(F) Reprint permit | | | 9/12/2006 | | DONE |
|
|
|
|
Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/14/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 10/27/2005 | 10/27/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/2/2005 | 10/27/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 6/2/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10619 issued 6-2-05 to Springhill Suites by Marriott.
|
BLD-Final | 5/31/2005 | 6/1/2005 | 6/1/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 4:29:05 PM. OK for Perm Occ. :)
|
Permanent Occupancy | | 6/1/2005 | 6/1/2005 | | DONE |
|
|
|
|
BLD-Final | 5/25/2005 | 5/26/2005 | 5/27/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 3:51:30 PM. OK for Temp Occ. Landscape Bonded. C/N Obtain all req signatures for Perm Occ within 90 days of this notice.
|
FIRE-Final Inspection | 5/17/2005 | 5/23/2005 | 5/23/2005 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 5/16/2005 | 5/17/2005 | 5/17/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Sam Rogers permission. Items needing correcting are adding exit discharge lighting outside of the main exit, adding emergency lighting in the main lobby and in the south conference room, and adding a exit sign at the b
|
Code Occupancy Approval Temp | 5/18/2005 | 5/17/2005 | 5/17/2005 | A | FAIL |
Carol Montgomery
|
|
|
Bond was posted - Temporary Signed. 5/18/2005 9:00:45 AM
|
BLD-Final | 5/17/2005 | 5/17/2005 | 5/17/2005 | P | PART |
Jim Sly
|
|
|
OK for Temp Occ. C/N.... Obtain Perm Occ status within 90 days of this notice
|
Temporary occupancy | | | 5/17/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5241 issued 5-17-05 to Springhill Suites by Marriott.
|
BLD-Final | 5/13/2005 | 5/16/2005 | 5/16/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/13/2005 at 10:34:10 AM. Contact: ###-####.
|
BLD-Final | 5/12/2005 | 5/13/2005 | 5/13/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/12/2005 at 4:34:29 PM.
|
BLD-Conference | 5/12/2005 | 5/13/2005 | 5/13/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/12/2005 at 4:34:58 PM.
|
BLD-Wall cover | 5/11/2005 | 5/11/2005 | 5/11/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/11/2005 at 8:12:09 AM.
|
BLD-Wall cover | 5/4/2005 | 5/5/2005 | 5/5/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/4/2005 at 1:25:06 PM.
|
BLD-Energy code compliance | 4/19/2005 | 4/19/2005 | 4/19/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/19/2005 at 6:36:30 AM. Pool bldg OK. 4/19/2005 9:41:23 AM
|
BLD-Wall cover | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/14/2005 at 4:07:58 PM. Framing at pool cover OK but need to check (2) 4-6' shear panels Ea. side of openig @ East wall (6" oc nailing) 4/15/2005 9:57:48 AM 4/15/2005 9:58:20 AM
|
BLD-Conference | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 4:28:36 PM.
|
BLD-Wall cover | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 7:53:28 AM. 2nd 3rd and 4th Flr corridors OK. 4/7/2005 3:27:25 PM
|
BLD-Wall cover | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 5:12:20 PM. Firestop at 1st Flr corridors OK. 3/29/2005 10:54:11 AM
|
BLD-Wall cover | 3/22/2005 | 3/23/2005 | 3/23/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/22/2005 at 2:17:33 PM. Checked firestopping at central lobby common area.....still need to complete. 3/23/2005 10:37:32 AM
|
BLD-Wall cover | 3/22/2005 | 3/23/2005 | 3/23/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/22/2005 at 2:18:39 PM. Main lobby area and Porte Cochere. 3/23/2005 5:21:10 PM
|
BLD-Conference | 3/16/2005 | 3/17/2005 | 3/17/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/16/2005 at 3:41:57 PM. Met with Don to talk about Final inspections. 3/17/2005 12:08:57 PM
|
Print Occupancy Form | | | 3/17/2005 | | DONE |
|
|
|
|
BLD-Wall cover | 3/9/2005 | 3/11/2005 | 3/11/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/9/2005 at 8:16:42 AM. Checking firestopping at tub valves, spouts, and shower heads 3/11/2005 3:09:55 PM
|
BLD-Energy code compliance | 3/8/2005 | 3/8/2005 | 3/8/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/8/2005 at 9:46:53 AM.
