BLD-Final | 4/20/2006 | 4/21/2006 | 4/21/2006 | P | PASS |
Dave Hannah
|
|
|
Forrest should sign-off on the life safety in the AM. If it is signed off we would love to see you just after lunch. Thanks. ok for cc
|
FIRE-Final Inspection | 4/21/2006 | 4/21/2006 | 4/21/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, c/n items are complete.
|
Letter of compliance | | | 4/21/2006 | | DONE |
|
|
|
Letter of Compliance issued 4-21-06.
|
FIRE-Final Inspection | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | FAIL |
Forrest France
|
|
|
The project related alarm for Foster building failed inspection.
|
FIRE-Final Inspection | 4/19/2006 | 4/19/2006 | 4/20/2006 | P | NR |
Forrest France
|
|
|
Project related fire alarm is not finaled.
|
BLD-Framing/Rough-in | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Dave Hannah
|
|
|
Please call Dennis to view fireproofing for a cover-up. He may have already covered-up due because I did not schedule you yesterday....sorry. Internet Inspection Request from: Alex Monge
|
BLD-Other | 1/30/2006 | 1/31/2006 | 1/31/2006 | A | PART |
Dave Hannah
|
|
|
Inspection of Foster roof straps. Internet Inspection Request from: Alex Monge
|
BLD-Other | 1/11/2006 | 1/12/2006 | 1/12/2006 | A | DONE |
Dave Hannah
|
|
|
Foster Building sheating at roof to cover-up with foam.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Final | 1/4/2006 | 1/5/2006 | 1/5/2006 | P | NR |
Dave Hannah
|
|
|
Final for C of O for Building 4.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
FIRE-Final Inspection | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PART |
Forrest France
|
|
|
Life safety final pending the completion and final of the related alarm permit for this project which includes BODO 4 and the Foster building monitoring.
|
BLD-Final | 10/26/2005 | 10/27/2005 | 10/28/2005 | P | NR |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 10/25/2005 | 10/26/2005 | 10/28/2005 | P | FAIL |
Dave Hannah
|
|
|
Building 4 Shell & Core final to allow Stratton to operate...2nd floor. Internet Inspection Request from: Alex Monge needs fire sign off and elev sign off along with finishing stair tower fire proofing
|
FIRE-Final Inspection | 10/25/2005 | 10/26/2005 | 10/26/2005 | P | NR |
Forrest France
|
|
|
Items on previous inspection correction notice dated 10/24 have not been completed at this time.
|
BLD-Final | 10/25/2005 | 10/25/2005 | 10/26/2005 | P | NR |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs other trades to sign off
|
FIRE-Final Inspection | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | NR |
Forrest France
|
|
|
Several items on the correction notice have not been completed as noticed during the course of a related inspection, no inspection performed. Contacted John the GC for notification of the situation.
|
BLD-Final | 10/21/2005 | 10/24/2005 | 10/25/2005 | P | NR |
Dave Hannah
|
|
|
Final egress inspection (1st floor only to accomodate PF Chang, Entire building egress will be Thur/Friday. I will schedule for that later) in the afternoon. Please call Alex Monge @ ###-#### when you arrive. Thanks. Internet Inspection Request from: Alex Monge
|
FIRE-Final Inspection | 10/21/2005 | 10/24/2005 | 10/24/2005 | P | FAIL |
Forrest France
|
|
|
A 12 item correction list was discussed and left with Gary of Devcon construction for the shell permit life safety.
|
Plan resubmittals received | | | 10/24/2005 | | |
|
|
|
Received (1) copy of SE1, SE1A, SE1B, SE1C, S06, S07, S07A, S08, S02B, SE2, S02 and S02A. Also received (1) copy of structural calcs and (1) transmittal letter. Routed to John M.
