Permit Information
Permit NumberBLD04-01308
StatusFinaled
Name EKC INC
Site Address 121 N 9TH ST
Project NamePLAZA 121-PHASE 2
Customer NumberSEE COMMENTS
ePlanReviewNo
Description
(PLAZA 121 - SHELL AND CORE - OLD FIRST SECURITY BUILDING) This building shall be fully fire sprinklered per NFPA 13-2002 as regulated by the Fire Department because it has occupied floors more than 55 feet above the street, to substitute for rated corridors, to allow unprotected openings at the alley, to allow one stair enclosure to pass through a nonrated lobby on the 1st story, etc. To renovate an existing building having 6 stories and a basement (76,680 square feet total). This building is NOT a high-rise. Core restrooms will be constructed in the basement, on the 2nd floor, on the 3rd floor, on the 4th floor, on the 5th floor, and on the 6th floor (12 total). All restrooms are required to be fully accessible to the disabled. Nonstructural demolition work on the 5th and 6th floors was covered under permit BLD04-01570. A 6 story addition, including 2 new elevators, was constructed under permit BLD04-00079. Tenant improvements will be covered under separated permits. Work under this permit is to include interior nonbearing walls, exterior and interior windows, exterior and interior doors, a new stairway to the basement, an extended stairway to the roof, and seismic ties between the West wall and the structural frame all per the approved drawings, engineering, and the plan review report on file. DRH03-00230 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/23/2016 DONE
Third Notice BLD1/29/20091/29/20094/3/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice10/31/200810/31/20081/2/2009 DONE
DetailsDave Hannah
BLD-Aging Inspection10/24/200810/24/200810/31/2008 PASS
DetailsDave Hannah
DOC - Permit Finaled10/31/200810/31/200810/31/2008APASS
DetailsDave Hannah
BLD-Final8/15/20088/15/20088/15/2008PPASS
DetailsDave Hannah
randy Phone #: ###-#### ok for cert of comp
BLD-Aging Inspection8/14/20088/14/20088/15/2008 PASS
DetailsDave Hannah
FIRE-Final Inspection2/26/20082/27/20082/28/2008PPART
DetailsForrest France
Corrections verified for completion, fire life safety inspection passed.
BLD-Aging Inspection2/4/20082/4/20082/12/2008PDEFR
DetailsForrest France
Provide functional EM lighting at all stairways, some need repaired as previously noted.
BLD-Aging Inspection2/4/20082/4/20082/4/2008 DEFR
DetailsDave Hannah
sent to fire
Case Summary (BLD)  12/17/2007  
FIRE-Final Inspection11/30/200711/30/200712/4/2007PFAIL
DetailsForrest France
Need to verify functional EM lighting at all three stairways, provide signage at the gates to the basement level in the stariways, remove covering at a fire sprinkler head in the south stairway 1st floor exit discharge.
BLD-Aging Inspection9/12/20079/12/20079/20/2007 FAIL
DetailsDave Hannah
needs fire signoffs walked project with owner
BLD-Final4/11/20064/12/20064/17/2006ADONE
DetailsForrest France
wip, pending alarm and sprinkler permit finals.
Case Summary (BLD)  11/30/2005  
Plan Reviewer's activity  6/30/2005 PASS
Approved revised drawings that show the alley fire escape remaining as it is and that also show the stairway that exits directly to the alley NOT being extended to the roof. Upgrades are not required unless or until the 4th story, 5th story, or 6th story have multiple tenants on a story.
Plan resubmittals received  6/27/2005  
Received (2) copies of sheet A1.4, A1.5, A1.6, A2.4, A2.5, A2.6 and A5.0. Routed to Carl W.
BLD-Conference6/22/20056/23/20056/23/2005APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/22/2005 at 1:01:13 PM. Contact: ###-####. fire protection on 3rd floor ceiling ok to start covering
BLD-Other5/16/20055/17/20055/17/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/16/2005 at 12:00:21 PM. Contact: ###-####. ok to insulate
BLD-Framing/Rough-in4/20/20054/20/20054/20/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/20/2005 at 11:06:02 AM. Contact: ###-####. soffit in basement lobby area ok to cover 4/20/2005 2:22:08 PM
BLD-Conference4/5/20054/5/20054/5/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/5/2005 at 10:22:19 AM. Contact: ###-####. smoke dams 4/5/2005 3:17:22 PM
BLD-Conference3/30/20053/31/20053/31/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/30/2005 at 1:16:35 PM. Contact: ###-####.