|
BLD-Wall cover | 3/8/2005 | 3/8/2005 | 3/8/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/8/2005 at 9:47:15 AM.
|
BLD-Wall cover | 3/7/2005 | 3/7/2005 | 3/7/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 7:10:53 AM. Ongoing Misc Insp of Firestopping. 3/7/2005 12:41:59 PM
|
BLD-Wall cover | 3/3/2005 | 3/3/2005 | 3/3/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/3/2005 at 6:14:18 AM. misc walls. 3/3/2005 10:58:33 AM
|
BLD-Wall cover | 3/2/2005 | 3/2/2005 | 3/2/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 7:00:32 AM.
|
BLD-Wall cover | 2/25/2005 | 2/25/2005 | 2/25/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/25/2005 at 6:38:24 AM.
|
BLD-Footing | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/25/2005 at 6:38:51 AM. Pool.....MTI on site. 2/25/2005 12:30:05 PM
|
BLD-Footing | 2/23/2005 | 2/24/2005 | 2/24/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/23/2005 at 9:59:00 AM. Footing Pool area MTI special inspections. 2/24/2005 4:34:02 PM
|
BLD-Footing | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/23/2005 at 9:59:38 AM.
|
BLD-Wall cover | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/23/2005 at 3:24:02 PM. Exterior walls N of Elevator OK to cover. 2/24/2005 11:34:09 AM
|
BLD-Energy code compliance | 2/23/2005 | 2/23/2005 | 2/23/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/23/2005 at 8:27:45 AM.
|
BLD-Wall cover | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 8:37:00 AM.
|
BLD-Wall cover | 2/17/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 7:57:21 AM. All drops OK 2nd floor N. end. 2/22/2005 3:35:01 PM
|
BLD-Wall cover | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 3:41:16 PM.
|
BLD-Conference | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 3:13:03 PM. Contact: ###-####. OK to cover...4th floor rooms, 3rd floor rooms and 1st floor rooms (S. 1/2 only) 2/16/2005 9:25:54 AM 2/16/2005 9:27:01 AM
|
BLD-Energy code compliance | 2/15/2005 | 2/16/2005 | 2/16/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 3:13:54 PM. Contact: ###-####.
|
BLD-Wall cover | 2/14/2005 | 2/14/2005 | 2/14/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 6:15:46 AM.
|
BLD-Energy code compliance | 2/14/2005 | 2/14/2005 | 2/14/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 6:16:05 AM.
|
BLD-Wall cover | 2/11/2005 | 2/11/2005 | 2/11/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/11/2005 at 6:39:42 AM.
|
BLD-Wall cover | 2/11/2005 | 2/11/2005 | 2/11/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/11/2005 at 6:40:11 AM. OK to cover drops in rooms....S. 1/2 of bldg. 1st and 2nd floors. 2/11/2005 2:36:04 PM
|
BLD-Wall cover | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/10/2005 at 9:19:03 AM. Fix all holes in gyp above all fir downs 1st floor and recall for insp. 2/10/2005 4:27:10 PM
|
BLD-Wall cover | 2/7/2005 | 2/7/2005 | 2/7/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/7/2005 at 6:22:00 AM.
|
BLD-Energy code compliance | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/7/2005 at 6:22:22 AM.
|
BLD-Wall cover | 2/4/2005 | 2/4/2005 | 2/4/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 7:19:53 AM. 4th floor firestopping at walls in bathrooms ( S. end) OK 2/4/2005 12:16:00 PM
|
BLD-Energy code compliance | 2/4/2005 | 2/4/2005 | 2/4/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 7:20:17 AM.