|
Inspection Record Card- Bld | | | 10/21/2005 | | DONE |
|
|
|
|
BLD-Conference | 10/13/2005 | 10/17/2005 | 10/18/2005 | A | PASS |
Dave Hannah
|
|
|
10:00 am conference with Dave Hanna, Sam & Forest. Please call Dennis at ###-#### to cofirm attendance.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
FIRE-Conference | 10/13/2005 | 10/17/2005 | 10/17/2005 | A | DONE |
Forrest France
|
|
|
On site discussion regarding inspection scheduling, project phasing, shell and tenant inspections, requirements for occupancy.
|
BLD-Conference | 10/7/2005 | 10/7/2005 | 10/10/2005 | P | DONE |
Dave Hannah
|
|
|
Conference for PF Chang TCO. Call Alex at ###-#### to confirm time. Internet Inspection Request from: Alex Monge
|
BLD-Conference | 9/8/2005 | 9/9/2005 | 9/9/2005 | A | PASS |
Dave Hannah
|
|
|
Gary would like an inspection/conference regarding some info. on building 4. Call ###-#### Internet Inspection Request from: Alex Monge
|
Case Summary (BLD) | | | 9/1/2005 | | DONE |
|
|
|
|
BLD-Conference | 7/28/2005 | 7/29/2005 | 8/1/2005 | P | DONE |
Dave Hannah
|
|
|
Dave: I would like to do a quick/informal review regarding requirements to open Building 4 Businesses. Please come to the site office-Alex Monge; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 6/21/2005 | 6/22/2005 | 6/23/2005 | A | PASS |
Dave Hannah
|
|
|
Rouhg-framing inspection for Building 4. Call Paul Fishley ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 6/8/2005 | 6/9/2005 | 6/9/2005 | A | PART |
Dave Hannah
|
|
|
Fire safing inspection. Call Paul ###-####. I tried to schedule this today but had a block on our permit. Paul needs this looked at first thing if possible. Thanks..alexmonge ok to coverInternet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 5/10/2005 | 5/11/2005 | 5/11/2005 | A | PART |
Dave Hannah
|
|
|
Fire Caulking inspection at CMU wall. early am if possible. Call Paul ###-#### Internet Inspection Request from: Alex Mongeeverything thing they have completed is ok
|
BLD-Conference | 5/4/2005 | 5/5/2005 | 5/5/2005 | A | PASS |
Dave Hannah
|
|
|
preconstruction meeting
|
BLD-Framing/Rough-in | 5/2/2005 | 5/2/2005 | 5/2/2005 | P | PART |
Dave Hannah
|
|
|
Core wall framing inspection. Internet Inspection Request from: Alex Monge ok to cover walls on ext gaage side
|
BLD-Framing/Rough-in | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | PART |
Dave Hannah
|
|
|
Rough framing inspection. Internet Inspection Request from: Alex Monge walked project with forman 4/12/2005 9:29:08 AM
|
BLD-Concrete | 3/16/2005 | 3/18/2005 | 3/18/2005 | A | DONE |
Dave Hannah
|
|
|
7:00 am slab on deck pour (2nd pour) Internet Inspection Request from: Alex Monge
|
BLD-Conference | 3/16/2005 | 3/17/2005 | 3/17/2005 | A | DONE |
Dave Hannah
|
|
|
9:00 conference at the Bodo site office w/ Dave Anderson and Paul Fishley.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 3/16/2005 | 3/17/2005 | 3/17/2005 | A | PART |
Dave Hannah
|
|
|
7:00 slab on deck pour Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 2/16/2005 | 2/17/2005 | 2/17/2005 | A | PART |
Dave Hannah
|
|
|
Slab on Grade pour - 7:00 am start Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 1/28/2005 | 1/31/2005 | 1/31/2005 | A | DONE |
Dave Hannah
|
|
|
6:30 slab on grade pour (1/4 of building) Internet Inspection Request from: Alex Monge
|
BLD-Footing | 1/28/2005 | 1/28/2005 | 1/28/2005 | P | PART |
Tom Arcoraci
|
|
|
Concrete footings at east end at 1:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 1/21/2005 | 1/24/2005 | 1/24/2005 | A | PART |
Dave Hannah
|
|
|
Slab on Grade pour (North 1/3 of building slab) Internet Inspection Request from: Alex Monge
|
BLD-Concrete | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | DONE |
Dave Hannah
|
|
