Case Summary (BLD) | | | 2/23/2016 | | DONE |
|
|
|
|
Third Notice BLD | 1/29/2009 | 1/29/2009 | 4/3/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 10/31/2008 | 10/31/2008 | 1/2/2009 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/24/2008 | 10/24/2008 | 10/31/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/31/2008 | 10/31/2008 | 10/31/2008 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | PASS |
Dave Hannah
|
|
|
randy Phone #: ###-#### ok for cert of comp
|
BLD-Aging Inspection | 8/14/2008 | 8/14/2008 | 8/15/2008 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/26/2008 | 2/27/2008 | 2/28/2008 | P | PART |
Forrest France
|
|
|
Corrections verified for completion, fire life safety inspection passed.
|
BLD-Aging Inspection | 2/4/2008 | 2/4/2008 | 2/12/2008 | P | DEFR |
Forrest France
|
|
|
Provide functional EM lighting at all stairways, some need repaired as previously noted.
|
BLD-Aging Inspection | 2/4/2008 | 2/4/2008 | 2/4/2008 | | DEFR |
Dave Hannah
|
|
|
sent to fire
|
Case Summary (BLD) | | | 12/17/2007 | | |
|
|
|
|
FIRE-Final Inspection | 11/30/2007 | 11/30/2007 | 12/4/2007 | P | FAIL |
Forrest France
|
|
|
Need to verify functional EM lighting at all three stairways, provide signage at the gates to the basement level in the stariways, remove covering at a fire sprinkler head in the south stairway 1st floor exit discharge.
|
BLD-Aging Inspection | 9/12/2007 | 9/12/2007 | 9/20/2007 | | FAIL |
Dave Hannah
|
|
|
needs fire signoffs walked project with owner
|
BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 | A | DONE |
Forrest France
|
|
|
wip, pending alarm and sprinkler permit finals.
|
Case Summary (BLD) | | | 11/30/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/30/2005 | | PASS |
|
|
|
Approved revised drawings that show the alley fire escape remaining as it is and that also show the stairway that exits directly to the alley NOT being extended to the roof. Upgrades are not required unless or until the 4th story, 5th story, or 6th story have multiple tenants on a story.
|
Plan resubmittals received | | | 6/27/2005 | | |
|
|
|
Received (2) copies of sheet A1.4, A1.5, A1.6, A2.4, A2.5, A2.6 and A5.0. Routed to Carl W.
|
BLD-Conference | 6/22/2005 | 6/23/2005 | 6/23/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/22/2005 at 1:01:13 PM. Contact: ###-####. fire protection on 3rd floor ceiling ok to start covering
|
BLD-Other | 5/16/2005 | 5/17/2005 | 5/17/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/16/2005 at 12:00:21 PM. Contact: ###-####. ok to insulate
|
BLD-Framing/Rough-in | 4/20/2005 | 4/20/2005 | 4/20/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 11:06:02 AM. Contact: ###-####. soffit in basement lobby area ok to cover 4/20/2005 2:22:08 PM
|
BLD-Conference | 4/5/2005 | 4/5/2005 | 4/5/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 10:22:19 AM. Contact: ###-####. smoke dams 4/5/2005 3:17:22 PM
|
BLD-Conference | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 1:16:35 PM. Contact: ###-####.
|
BLD-Conference | 3/29/2005 | 3/30/2005 | 3/30/2005 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/29/2005 at 2:36:11 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 1:38:50 PM. Contact: ###-####. needs to check floor pens in restrooms sec thru fifth 3/29/2005 9:55:56 AM
|
BLD-Conference | 3/22/2005 | 3/23/2005 | 3/23/2005 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/22/2005 at 2:57:43 PM. Contact: ###-####.
|
BLD-Final | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/22/2005 at 2:57:43 PM. Contact: ###-####. ok for temp occ 3/24/2005 12:00:00 PM
|
FIRE-Conference | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | DONE |
Troy Cobbley
|
|
|
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
|
BLD-Final | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 1:14:56 PM. Contact: ###-####.
|
BLD-Aging Inspection | 12/22/2004 | 12/22/2004 | 12/22/2004 | | PART |
Dave Hannah
|
|
|
wip 12/22/2004 10:09:30 AM
|
Case Summary (BLD) | | | 12/6/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/22/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2004 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/16/2004 | | 9/8/2004 | | PASS |
Carl Westfall
|
|
|
9/8/2004 13:20:44 CJW - activity updated through activity BLDA022 from case BLD04-01308.
|
Routing - PLAN CHECK | 8/4/2004 | | 9/8/2004 | | PASS |
|
|
|
Drawings approved with clarifications and conditions.
|
Plan resubmittals received | | | 8/30/2004 | | DONE |
|
|
|
Received Letter of transmittal with response letter, responses to structural plan review, one set of sheets A2.0,A2.1,A3.0,A3.2,A7.2,A8.1,S2.2,S2.3,S2.4,S3.1 Taken to Carl.
|
Routing Off Site - STRUCTURAL | 8/30/2004 | | 8/30/2004 | | PASS |
|
|
|
Called PDQ for pick-up..
|
Plan resubmittals received | | | 8/20/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Sets of A2.0,A2.1,A3.0,A3.2,A7.2,A8.1,S2.2,S2.3,S2.4,S3.1, Taken to Carl Westfall....
|
Routing - PLANNING | 7/26/2004 | | 8/4/2004 | | PASS |
|
|
|
Approved per DRH03-230 and per CCDC's requirements for canopy design.
|
Routing - PLAN CHECK | 7/20/2004 | | 7/26/2004 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/20/2004 | | FAIL |
|
|
|
failed Plan check
|
Routing - FIRE | 7/16/2004 | | 7/20/2004 | | PASS |
|
|
|
Approved based on requirements to be addressed in deferred submittals; review faxed to architect.
|
Routing - PLAN CHECK | 7/8/2004 | | 7/16/2004 | | |
|
|
|
Failed first IBC plan review. IBC plan review started July 8, 2004 and was completed July 16, 2004. A response from the architect was required. See the plan review report. A copy was E-mailed to the archtiect.
|
Waiting for Cert. of Value | | | 7/6/2004 | | DONE |
|
|
|
Received Certificate of value for the Demo portion with a letter of transmittal to Carl W.
|
Routing Off Site - STRUCTURAL | 6/14/2004 | | 6/24/2004 | | |
|
|
|
Failed first review by the consultant engineer.
|
Routing - PLUMBING | 6/18/2004 | | 6/23/2004 | | PASS |
|
|
|
1. sht P1.0-SP-1 drain goes to three inch line, must be four inch due to fixture unit loading from pump(40 minimum) 2. basement shower vent or drain not shown on P2.0?
|
Routing - PUBLIC WORKS | 6/16/2004 | | 6/18/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/14/2004 | | |
|
|
|
No Envelope or Mechanical Compliance .. No ESC Application or plans...
|
Application received | | | 6/11/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/11/2004 | | DONE |
|
|
|
|
Fee Review-notes | 6/11/2004 | 6/11/2004 | | | |
|
|
|
|
Routing - PLANNING | 6/23/2004 | | | | |
|
|
|
Marty Santoyo DRH03-00230
|