|
BLD-Energy code compliance | 1/28/2005 | 2/1/2005 | 2/1/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/28/2005 at 7:48:47 AM. 2nd floor .....all rooms 2/1/2005 2:08:59 PM
|
BLD-Energy code compliance | 2/1/2005 | 2/1/2005 | 2/1/2005 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 6:37:16 AM.
|
BLD-Wall cover | 2/1/2005 | 2/1/2005 | 2/1/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 6:37:44 AM. 2nd flr all rooms 2/1/2005 2:10:04 PM
|
BLD-Wall cover | 1/31/2005 | 1/31/2005 | 1/31/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/31/2005 at 7:03:26 AM.
|
BLD-Energy code compliance | 1/31/2005 | 1/31/2005 | 1/31/2005 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/31/2005 at 7:03:50 AM.
|
BLD-Wall cover | 1/28/2005 | 1/28/2005 | 1/28/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/28/2005 at 7:49:39 AM. 3rd floor bathrooms OK (S. end) 1st flr S. rooms OK. 1/28/2005 4:22:04 PM
|
BLD-Energy code compliance | 1/27/2005 | 1/27/2005 | 1/27/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 7:14:48 AM. 1st floor.... S. rooms OK firecaulking and energy code. 1/27/2005 12:04:42 PM
|
BLD-Energy code compliance | 1/27/2005 | 1/27/2005 | 1/27/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 7:15:12 AM. 2nd floor Bathrooms OK to cover (S. Rooms) 3rd Floor Fir Down Soffits OK to cover (S. Rooms). 1/27/2005 5:07:10 PM
|
BLD-Wall cover | 1/25/2005 | 1/26/2005 | 1/26/2005 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 3:31:01 PM. Complete Firestopping at 2nd to 3rd floor flr/ceiling assembly Rooms S. 1/2 of 2nd flr. 1/26/2005 3:48:38 PM
|
BLD-Energy code compliance | 1/25/2005 | 1/26/2005 | 1/26/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 3:31:25 PM.
|
BLD-Energy code compliance | 1/25/2005 | 1/25/2005 | 1/25/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 9:46:14 AM.
|
BLD-Energy code compliance | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 7:51:12 AM.
|
BLD-Wall cover | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 7:51:40 AM. All Fire stopping OK in all rooms ..... S. 1/2 of Bldg 1st Flr. 1/24/2005 3:10:38 PM
|
BLD-Energy code compliance | 1/19/2005 | 1/21/2005 | 1/21/2005 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/19/2005 at 9:04:50 AM.
|
BLD-Conference | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/21/2005 at 10:23:03 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/20/2005 | 1/20/2005 | 1/20/2005 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 8:56:55 AM.
|
BLD-Wall cover | 1/17/2005 | 1/18/2005 | 1/18/2005 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 7:36:09 AM. Complete Firestopping of penitrations thru top plates and gyp ceiling membranes at dropped soffit areas.....1st flr Ext walls and 2nd flr rooms (S 1/2) 1/18/2005 10:27:08 AM
|
BLD-Framing/Rough-in | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 6:55:43 AM.
|
BLD-Framing/Rough-in | 1/14/2005 | 1/14/2005 | 1/14/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 6:24:14 AM. Elevator shaft OK to rock..... Corridor 2nd floor N. end OK to cover.
1/14/2005 10:54:05 AM 1/14/2005 10:55:07 AM
|
BLD-Energy code compliance | 1/12/2005 | 1/13/2005 | 1/13/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 5:21:50 PM. S. 1/2 of 2nd and 3rd floor OK. 1/13/2005 11:44:47 AM
|
BLD-Wall cover | 1/12/2005 | 1/13/2005 | 1/13/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 5:22:26 PM.
|
BLD-Framing/Rough-in | 1/11/2005 | 1/12/2005 | 1/12/2005 | A | PASS |
Jim Sly
|
|
|
ok to cover --tim- ###-#### cell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK to cover S 1/2 of 2nd floor. 1/12/2005 3:49:09 PM
|
BLD-Framing/Rough-in | 1/11/2005 | 1/12/2005 | 1/12/2005 | A | CANC |
Jim Sly
|
|
|
ok to cover --tim- ###-#### cell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Wall cover | 1/10/2005 | 1/11/2005 | 1/11/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/10/2005 at 3:51:36 PM.
