Permit NumberBLD04-01262
StatusFinaled
Name SLEIGHT CONSTRUCTION, INC.
Site Address 4444 W GINZEL ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3174 sq. ft. three story single family dwelling with a attached 702 sq. ft. three car garage, 387 sq. ft. of deck area and a 254 sq. ft. covered concrete patio per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space shall be maintained. Unless otherwise approved by the Boise City Fire Department, this structure shall be fitted with a 13D sprinkler system. Any and all NFPA 13D systems shall be equipped with an alarm initiating device, commonly referred to as a flow switch and an outside indicating device. (lower level 812 sq. ft.)(main level 2022 sq. ft.)(upper level 340 sq. ft.) PC #348 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/14/20054/15/20054/15/2005APASS
DetailsTony Young
fred ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
DOC - Permit Finaled4/15/20054/15/20054/15/2005APASS
DetailsTony Young
Finaled by inspector at 4/15/2005 11:01:19 AM
BLD-Conference4/4/20054/4/20054/4/2005ACANC
DetailsTony Young
BLD-Conference3/31/20054/1/20054/1/2005APART
DetailsTony Young
fred; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
needs trades, guard rail, hillside 4/4/2005 8:03:10 AM
BLD-Grading Inspection3/30/20053/30/20053/30/2005 DONE
Final grading and drainage approved
BLD-Conference3/28/20053/29/20053/29/2005APART
DetailsTony Young
###-#### - fred
need trades,, guardrail per code,, hillside,, etc 3/30/2005 3:53:35 PM
BLD-Conference3/28/20053/28/20053/28/2005PCANC
DetailsTony Young
###-#### - fred
FIRE-Supply Line Flush3/3/20053/4/20053/4/2005PPASS
DetailsTroy Cobbley
Underground flush passed. 3/4/2005 4:13:39 PM
BLD-Other12/30/20041/3/20051/3/2005APASS
DetailsTony Young
Fred-sheer nail; Phone #: ###-#### Internet Inspection Request from: Jan Rice
int. shear 1/3/2005 10:22:53 AM
BLD-Energy code compliance12/17/200412/20/200412/20/2004APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 12/17/2004 at 1:12:59 PM. framing corrections ok 12/20/2004 9:11:33 AM
FIRE-Sprinkler Rough-in12/17/200412/20/200412/20/2004APASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover 12/20/2004 9:28:05 AM
BLD-Framing/Rough-in12/14/200412/15/200412/15/2004APART
DetailsDave Hannah
Fred; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to insulate point load at bottom of stairs north side fire blocking furred out wall nain level master bedroom and furred down for duct work in basement 12/15/2004 10:27:05 AM
BLD-Other11/22/200411/22/200411/22/2004PPART
DetailsTony Young
Fred-Shear Wall; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
exterior shear ok 11/22/2004 1:50:33 PM
BLD-Other9/29/20049/29/20049/29/2004PPART
DetailsTony Young
basement floor - footings ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation9/23/20049/23/20049/23/2004PPASS
DetailsTroy James
ben; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/22/20049/22/20049/22/2004PPART
DetailsTony Young
ben; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
missed ftg,,, wip 9/22/2004 3:33:42 PM
BLD-Footing9/20/20049/21/20049/21/2004APART
DetailsTony Young
Scheduled by a contractor via Hello! on 9/20/2004 at 1:01:19 PM. Contact: ###-####.
wip on garage and upper ftgs 9/21/2004 11:31:02 AM
BLD-Grading Inspection9/21/20049/21/20049/21/2004 DONE
Footing subgrade for for garage and main level have been approved by the geotechnical engineer.
BLD-Foundation9/20/20049/20/20049/20/2004PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 9/20/2004 at 7:43:14 AM. Contact: ###-####.
BLD-Energy code compliance9/7/20049/7/20049/7/2004PPART
DetailsTony Young
fred; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
insulation in foundation wall ok 9/8/2004 9:37:59 AM
BLD-Foundation8/26/20048/27/20048/27/2004PPART
DetailsTony Young
ben; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
walls on east side,, wip 8/27/2004 3:13:21 PM
BLD-Footing8/23/20048/23/20048/23/2004PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/23/2004 at 6:42:49 AM. Contact: ###-####.
wip on basement ftgs on east area 8/23/2004 4:11:03 PM
BLD-Grading Inspection8/20/20048/20/20048/20/2004 DONE
Footing subgrade for basement has been approved by the geotechnical engineer
BLD-Footing8/19/20048/20/20048/20/2004ANR
DetailsTroy James
ben; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Needs geotech report to terry records for approval. 8/20/2004 9:28:23 AM
PubWorks Subgrade Approval6/29/20046/29/20048/20/2004 DONE
Footing subgrade must be approved by the geotechnical engineer prior to calling for footing inspection. Call Terry Records at ###-####
Override - Activity Holds  8/19/2004  
(F) Reprint permit  8/19/2004 DONE
Override - Activity Holds  8/19/2004  
(F) Reprint permit  8/19/2004 DONE
Override - Activity Holds  7/21/2004  
Issue PAID IN FULL permit  7/21/2004 DONE
Meeting  7/21/2004 DONE
Meeting with the home G.C. to verify fire sprinkler requirements. This is a 13D and not a modified system! Change Scope of Work by deleting "modified." Indicated an outside bell with a flow switch (usually supplied by the fire sprinkler contractor). Gave list of sprinkler contractors and indicated they will be paying for the separate permit fees.
Plan assigned to (DJO)7/16/20047/16/20047/16/2004 PASS
Plan Review Report  7/16/2004 DONE
Override - Activity Holds  7/16/2004  
Permit Ready to Issue  7/16/2004 DONE
Pending Assignment by DJO6/8/2004 7/16/2004 DONE
DetailsDan Overy
7/16/2004 13:31:01 DJO - activity updated through activity BLDA169 from case BLD04-01262.
Plans ACCEPTED BY PLAN CHECK  7/16/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/16/2004 DONE
Routing - Erosion and Sediment7/14/2004 7/14/2004 PASS
ESC plan approved with attached conditions.
Routing - FIRE7/7/2004 7/14/2004 DONE
Fire Sprinklers will be required per review by D. Miller, due to FD vehicle accessibility difficulty of Ginsel St.
Routing - PLANNING7/13/2004 7/14/2004 PASS
O.K. per revised set of drawings submitted on 7/13/04. CER
Routing - PLANNING6/30/2004 7/1/2004 FAIL
Spoke w/ Fred Slait, requested a site plan to scale so we can begin our review. 9:45 a.m. 7/1/04 CER
Routing - PLANNING Land Div6/30/2004 6/30/2004 PASS
Approved in Ada County prior to annexation.
Routing - PLANNING Land Div6/18/2004 6/24/2004 FAIL
Need to verify legal land division. Called Fred Slaight on June 24, 2004.
Routing - PUBLIC WORKS GRADING6/17/2004 6/17/2004 PASS
DetailsRita DeYoung
Grading and drainage approved with conditions of approval in letter from Boise Public Works attached to plans.
Routing - PUBLIC WORKS6/17/2004 6/17/2004 PASS
NORTHWEST BOISE SEWER DISTRICT
Routing - PUBLIC WORKS GRADING6/8/2004 6/10/2004 FAIL
DetailsRita DeYoung
Footing subgrade not 2 feet below grade
Application received  6/8/2004  
Routing - PLAN CHECK7/14/2004