BoDo - Building #4 (Shell & Core) - To construct a new 52,260 Square foot, two story, noncombustible, fully fire sprinklered shell and core building for future office, retail and restaurant tenants. This work also includes the construction of a two-hour fire-resitive, noncombustible, four story stair enclosure to be used as the second exit from the new building and the existing four story Foster Building. This new building will wrap around the existing Foster Building and 9th Street Parking Garage. There will be no property lines through or between any of the buildings on this block. Two-hour fire walls will separate these buildings from each other, because of allowable area and construction types. The new building is being constructed with nonseparated uses with the A-2 Occupancy being the most restrictive. The fire sprinkler system is being used for area increase. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permit are required to finish this building for occupancy. All construction per the approved plans and attached comment list. #04-385/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/20/20064/21/20064/21/2006PPASS
DetailsDave Hannah
Forrest should sign-off on the life safety in the AM. If it is signed off we would love to see you just after lunch. Thanks. ok for cc
FIRE-Final Inspection4/21/20064/21/20064/21/2006PPASS
DetailsForrest France
Fire life safety is acceptable, c/n items are complete.
Letter of compliance  4/21/2006 DONE
Letter of Compliance issued 4-21-06.
FIRE-Final Inspection4/20/20064/20/20064/20/2006PFAIL
DetailsForrest France
The project related alarm for Foster building failed inspection.
FIRE-Final Inspection4/19/20064/19/20064/20/2006PNR
DetailsForrest France
Project related fire alarm is not finaled.
BLD-Framing/Rough-in2/28/20063/1/20063/1/2006APART
DetailsDave Hannah
Please call Dennis to view fireproofing for a cover-up. He may have already covered-up due because I did not schedule you yesterday....sorry. Internet Inspection Request from: Alex Monge
BLD-Other1/30/20061/31/20061/31/2006APART
DetailsDave Hannah
Inspection of Foster roof straps. Internet Inspection Request from: Alex Monge
BLD-Other1/11/20061/12/20061/12/2006ADONE
DetailsDave Hannah
Foster Building sheating at roof to cover-up with foam.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Final1/4/20061/5/20061/5/2006PNR
DetailsDave Hannah
Final for C of O for Building 4.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
FIRE-Final Inspection1/4/20061/5/20061/5/2006APART
DetailsForrest France
Life safety final pending the completion and final of the related alarm permit for this project which includes BODO 4 and the Foster building monitoring.
BLD-Final10/26/200510/27/200510/28/2005PNR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final10/25/200510/26/200510/28/2005PFAIL
DetailsDave Hannah
Building 4 Shell & Core final to allow Stratton to operate...2nd floor. Internet Inspection Request from: Alex Monge needs fire sign off and elev sign off along with finishing stair tower fire proofing
FIRE-Final Inspection10/25/200510/26/200510/26/2005PNR
DetailsForrest France
Items on previous inspection correction notice dated 10/24 have not been completed at this time.
BLD-Final10/25/200510/25/200510/26/2005PNR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs other trades to sign off
FIRE-Final Inspection10/25/200510/25/200510/25/2005PNR
DetailsForrest France
Several items on the correction notice have not been completed as noticed during the course of a related inspection, no inspection performed. Contacted John the GC for notification of the situation.
BLD-Final10/21/200510/24/200510/25/2005PNR
DetailsDave Hannah
Final egress inspection (1st floor only to accomodate PF Chang, Entire building egress will be Thur/Friday. I will schedule for that later) in the afternoon. Please call Alex Monge @ ###-#### when you arrive. Thanks. Internet Inspection Request from: Alex Monge
FIRE-Final Inspection10/21/200510/24/200510/24/2005PFAIL
DetailsForrest France
A 12 item correction list was discussed and left with Gary of Devcon construction for the shell permit life safety.
Plan resubmittals received  10/24/2005  
Received (1) copy of SE1, SE1A, SE1B, SE1C, S06, S07, S07A, S08, S02B, SE2, S02 and S02A. Also received (1) copy of structural calcs and (1) transmittal letter. Routed to John M.
Inspection Record Card- Bld  10/21/2005 DONE
BLD-Conference10/13/200510/17/200510/18/2005APASS
DetailsDave Hannah
10:00 am conference with Dave Hanna, Sam & Forest. Please call Dennis at ###-#### to cofirm attendance.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
FIRE-Conference10/13/200510/17/200510/17/2005ADONE
DetailsForrest France
On site discussion regarding inspection scheduling, project phasing, shell and tenant inspections, requirements for occupancy.