|
BLD-Wall cover | 1/11/2005 | 1/11/2005 | 1/11/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/11/2005 at 9:26:12 AM. OK to cover corridors.... 2nd 3rd floors. 1/11/2005 4:04:06 PM
|
BLD-Wall cover | 1/10/2005 | 1/10/2005 | 1/10/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/10/2005 at 6:54:14 AM. OK to rock selected walls in Electr rm and boiler rm 1st flr. 1/10/2005 2:26:06 PM
|
BLD-Energy code compliance | 1/7/2005 | 1/7/2005 | 1/7/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/7/2005 at 6:22:09 AM. S. 1/2 of 2nd floor. 1/7/2005 12:20:09 PM
|
BLD-Energy code compliance | 1/5/2005 | 1/6/2005 | 1/6/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/5/2005 at 2:38:14 PM. Few units done..... 1/6/2005 12:35:28 PM
|
BLD-Wall cover | 1/5/2005 | 1/5/2005 | 1/5/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/5/2005 at 6:21:40 AM. Still insulating. 1/5/2005 2:57:45 PM
|
BLD-Wall cover | 1/5/2005 | 1/5/2005 | 1/5/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/5/2005 at 6:22:17 AM. S 1/2 of 2nd flr 1/5/2005 4:43:25 PM
|
BLD-Wall cover | 12/31/2004 | 1/3/2005 | 1/3/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/31/2004 at 1:33:22 PM. Framing OK S. 1/2 of 2nd floor. 1/3/2005 4:49:46 PM
|
BLD-Wall cover | 12/28/2004 | 12/29/2004 | 12/29/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 2:30:14 PM.
|
BLD-Conference | 12/28/2004 | 12/28/2004 | 12/28/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 7:48:34 AM.
|
BLD-Conference | 12/23/2004 | 12/23/2004 | 12/23/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/23/2004 at 7:38:44 AM. Contact: ###-####. Architect to approve Electricians Method of firestopping and fireblocking penitrations thru plates. 12/23/2004 4:39:17 PM
|
BLD-Conference | 12/21/2004 | 12/22/2004 | 12/22/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/21/2004 at 4:37:45 PM. Need to review Legacy report on foam seal used in leiu of firecaulk for (metal) Electr penitrating items....for fireblock in walls. . 12/22/2004 11:45:41 AM 12/22/2004 11:48:18 AM
|
BLD-Framing/Rough-in | 12/21/2004 | 12/22/2004 | 12/22/2004 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/21/2004 at 4:38:19 PM.
|
FIRE-Conference | 12/21/2004 | 12/21/2004 | 12/21/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/21/2004 at 10:34:24 AM. Contact: ###-####. Dave Miller approved the relocation of the roof access to above stair door - there is no equipment on the roof that will need access; will require structural review also 12/21/2004 4:03:22 PM
|
BLD-Framing/Rough-in | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 10:37:09 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/16/2004 | 12/17/2004 | 12/17/2004 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/16/2004 at 3:11:33 PM. 2nd floor.......Need to install all holdowns, complete double top plates at plumbing walls, complete firecaulking. 12/17/2004 11:01:47 AM
|
BLD-Wall cover | 12/14/2004 | 12/14/2004 | 12/14/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/14/2004 at 8:59:46 AM. Contact: ###-####. OK to prerock lid on Corridors pending fire sprinkler insp. and appr. 12/14/2004 4:31:01 PM
|
Case Summary (BLD) | | | 12/14/2004 | | |
|
|
|
|
BLD-Other | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 8:03:37 AM. Contact: ###-####.
|
BLD-Other | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 8:03:37 AM. Contact: ###-####. Partial Roof nailing S 1/2 OK 12/7/2004 3:25:27 PM 12/7/2004 3:26:07 PM
|
BLD-Conference | 12/1/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 1:29:21 PM. Contact: ###-####.