|
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/17/2005 | 1/17/2005 | 1/17/2005 | P | DONE |
Dave Hannah
|
|
|
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/13/2005 | 1/13/2005 | 1/13/2005 | P | PART |
Dave Hannah
|
|
|
Grout placement at 1:30 pm Internet Inspection Request from: Alex Monge
|
BLD-Footing | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Dave Hannah
|
|
|
Concrete at 2:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Dave Hannah
|
|
|
CMU wall grout at 1:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Footing | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | PART |
Dave Hannah
|
|
|
1:00 pm concrete at footings. Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | PART |
Dave Hannah
|
|
|
1:30 Grout at CMU wall. Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | DONE |
Dave Hannah
|
|
|
10:00 am CMU grout. Internet Inspection Request from: Alex Monge
|
BLD-Footing | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | DONE |
Dave Hannah
|
|
|
1:00 pm concrete pour at footings Internet Inspection Request from: Alex Monge
|
BLD-Footing | 12/28/2004 | 12/29/2004 | 12/29/2004 | P | PART |
Dave Hannah
|
|
|
Stem wall and footings at 1:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 12/27/2004 | 12/27/2004 | 12/27/2004 | P | PART |
Dave Hannah
|
|
|
Grout at CMU wall, 1:00 pm Internet Inspection Request from: Alex Monge
|
BLD-Footing | 12/22/2004 | 12/23/2004 | 12/23/2004 | P | PART |
Dave Hannah
|
|
|
1:00 column pour. Internet Inspection Request from: Alex Monge
|
BLD-Footing | 12/17/2004 | 12/20/2004 | 12/20/2004 | P | PART |
Tom Arcoraci
|
|
|
2:00 pm Footing pour at CMU wall-Northwest corner by Foster building Internet Inspection Request from: Alex Monge pending spec insp 12/20/2004 1:49:02 PM
|
BLD-Foundation | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | PART |
Tom Arcoraci
|
|
|
12:00 Grout at CMU wall. Internet Inspection Request from: Alex Monge pending spec insp 12/20/2004 1:49:12 PM
|
BLD-Footing | 12/16/2004 | 12/17/2004 | 12/17/2004 | P | PART |
Dave Hannah
|
|
|
CMU wall footing pour at 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 12/15/2004 | 12/16/2004 | 12/16/2004 | P | PART |
Dave Hannah
|
|
|
Groiut a block courses at 11:30 and 3:00. ; Phone #: ###-####
|
BLD-Foundation | 12/14/2004 | 12/14/2004 | 12/14/2004 | P | PART |
Dave Hannah
|
|
|
CMU Grout pour at 2:00 pm; Phone #: ###-####
|
BLD-Foundation | 12/10/2004 | 12/10/2004 | 12/10/2004 | P | DONE |
Dave Hannah
|
|
|
Grout 5' lift at CMU wall at 1:00. ; Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Foundation | 12/9/2004 | 12/9/2004 | 12/9/2004 | P | CANC |
Dave Hannah
|
|
|
Grout at CMU wall; Phone #: ###-####
|
BLD-Concrete | 12/7/2004 | 12/7/2004 | 12/7/2004 | P | PART |
Dave Hannah
|
|
|
CMU wall second lift grout poor at 12:00 noon.; Phone #: ###-####
|
BLD-Foundation | 12/3/2004 | 12/6/2004 | 12/6/2004 | P | PART |
Dave Hannah
|
|
|
Grouting 5' lift of CMU wall adjacent to parking garage at approx. 1:00; Phone #: ###-####
|
BLD-Conference | 12/2/2004 | 12/3/2004 | 12/3/2004 | A | DONE |
Dave Hannah
|
|
|
Testing 1-2-3....Not sure if you want a conference w/ Paul Fishley. Call him at the above number to set-up a time.; Phone #: ###-####
|
(F) Reprint permit | | | 12/3/2004 | | |
|
|
|
|
BLD-Other | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Dave Hannah
|
|
|
masonry along garage drilling and epoxy mti on site checking 12/3/2004 8:23:05 AM
|
Issue PAID IN FULL permit | | | 12/2/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/30/2004 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 6/17/2004 | | 11/29/2004 | | PASS |
John Menard
|
|
|
11/29/2004 08:32:57 JCM - activity updated through activity BLDA022 from case BLD04-01323.