BLD-Conference10/7/200510/7/200510/10/2005PDONE
DetailsDave Hannah
Conference for PF Chang TCO. Call Alex at ###-#### to confirm time. Internet Inspection Request from: Alex Monge
BLD-Conference9/8/20059/9/20059/9/2005APASS
DetailsDave Hannah
Gary would like an inspection/conference regarding some info. on building 4. Call ###-#### Internet Inspection Request from: Alex Monge
Case Summary (BLD)  9/1/2005 DONE
BLD-Conference7/28/20057/29/20058/1/2005PDONE
DetailsDave Hannah
Dave: I would like to do a quick/informal review regarding requirements to open Building 4 Businesses. Please come to the site office-Alex Monge; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in6/21/20056/22/20056/23/2005APASS
DetailsDave Hannah
Rouhg-framing inspection for Building 4. Call Paul Fishley ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in6/8/20056/9/20056/9/2005APART
DetailsDave Hannah
Fire safing inspection. Call Paul ###-####. I tried to schedule this today but had a block on our permit. Paul needs this looked at first thing if possible. Thanks..alexmonge ok to coverInternet Inspection Request from: Alex Monge
BLD-Framing/Rough-in5/10/20055/11/20055/11/2005APART
DetailsDave Hannah
Fire Caulking inspection at CMU wall. early am if possible. Call Paul ###-#### Internet Inspection Request from: Alex Mongeeverything thing they have completed is ok
BLD-Conference5/4/20055/5/20055/5/2005APASS
DetailsDave Hannah
preconstruction meeting
BLD-Framing/Rough-in5/2/20055/2/20055/2/2005PPART
DetailsDave Hannah
Core wall framing inspection. Internet Inspection Request from: Alex Monge ok to cover walls on ext gaage side
BLD-Framing/Rough-in4/11/20054/12/20054/12/2005APART
DetailsDave Hannah
Rough framing inspection. Internet Inspection Request from: Alex Monge walked project with forman 4/12/2005 9:29:08 AM
BLD-Concrete3/16/20053/18/20053/18/2005ADONE
DetailsDave Hannah
7:00 am slab on deck pour (2nd pour) Internet Inspection Request from: Alex Monge
BLD-Conference3/16/20053/17/20053/17/2005ADONE
DetailsDave Hannah
9:00 conference at the Bodo site office w/ Dave Anderson and Paul Fishley.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Concrete3/16/20053/17/20053/17/2005APART
DetailsDave Hannah
7:00 slab on deck pour Internet Inspection Request from: Alex Monge
BLD-Concrete2/16/20052/17/20052/17/2005APART
DetailsDave Hannah
Slab on Grade pour - 7:00 am start Internet Inspection Request from: Alex Monge
BLD-Concrete1/28/20051/31/20051/31/2005ADONE
DetailsDave Hannah
6:30 slab on grade pour (1/4 of building) Internet Inspection Request from: Alex Monge
BLD-Footing1/28/20051/28/20051/28/2005PPART
DetailsTom Arcoraci
Concrete footings at east end at 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Concrete1/21/20051/24/20051/24/2005APART
DetailsDave Hannah
Slab on Grade pour (North 1/3 of building slab) Internet Inspection Request from: Alex Monge
BLD-Concrete1/18/20051/18/20051/18/2005PDONE
DetailsDave Hannah
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
BLD-Foundation1/17/20051/17/20051/17/2005PDONE
DetailsDave Hannah
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
BLD-Foundation1/13/20051/13/20051/13/2005PPART
DetailsDave Hannah
Grout placement at 1:30 pm Internet Inspection Request from: Alex Monge
BLD-Footing1/12/20051/12/20051/12/2005PPART
DetailsDave Hannah
Concrete at 2:00 pm Internet Inspection Request from: Alex Monge
BLD-Foundation1/12/20051/12/20051/12/2005PPART
DetailsDave Hannah
CMU wall grout at 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Footing1/7/20051/7/20051/7/2005PPART
DetailsDave Hannah
1:00 pm concrete at footings. Internet Inspection Request from: Alex Monge
BLD-Foundation1/7/20051/7/20051/7/2005PPART
DetailsDave Hannah
1:30 Grout at CMU wall. Internet Inspection Request from: Alex Monge
BLD-Foundation1/3/20051/4/20051/4/2005ADONE
DetailsDave Hannah
10:00 am CMU grout. Internet Inspection Request from: Alex Monge
BLD-Footing1/3/20051/4/20051/4/2005ADONE
DetailsDave Hannah
1:00 pm concrete pour at footings Internet Inspection Request from: Alex Monge
BLD-Footing12/28/200412/29/200412/29/2004PPART
DetailsDave Hannah
Stem wall and footings at 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Foundation12/27/200412/27/200412/27/2004PPART