|
BLD-Conference | 11/30/2004 | 12/1/2004 | 12/1/2004 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 2:18:18 PM. Contact: ###-####.
|
BLD-Conference | 11/18/2004 | 11/19/2004 | 11/19/2004 | A | PART |
Jim Sly
|
|
|
Pre-rock and block at Tubs per appr plan, or Architect to supply new Detail. 11/19/2004 2:10:56 PM
|
Case Summary (BLD) | | | 11/19/2004 | | |
|
|
|
|
BLD-Conference | 11/17/2004 | 11/18/2004 | 11/18/2004 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/17/2004 at 4:13:47 PM. Contact: ###-####.
|
BLD-Conference | 11/16/2004 | 11/16/2004 | 11/16/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/16/2004 at 6:59:00 AM. Contact: ###-####. Met with Plumber ans Don to discuss Shower valve in 1hr wall. 11/16/2004 5:13:28 PM
|
Plan resubmittals received | | | 11/8/2004 | | DONE |
|
|
|
Received one copy of revised sheets A010, A020, L100, L200 E1.0, E1.1, E2.0 & E5.1. Routed to Mike P. Contacted Michael Brown to ask for a second set. kmm
|
BLD-Conference | 11/3/2004 | 11/4/2004 | 11/4/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/3/2004 at 2:13:11 PM. Contact: ###-####. Moving swimming pool....Contact planning and Zoning. 11/4/2004 3:50:24 PM
|
BLD-Conference | 11/2/2004 | 11/2/2004 | 11/2/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/2/2004 at 8:35:03 AM. Contact: ###-####. Talked about extending rated wall at stairtower (2hr) across double wall ...
Double wall consists of Ext wall and wall Next to it by stairway. 11/2/2004 3:56:48 PM 11/2/2004 3:59:04 PM
|
BLD-Conference | 10/27/2004 | 10/28/2004 | 10/28/2004 | A | NR |
Jim Sly
|
|
|
|
BLD-Conference | 10/28/2004 | 10/28/2004 | 10/28/2004 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/28/2004 at 6:42:27 AM. Contact: ###-####. C/N Architect to resubmit for approval..... Details for protection of penitrating items through rated walls and floor/ceiling assembly, and Misc framing corrections. Corr notice on site. 10/28/2004 4:49:16 PM
|
BLD-Conference | 10/27/2004 | 10/27/2004 | 10/27/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/27/2004 at 6:51:18 AM. Contact: ###-####. Met with Tim (foreman) and went over Framing issues. 10/27/2004 6:09:30 PM
|
BLD-Conference | 10/26/2004 | 10/26/2004 | 10/26/2004 | P | PART |
Jim Sly
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner Met with Tom, Dave and Jim Storey......Checked plans and jobsite. 10/26/2004 5:01:24 PM
|
BLD-Conference | 10/26/2004 | 10/26/2004 | 10/26/2004 | P | PASS |
Tom Arcoraci
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
BLD-Conference | 10/21/2004 | 10/21/2004 | 10/21/2004 | P | DONE |
Troy Cobbley
|
|
|
Per IFC 1009 exception #1 the windows can have stops in them 10/21/2004 4:18:12 PM
|
BLD-Framing/Rough-in | 9/29/2004 | 9/30/2004 | 9/30/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/29/2004 at 3:11:07 PM. Contact: ###-####. 1st flr shear walls and holdowns.... Most done and OK @ South 1/2 of bldg. 9/30/2004 11:08:53 AM
|
BLD-Conference | 9/28/2004 | 9/29/2004 | 9/29/2004 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/28/2004 at 1:48:38 PM. Contact: ###-####.
