/20048/9/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/9/2004 at 8:19:09 AM. Contact: ###-####. shoring in place for colm. ft removal/ 8/9/2004 3:19:35 PM
BLD-Footing7/28/20047/30/20047/30/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/28/2004 at 10:20:47 AM. Contact: ###-####.set up to cut utility trench and east exavation 1/2 way to the west peir colm. ft stable at this time. 7/30/2004 10:34:21 AM
BLD-Footing7/28/20047/29/20047/29/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/28/2004 at 10:20:30 AM. Contact: ###-####. wip 7/29/2004 10:18:52 AM
BLD-Footing7/28/20047/28/20047/28/2004PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/28/2004 at 10:20:10 AM. Contact: ###-####.exavation in progess. 7/28/2004 2:18:06 PM
BLD-Conference7/15/20047/15/20047/15/2004PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry const. exit maintained for all exit loads/demo underway ok 7/15/2004 12:52:52 PM
BLD-Conference7/6/20047/8/20047/8/2004APART
DetailsJim Storey
Review Marcolina's plan for exiting during construction.; Phone #: ###-#### Internet Inspection Request from: Wayne Berry plan will be on site. 7/8/2004 10:58:18 AM
BLD-Conference7/2/20047/2/20047/2/2004PNR
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry
FIRE-Conference7/2/20047/2/20047/2/2004PPART
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Wayne Berry Met with Jim Storey and Wayne about exiting during the construction; will need plans from Micron for this for review and approval prior to implementing 7/2/2004 1:55:52 PM
Inspection Record Card- Bld  6/30/2004 DONE
Print Occupancy Form  6/30/2004 DONE
Telephone call  6/30/2004 DONE
PERMIT READY AND FEE DUE
Permit Ready to Issue  6/30/2004 DONE
Issue & PRINT to be Invoiced  6/30/2004 DONE
Plan assigned to (JCM)6/10/20046/10/20046/29/2004 PASS
DetailsJohn Menard
6/29/2004 08:56:52 JCM - activity updated through activity BLDA022 from case BLD04-01255.
PLANS/APPL TAKEN TO FRONT DESK  6/29/2004 DONE
Routing - FIRE6/22/2004 6/28/2004 PASS
Plan Review Completed(1st rev)  6/28/2004 PASS
Plan Reviewer's activity  6/22/2004 PASS
Plans reviewed and approved as submitted with attached comment list. JCM
Routing - PLAN CHECK6/16/2004 6/22/2004 PASS
Routing - PLUMBING6/14/2004 6/16/2004 PASS
Routing - PUBLIC WORKS6/11/2004 6/14/2004 PASS
Routing - Erosion and Sediment6/14/2004 6/14/2004 NR
per Jenifer no ESC permit required on Micron.
Plan resubmittals received  6/10/2004 DONE
Received Transmittal Letter, 1 Set with sheets S0.1, S2.1.1, SD2.1.1, S2.2.1, SD2.2.1, S3.1, S3.2, S5.1, S5.2, S5.3, S5.4, SD8.1 ... Taken to John Menard
Plans ACCEPTED BY PLAN TECH  6/10/2004 DONE
No Encelope,Lighting, Mechanical Compliance Sheet/or signed..
Application received  6/7/2004  
BLD-Final11/22/200411/23/2004 A 
DetailsJim Storey
Internet Inspection Request from: Wayne Berry
Fee Review-notes6/7/20046/7/2004   
Routing - PLAN CHECK6/28/2004   PASS