|
Routing - PLAN CHECK | 11/24/2004 | | 11/29/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/29/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/29/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2004 | | |
|
|
|
left mess that permits is ready for james woodbury at ###-####
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 11/24/2004 | | 11/24/2004 | | PASS |
|
|
|
Approved. Final Plat of Front Street Condominiums recorded on November 23, 2004.
|
Routing Off Site - STRUCTURAL | 10/4/2004 | | 10/6/2004 | | PASS |
|
|
|
Marlene took plans for geopiers to structural engineer for review. JCM
|
Plan resubmittals received | | | 10/4/2004 | | DONE |
|
|
|
Received plans for geopier foundation supports. JCM
|
Routing - PLAN CHECK | 7/19/2004 | | 10/4/2004 | | |
|
|
|
|
Plan resubmittals received | | | 8/2/2004 | | DONE |
|
|
|
Received letter of transmittal with four sets of sheets A2.1,A2.2,A2.3,A7.1,A7.3,A9.3,S1.1, taken to John M.\\rad
|
Routing - FIRE | 7/16/2004 | | 7/19/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing Off Site - STRUCTURAL | 7/14/2004 | | 7/16/2004 | | FAIL |
|
|
|
Resubmittals taken to consulting structural engineer by Marlene Southard. JCM Received comment list from consulting structural engineer on the resubmittals requesting additional revisions. JCM
|
Plan resubmittals requested | | | 7/16/2004 | | |
|
|
|
e-mailed Sylvester Ramirez a copy of the plan review comment list and a copy of the comments from the consulting structural engineer. JCM
|
Routing - PLAN CHECK | 7/1/2004 | | 7/16/2004 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 7/14/2004 | | |
|
|
|
Received revised plans for BoDo Building #4, including sheets #EN-1, C1.1, all architectural sheets, all structural sheets and all electrical sheets, along with a response letter on the structural, nonstructural and fire comments. JCM
|
Routing - Erosion and Sediment | 6/30/2004 | | 7/1/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals received | | | 6/30/2004 | | DONE |
|
|
|
Received two copies of esc narrative and esc plan taken to John M.
|
Plan Reviewer's activity | | | 6/30/2004 | | |
|
|
|
Inserted ESC plans and routed to ESC. JCM
|
Routing - PLAN CHECK | 6/24/2004 | | 6/30/2004 | | |
|
|
|
|
Plan resubmittals requested | | | 6/29/2004 | | |
|
|
|
E-mailed Sylvester Ramirez a copy of the comment list from the consulting structural engineer, requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 6/16/2004 | | 6/29/2004 | | FAIL |
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING Land Div | 6/16/2004 | | 6/24/2004 | | FAIL |
|
|
|
Need to record condo plat (Front Street Condos) SUB02-00070. Final Plat approved by City Council on January 14, 2003. Called Sylvester Ramirez on June 17, 2004 at ###-####.