|
BLD-Foundation | 9/22/2004 | 9/23/2004 | 9/23/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/22/2004 at 1:49:12 PM. Contact: ###-####. rebar and insulation for slab on grade north end mti will also be on site to check final and test concrete 9/23/2004 4:33:45 PM
|
BLD-Conference | 9/22/2004 | 9/22/2004 | 9/22/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/22/2004 at 10:15:27 AM. Contact: ###-####. Met with Framing super...... Bob... Need continuous rock at 2hr wall ... uninterupted by studs at perpendicular walls. 9/22/2004 3:15:57 PM
|
BLD-Other | 9/9/2004 | 9/10/2004 | 9/10/2004 | P | DONE |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/9/2004 at 1:41:26 PM. Contact: ###-####.
|
BLD-Concrete | 9/9/2004 | 9/10/2004 | 9/10/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/9/2004 at 1:42:18 PM. Contact: ###-####.
partial found/slab ok.
see MTI notes for notation details, location of approval for this date 9/10/2004 12:46:36 PM
|
BLD-Energy code compliance | 9/8/2004 | 9/8/2004 | 9/8/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/8/2004 at 7:27:11 AM. Foundation insul. 9/8/2004 3:53:32 PM
|
BLD-Foundation | 9/2/2004 | 9/3/2004 | 9/3/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/2/2004 at 12:55:33 PM.
rigid insul. @ stemwalls ok. need to reinspect 2 ft insulation return @ slab once backfilled and prep'd. 9/3/2004 9:13:02 AM
|
BLD-Conference | 9/1/2004 | 9/2/2004 | 9/2/2004 | A | PART |
Jim Sly
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Don has been calling in for inspections for concrete, ...but entering wrong permit #....... Went through more details on plans with Ferguson. 9/2/2004 12:46:16 PM
|
BLD-Conference | 8/16/2004 | 8/19/2004 | 8/19/2004 | P | PASS |
Jim Sly
|
|
|
sandy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles !st Pre Constr Conf...Met with Project Mngr (Greg) Job Super (Don) and job Foreman (Tim) . All People associated with ground work and Utilities there. MTI is special insp Agency. Went over plans with Don. 8/19/2004 4:18:09 PM
|
BLD-Conference | 8/19/2004 | 8/19/2004 | 8/19/2004 | P | PASS |
Jim Sly
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
(F) Reprint permit | | | 8/9/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/6/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/22/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/22/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2004 | | DONE |
|
|
|
left a message for Bill -- permit is ready.
|
Routing - PUBLIC WORKS | 7/20/2004 | | 7/21/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2004 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 6/9/2004 | | 7/21/2004 | | PASS |
Mike Phillips
|
|
|
7/21/2004 13:34:40 JCM - activity updated through activity BLDA022 from case BLD04-01267.
|
Routing - PUBLIC WORKS | 6/9/2004 | | 7/21/2004 | | PASS |
|
|
|
Per April Miller site plan does not match recorded subdivision.
|
Routing - PLAN CHECK | 7/19/2004 | | 7/20/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 6/28/2004 | | 7/16/2004 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - FIRE | 7/16/2004 | | 7/16/2004 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLANNING Land Div | 7/16/2004 | | 7/16/2004 | | PASS |
|
|
|
Recorded deed consolidating parcels into one for hotel site.
|
Routing - PLAN CHECK | 7/21/2004 | | 7/12/2004 | | PASS |
|
|
|
John M.
|
Routing - FIRE | 6/25/2004 | | 6/28/2004 | | FAIL |
Bill Alexander
|
|
|
1. Provide the information required by the IBC Plan Examiner, specifically all items which also relate to the IFC.
2. The Architect of Record for the construction phase of this project shall provide documentation of the hydrant water flow available at this site. Hydrant flow shall meet the requirements of IFC B105.1.
The required fire flow for the proposed, V-A, 68,050-ft/2, with 75% reduction for sprinklered structure, is: 1500 gpm.
Submit a letter from United Water that is dated within the past 12 months, indicating this flow is available using the hydrants shown on plans. Water flow information is available from United Water, Doug Shaefer at ###-####.