DetailsDave Hannah
Grout at CMU wall, 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Footing12/22/200412/23/200412/23/2004PPART
DetailsDave Hannah
1:00 column pour. Internet Inspection Request from: Alex Monge
BLD-Footing12/17/200412/20/200412/20/2004PPART
DetailsTom Arcoraci
2:00 pm Footing pour at CMU wall-Northwest corner by Foster building Internet Inspection Request from: Alex Monge pending spec insp 12/20/2004 1:49:02 PM
BLD-Foundation12/20/200412/20/200412/20/2004PPART
DetailsTom Arcoraci
12:00 Grout at CMU wall. Internet Inspection Request from: Alex Monge pending spec insp 12/20/2004 1:49:12 PM
BLD-Footing12/16/200412/17/200412/17/2004PPART
DetailsDave Hannah
CMU wall footing pour at 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Foundation12/15/200412/16/200412/16/2004PPART
DetailsDave Hannah
Groiut a block courses at 11:30 and 3:00. ; Phone #: ###-####
BLD-Foundation12/14/200412/14/200412/14/2004PPART
DetailsDave Hannah
CMU Grout pour at 2:00 pm; Phone #: ###-####
BLD-Foundation12/10/200412/10/200412/10/2004PDONE
DetailsDave Hannah
Grout 5' lift at CMU wall at 1:00. ; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Foundation12/9/200412/9/200412/9/2004PCANC
DetailsDave Hannah
Grout at CMU wall; Phone #: ###-####
BLD-Concrete12/7/200412/7/200412/7/2004PPART
DetailsDave Hannah
CMU wall second lift grout poor at 12:00 noon.; Phone #: ###-####
BLD-Foundation12/3/200412/6/200412/6/2004PPART
DetailsDave Hannah
Grouting 5' lift of CMU wall adjacent to parking garage at approx. 1:00; Phone #: ###-####
BLD-Conference12/2/200412/3/200412/3/2004ADONE
DetailsDave Hannah
Testing 1-2-3....Not sure if you want a conference w/ Paul Fishley. Call him at the above number to set-up a time.; Phone #: ###-####
(F) Reprint permit  12/3/2004  
BLD-Other12/2/200412/2/200412/2/2004PPART
DetailsDave Hannah
masonry along garage drilling and epoxy mti on site checking 12/3/2004 8:23:05 AM
Issue PAID IN FULL permit  12/2/2004 DONE
Print Occupancy Form  11/30/2004 DONE
Plan assigned to (JCM)6/17/2004 11/29/2004 PASS
DetailsJohn Menard
11/29/2004 08:32:57 JCM - activity updated through activity BLDA022 from case BLD04-01323.
Routing - PLAN CHECK11/24/2004 11/29/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/29/2004 DONE
Permit Ready to Issue  11/29/2004 DONE
Permit Ready to Issue  11/29/2004  
Inspection Record Card- Bld  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Telephone call  11/29/2004  
left mess that permits is ready for james woodbury at ###-####
Print Occupancy Form  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Routing - PLANNING Land Div11/24/2004 11/24/2004 PASS
Approved. Final Plat of Front Street Condominiums recorded on November 23, 2004.
Routing Off Site - STRUCTURAL10/4/2004 10/6/2004 PASS
Marlene took plans for geopiers to structural engineer for review. JCM
Plan resubmittals received  10/4/2004 DONE
Received plans for geopier foundation supports. JCM
Routing - PLAN CHECK7/19/2004 10/4/2004  
Plan resubmittals received  8/2/2004 DONE
Received letter of transmittal with four sets of sheets A2.1,A2.2,A2.3,A7.1,A7.3,A9.3,S1.1, taken to John M.\\rad
Routing - FIRE7/16/2004 7/19/2004 PASS
resubmittal acceptable.
Routing Off Site - STRUCTURAL7/14/2004 7/16/2004 FAIL
Resubmittals taken to consulting structural engineer by Marlene Southard. JCM Received comment list from consulting structural engineer on the resubmittals requesting additional revisions. JCM
Plan resubmittals requested  7/16/2004  
e-mailed Sylvester Ramirez a copy of the plan review comment list and a copy of the comments from the consulting structural engineer. JCM
Routing - PLAN CHECK7/1/2004 7/16/2004 FAIL
Plan resubmittals received  7/14/2004  
Received revised plans for BoDo Building #4, including sheets #EN-1, C1.1, all architectural sheets, all structural sheets and all electrical sheets, along with a response letter on the structural, nonstructural and fire comments. JCM
Routing - Erosion and Sediment6/30/2004 7/1/2004 PASS
ESC plan approved with attached conditions.
Plan resubmittals received  6/30/2004 DONE
Received two copies of esc narrative and esc plan taken to John M.