Update - June 24, 2004
Existing parking garage is not in compliance with required setbacks and no land division was approved by Boise City after Record of Survey 4629 was approved upon which the buillding permit for the parking garage was issued. The current property ownership does not reflect Record of Survey 4629. Land division cannot be approved until setbacks are resolved with Building Division. BODO structure has not been included on condo plat of SUB02-00070. BODO structure must be shown on condo plat. Amended condo plat will require re-submittal for Planning and Zoning Commission approval and City Council approval. After Boise has approved the Final Plat, the Ada County Engineer must review and approve (approximately 8 weeks for review) prior to recording of the Final Plat. A building permit cannot be issued until the Final Plat is recorded.
|
Plan Review Completed(1st rev) | | | 6/24/2004 | | DONE |
|
|
|
Failed:
Planning Land Div.
Plan Check
Erosion & Sediment
Fire
|
Routing - FIRE | 6/23/2004 | | 6/24/2004 | | FAIL |
|
|
|
1. An existing and relocated hydrant were shown in the Grading Permit BLD03-01299 on 8th street. Now that this structures construction type is classified and will require fire sprinkler protection, the "Architect of Record" for the construction phase of this project will be required to ascertain the hydrant water flow available with the related construction type (reference IFC Appendix B105.1) for verification of meeting minimum fire code. Provide hydrant flows. Water flow information is available from United Water, by contacting, Doug Shaefer at ###-####, in certificate form. The required fire flow for this type II-B, 52,260-ft/2 will require a minimum 1,500-gpm flow. Note: These flows are different than water supply information flows). (IFC 105.2.1, 105.4.2)
2. Architect of Record for the construction phase of this project shall ascertain the water pressure and flow available for the automatic fire sprinkler system design. Provide static pressure, residual pressure and flows (IN GPM), of the water supply available, at the proposed system water supply connection, in certificate form. Water flow information is available from United Water, Doug Shaefer at ###-####. Provide and make available on the plans or attached documents this information to all contractors involved. This information is for uniformity and consistency in the fire sprinkler system design. (Note: These flows are different than hydrant flows). (IFC 105.2.1, 105.4.2)
3. The site grading and utility plans submitted in BLD03-01299, show the fire sprinkler service supply tap in 8th Street piped to the property line. This shell permit shall include the location of this tap at the property line and detailed where it will be installed in this structure. Provide revised plans addressing this scope of work. (IFC 105.2.1, 105.4.2)
4. Unless specifically approved by the code official, the fire sprinkler system main control valve(s) shall be installed in any one of the following configurations:
A. A Post Indicator Valve (PIV). Where practical a PIV shall be installed at least 40'-0" from the building.
B. A Wall Post Indicator Valve (WPIV).
A valve(s) installed on the riser itself provided the sprinkler riser room is separated from the building on all sides by a one-hour Occupancy Separation assembly, including opening and penetration protection, as defined by the Building Code. In addition to any other access doors, direct access into the riser room from the outside shall be provided. Signs identifying doors leading to the sprinkler system control assembly shall be permanently affixed to all doors so as to clearly identify the path to the riser assembly. Provide plans that address this code issue. (BMC 7-01-53:903.1.3, IFC 105.2.1, 105.4.2)
|
Routing - PLUMBING | 6/22/2004 | | 6/23/2004 | | PASS |
|
|
|
prime all floor drains, 2" cw header at restroom? verify. verify with public works termination of overflow drain to sanitary sewer system in parking garage or pipe to curb. page P2.2 note !. use boise city approved interceptor detail. attached.
|
Routing - PLAN CHECK | 6/23/2004 | | 6/23/2004 | | FAIL |
|
|
|
John Menard
|
Routing - PUBLIC WORKS | 6/17/2004 | | 6/22/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 6/22/2004 | | 6/22/2004 | | FAIL |
|
|
|
No ESC permit application or waiver letter.
|
Routing - PLANNING | 6/22/2004 | | 6/22/2004 | | PASS |
|
|
|
Approve per DRH03-62.
|
Plan routing begun/NEW & ADDTN | | | 6/16/2004 | | |
|
|
|
|
Application received | | | 6/16/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/16/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/16/2004 | | DONE |
|
|
|
|
Fee Review-notes | 6/16/2004 | 6/16/2004 | | | |
|
|
|
|