3. The Architect of Record for the construction phase of this project the architect shall submit written documentation from United Water Company, of the water pressure and flow available for automatic fire sprinkler system design. This information is different than hydrant flow, because it indicates the static pressure, and residual pressure and flow of the water supply available at the proposed system water supply connection. Sprinkler water flow information is available from United Water, by contacting Doug Shaefer at ###-####. This information is for uniformity and consistency in the fire sprinkler system design. A copy of this information shall be included with the Fire Sprinkler Permit application documentation.
4. Per IBC review by Mike Phillips, "Response required from Design Professional," paragraph #63, the following information will need addressed.
A. Where hazardous Materials are to be stored or used, the Building permit application shall include a Hazardous Materials Inventory Statement and Management Plan. The Report shall be prepared by a qualified person, approved by the PDS Building Department. NOTE: MSDS's are necessary but are not a substitute for the above classification. The Haz-Mat Report cannot be prepared by PDS personnel.
NOTE: This would apply to the pool chemicals. Provide a Hazardous Material Inventory statement, include details of storage and use arrangements as necessary to verify Code compliance with IFC Chapter 27 for storage and use.
The information provided in the Haz-Mat report shall be adequate to verify Code compliance with IFC requirements. Materials shall be classified and quantified according to hazard categories, as indicated in IFC 2701.2.2. Quantities within allowable limits shall comply with 2701 and 2703. Quantities in excess of allowable limits shall comply with 2704 and 2705. In addition, the specific material requirements in Chapters 28 through 44 also apply. (Refer to Permit Application instructions and IFC Chapter 27). Names of Haz-Mat persons approved by the PDS Dept are available upon request.
|
Routing - Erosion and Sediment | 6/28/2004 | | 6/28/2004 | | PASS |
|
|
|
Resubmittals received. ESC plan approved with attached conditions.
|
Plan Review Completed(1st rev) | | | 6/28/2004 | | DONE |
|
|
|
FAILED
Planning Land Div
Fire
Plan Check
Erosion and Sediment
Public Works
|
Routing - PLAN CHECK | 6/17/2004 | | 6/25/2004 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing Off Site - STRUCTURAL | 6/21/2004 | | 6/22/2004 | | FAIL |
|
|
|
Sent additional information to outside engineering.
Additional information required will be reviewed by city plan reviewer.
|
Routing Off Site - STRUCTURAL | 6/9/2004 | | 6/20/2004 | | FAIL |
|
|
|
Called PDQ for pick-up..
Needed additional sheets to the calculations.
|
Construction Site Erosion | 6/18/2004 | 6/18/2004 | 6/18/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLUMBING | 6/16/2004 | | 6/17/2004 | | PASS |
|
|
|
1. food prep sink must drain indirect into floor sink 2. no inch and a half vents under slab 3. branch drains over five feet need cleanouts for each size of pipe 4. four inch water service only requires a double check backflow 5. coffee machine may require reduced pressure backflow 6. all base of drainage stacks require a base of stack cleanout in the vertical.
|
Routing - PLANNING | 6/15/2004 | | 6/16/2004 | | PASS |
|
|
|
Approved by TKW per DRH04-00044.
Approved by KLG per CUP04-00016. Note signage needs separate approval.
|
Routing - Erosion and Sediment | 6/14/2004 | | 6/15/2004 | | FAIL |
|
|
|
Approved ESC not attached to plans set. ESC 04-00736 approved for grading only. Not construction.
|
Plans ACCEPTED BY PLAN TECH | | | 6/9/2004 | | DONE |
|
|
|
Plans not stamped & signed by C D H , Lighting ,Envelope, Mechanical Compliance not signed.
|
Routing - PLANNING Land Div | 6/9/2004 | | 6/9/2004 | | FAIL |
|
|
|
Need to eliminate multiple parcels by consolidating with new deed with metes and bounds description and new tax parcel number. Called Matt Munger at ###-#### on June 9, 2004.
|
Application received | | | 6/8/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2004 | | DONE |
|
|
|
|
Fee Review-notes | 6/8/2004 | 6/8/2004 | | | |
|
|
|
|