BLD-Conference3/29/20053/30/20053/30/2005ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/29/2005 at 2:36:11 PM. Contact: ###-####.
BLD-Framing/Rough-in3/28/20053/29/20053/29/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/28/2005 at 1:38:50 PM. Contact: ###-####. needs to check floor pens in restrooms sec thru fifth 3/29/2005 9:55:56 AM
BLD-Conference3/22/20053/23/20053/23/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/22/2005 at 2:57:43 PM. Contact: ###-####.
BLD-Final3/23/20053/23/20053/23/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/22/2005 at 2:57:43 PM. Contact: ###-####. ok for temp occ 3/24/2005 12:00:00 PM
FIRE-Conference3/1/20053/1/20053/1/2005PDONE
DetailsTroy Cobbley
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
BLD-Final2/24/20052/25/20052/25/2005ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/24/2005 at 1:14:56 PM. Contact: ###-####.
BLD-Aging Inspection12/22/200412/22/200412/22/2004 PART
DetailsDave Hannah
wip 12/22/2004 10:09:30 AM
Case Summary (BLD)  12/6/2004  
Issue PAID IN FULL permit  9/22/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/8/2004 DONE
Permit Ready to Issue  9/8/2004 DONE
Inspection Record Card- Bld  9/8/2004 DONE
Permit Ready to Issue  9/8/2004 DONE
Plan assigned to (CJW)6/16/2004 9/8/2004 PASS
DetailsCarl Westfall
9/8/2004 13:20:44 CJW - activity updated through activity BLDA022 from case BLD04-01308.
Routing - PLAN CHECK8/4/2004 9/8/2004 PASS
Drawings approved with clarifications and conditions.
Plan resubmittals received  8/30/2004 DONE
Received Letter of transmittal with response letter, responses to structural plan review, one set of sheets A2.0,A2.1,A3.0,A3.2,A7.2,A8.1,S2.2,S2.3,S2.4,S3.1 Taken to Carl.
Routing Off Site - STRUCTURAL8/30/2004 8/30/2004 PASS
Called PDQ for pick-up..
Plan resubmittals received  8/20/2004 DONE
Received Transmittal Letter, & 2 Sets of A2.0,A2.1,A3.0,A3.2,A7.2,A8.1,S2.2,S2.3,S2.4,S3.1, Taken to Carl Westfall....
Routing - PLANNING7/26/2004 8/4/2004 PASS
Approved per DRH03-230 and per CCDC's requirements for canopy design.
Routing - PLAN CHECK7/20/2004 7/26/2004  
Plan Review Completed(1st rev)  7/20/2004 FAIL
failed Plan check
Routing - FIRE7/16/2004 7/20/2004 PASS
Approved based on requirements to be addressed in deferred submittals; review faxed to architect.
Routing - PLAN CHECK7/8/2004 7/16/2004  
Failed first IBC plan review. IBC plan review started July 8, 2004 and was completed July 16, 2004. A response from the architect was required. See the plan review report. A copy was E-mailed to the archtiect.
Waiting for Cert. of Value  7/6/2004 DONE
Received Certificate of value for the Demo portion with a letter of transmittal to Carl W.
Routing Off Site - STRUCTURAL6/14/2004 6/24/2004  
Failed first review by the consultant engineer.
Routing - PLUMBING6/18/2004 6/23/2004 PASS
1. sht P1.0-SP-1 drain goes to three inch line, must be four inch due to fixture unit loading from pump(40 minimum) 2. basement shower vent or drain not shown on P2.0?
Routing - PUBLIC WORKS6/16/2004 6/18/2004 PASS
Plans ACCEPTED BY PLAN TECH  6/14/2004  
No Envelope or Mechanical Compliance .. No ESC Application or plans...
Application received  6/11/2004  
Recd Pcfee & Taken To Pln CK  6/11/2004 DONE
Fee Review-notes6/11/20046/11/2004   
Routing - PLANNING6/23/2004    
Marty Santoyo DRH03-00230