Plan Reviewer's activity  6/30/2004  
Inserted ESC plans and routed to ESC. JCM
Routing - PLAN CHECK6/24/2004 6/30/2004  
Plan resubmittals requested  6/29/2004  
E-mailed Sylvester Ramirez a copy of the comment list from the consulting structural engineer, requesting revisions. JCM
Routing Off Site - STRUCTURAL6/16/2004 6/29/2004 FAIL
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLANNING Land Div6/16/2004 6/24/2004 FAIL
Need to record condo plat (Front Street Condos) SUB02-00070. Final Plat approved by City Council on January 14, 2003. Called Sylvester Ramirez on June 17, 2004 at ###-####.
Update - June 24, 2004
Existing parking garage is not in compliance with required setbacks and no land division was approved by Boise City after Record of Survey 4629 was approved upon which the buillding permit for the parking garage was issued. The current property ownership does not reflect Record of Survey 4629. Land division cannot be approved until setbacks are resolved with Building Division. BODO structure has not been included on condo plat of SUB02-00070. BODO structure must be shown on condo plat. Amended condo plat will require re-submittal for Planning and Zoning Commission approval and City Council approval. After Boise has approved the Final Plat, the Ada County Engineer must review and approve (approximately 8 weeks for review) prior to recording of the Final Plat. A building permit cannot be issued until the Final Plat is recorded.
Plan Review Completed(1st rev)  6/24/2004 DONE
Failed:
Planning Land Div.
Plan Check
Erosion & Sediment
Fire
Routing - FIRE6/23/2004 6/24/2004 FAIL
1. An existing and relocated hydrant were shown in the Grading Permit BLD03-01299 on 8th street. Now that this structures construction type is classified and will require fire sprinkler protection, the "Architect of Record" for the construction phase of this project will be required to ascertain the hydrant water flow available with the related construction type (reference IFC Appendix B105.1) for verification of meeting minimum fire code. Provide hydrant flows. Water flow information is available from United Water, by contacting, Doug Shaefer at ###-####, in certificate form. The required fire flow for this type II-B, 52,260-ft/2 will require a minimum 1,500-gpm flow. Note: These flows are different than water supply information flows). (IFC 105.2.1, 105.4.2)

2. Architect of Record for the construction phase of this project shall ascertain the water pressure and flow available for the automatic fire sprinkler system design. Provide static pressure, residual pressure and flows (IN GPM), of the water supply available, at the proposed system water supply connection, in certificate form. Water flow information is available from United Water, Doug Shaefer at ###-####. Provide and make available on the plans or attached documents this information to all contractors involved. This information is for uniformity and consistency in the fire sprinkler system design. (Note: These flows are different than hydrant flows). (IFC 105.2.1, 105.4.2)

3. The site grading and utility plans submitted in BLD03-01299, show the fire sprinkler service supply tap in 8th Street piped to the property line. This shell permit shall include the location of this tap at the property line and detailed where it will be installed in this structure. Provide revised plans addressing this scope of work. (IFC 105.2.1, 105.4.2)

4. Unless specifically approved by the code official, the fire sprinkler system main control valve(s) shall be installed in any one of the following configurations:
A. A Post Indicator Valve (PIV). Where practical a PIV shall be installed at least 40'-0" from the building.
B. A Wall Post Indicator Valve (WPIV).
A valve(s) installed on the riser itself provided the sprinkler riser room is separated from the building on all sides by a one-hour Occupancy Separation assembly, including opening and penetration protection, as defined by the Building Code. In addition to any other access doors, direct access into the riser room from the outside shall be provided. Signs identifying doors leading to the sprinkler system control assembly shall be permanently affixed to all doors so as to clearly identify the path to the riser assembly. Provide plans that address this code issue. (BMC 7-01-53:903.1.3, IFC 105.2.1, 105.4.2)
Routing - PLUMBING6/22/2004 6/23/2004 PASS
prime all floor drains, 2" cw header at restroom? verify. verify with public works termination of overflow drain to sanitary sewer system in parking garage or pipe to curb. page P2.2 note !. use boise city approved interceptor detail. attached.
Routing - PLAN CHECK6/23/2004 6/23/2004 FAIL
John Menard
Routing - PUBLIC WORKS6/17/2004 6/22/2004 PASS
Routing - Erosion and Sediment6/22/2004 6/22/2004 FAIL
No ESC permit application or waiver letter.
Routing - PLANNING6/22/2004 6/22/2004 PASS
Approve per DRH03-62.
Plan routing begun/NEW & ADDTN  6/16/2004  
Application received  6/16/2004  
Recd Pcfee & Taken To Pln CK  6/16/2004 DONE
Plans ACCEPTED BY PLAN TECH  6/16/2004 DONE
Fee Review-notes6/16/20046/16/2004