Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD04-01324
StatusFinaled
Name DEVCON CONSTRUCTION INC
Site Address 301 S CAPITOL BLVD
Project NameBODO BUILDING 7
Customer Number 
ePlanReviewNo
Description
BoDo - Building #7 (Shell) - To construct a new 135,950 square foot, three story, noncombustible, fully fire sprinklered shell building for future multi-plex theater, offices, retail and restaurant tenants. The new building is being constructed with nonseparated uses with the A-1 Occupancy being the most restrictive. The fire sprinkler system is being used for area increase. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permit are required to finish this building for occupancy. All construction per the approved plans and attached comment list. Note: This permit is being modified to include the construction of a nonrated corridor to accommodate any future required second exits from any of the future tenant spaces. This corridor is approximately 365 feet long and will run between two exterior doors, one on the south near grid line 2 and on the east at grid line D. DR04-61/ #04-386/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  3/27/2007  
Letter of compliance  4/6/2006 DONE
Letter of Compliance issued 4-6-06.
BLD-Final4/4/20064/5/20064/5/2006PPASS
DetailsDave Hannah
paul fishley; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for cert of comp
FIRE-Final Inspection4/4/20064/5/20064/5/2006APASS
DetailsTroy Cobbley
Project related alarm and sprinkler have been completed, life safety finaled.
BLD-Final11/10/200511/10/200511/14/2005PPART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore temp occ issued c/n on site also needs other trades to sign off perm
FIRE-Final Inspection11/9/200511/10/200511/10/2005APART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include adding an emergency light in the west projector room and installing the fire extinguishers. The fire alarm and fire sprinkler permits need finalling as well.
Override - Parcel Holds1/1/19001/1/190011/10/2005  
bld final
BLD-Final11/7/200511/7/200511/9/2005PDEFR
DetailsDave Hannah
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Override - Parcel Holds1/1/19001/1/190011/9/2005  
per fire insp
FIRE-Final Inspection11/7/200511/7/200511/7/2005PPART
DetailsForrest France
Final not complete, see correction notice for a list of items.
Override - Parcel Holds1/1/19001/1/190011/7/2005  
need fn insp
Override - Parcel Holds1/1/19001/1/190011/7/2005  
need fire insp
BLD-Final11/3/200511/4/200511/4/2005ANR
DetailsDave Hannah
john --pending bld fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection11/3/200511/4/200511/4/2005AFAIL
DetailsForrest France
Not all curb painting is completed, three exit signs and two emergency lights are not functional, exterior doors are not installed in some locations.
FIRE-Final Inspection11/2/200511/3/200511/3/2005AFAIL
DetailsForrest France
Emergency lighting and exit signs in several locations are not functional, exit doors at north and west sides are not installed yet, some exit discharge lighting is not installed on the east and south sides, fire lane marking remains to be completed, not all items reviewed at this inspection.
FIRE-Final Inspection11/1/200511/2/200511/3/2005ANR
DetailsForrest France
Project is not ready for life safety inspection, several items remain incomplete.
Override - Parcel Holds1/1/19001/1/190011/3/2005  
fire & bld insp
Override - Parcel Holds1/1/19001/1/190011/3/2005  
need insp
Override - Parcel Holds1/1/19001/1/190011/3/2005  
need insp
FIRE-Final Inspection10/31/200511/1/200511/2/2005ACANC
DetailsForrest France
No time available to perform this inspection on 11/1 as scheduled, inspection to be rescheduled for 11/2.
BLD-Final11/1/200511/1/200511/1/2005PNR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walked project with dennis will finish tommow
BLD-Final10/31/200510/31/200511/1/2005PNR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs fire signoffs
Plan resubmittals received  11/1/2005 DONE
Received 2 Transmittal Letters, 3 Structural Calcs, & 3 copys of sheets E2,4,5 ( plans issued 10-14-05 ) Taken to John M.
Override - Parcel Holds1/1/19001/1/190010/31/2005  
Override - Parcel Holds1/1/19001/1/190010/31/2005  
Override - Parcel Holds  10/31/2005  
Code Occupancy Approval Temp  10/31/2005 DONE
Temp approved
BLD-Framing/Rough-in10/25/200510/26/200510/28/2005APART
DetailsDave Hannah
Ceiling inspection for Shell & Core ground floor corridors. Internet Inspection Request from: Alex Monge ceiling in lobby at front st elev ok to cover
(F) Reprint permit  10/25/2005 DONE
Print Occupancy Form  10/25/2005 DONE
Inspection Record Card- Bld  10/21/2005 DONE
Plan resubmittals received  10/21/2005  
Received (1) copy of sheet S21, S22, S22A, S23, SE6, SE2, SE2A, SE2B, SE2C, S10, S11, S11A, S12, S12A, S13, S14, S15, SE4, SE4A, S18, S19, S20, SE1, SE1A, S01, S02, S03, S04, SE3, SE3A, S24, S25, S25A, S26, S27, S28 and S29. Also received (3) sets of structural calcs and (1) transmittal letter. Routed to John M.
BLD-Conference10/13/200510/17/200510/18/2005APASS
DetailsDave Hannah
10:00 am conference with Dave Hanna, Sam & Forest. Please call Dennis at ###-#### to cofirm attendance.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
FIRE-Conference10/13/200510/17/200510/17/2005ADONE
DetailsForrest France
On site meeting to discuss inspection scheduling, project phasing, shell and tenant inspections, requirements for occupancy.
BLD-Framing/Rough-in10/12/200510/13/200510/14/2005APART
DetailsDave Hannah
Please call Dennis for specifics. Inspection of fire proofing prior to sheet-rock. Internet Inspection Request from: Alex Monge ticket both front entery stair # 2 and #3 ok to cover
BLD-Framing/Rough-in10/13/200510/14/200510/14/2005ADONE
DetailsDave Hannah
Please call Dennis to confirm inspection location. Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in10/12/200510/12/200510/13/2005PPART
DetailsDave Hannah
Check Theater Stair#2 for fire proofing per our request this morning. Thanks. Internet Inspection Request from: Alex Monge columns at tickit both area ok to cover stair tower #2 and elev shaft ok to proseed
BLD-Framing/Rough-in10/11/200510/11/200510/12/2005PPART
DetailsDave Hannah
Check Theater Stair#3 for fire proofing per our request this morning. Thanks. Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in10/10/200510/10/200510/11/2005PPART
DetailsDave Hannah
Check Theater Stair#3 for fire proofing per our request this morning. Thanks. Internet Inspection Request from: Alex Monge ok to start sheet rocking
BLD-Framing/Rough-in10/7/200510/7/200510/10/2005PPART
DetailsDave Hannah
Rough-framing inspection. Call Dennis. Internet Inspection Request from: Alex Monge
Receive PAYMENT IN FULL PRINT  9/13/2005 DONE
CHANGE STATUS TO (ISS)  9/13/2005 DONE
issued previously because of a plan mod
Inspection Record Card- Bld  9/8/2005 DONE
Permit Ready to Issue  9/8/2005 DONE
Telephone call  9/8/2005 DONE
talked to secretary with devcon const at ###-#### is ready & needed achd approval
Routing - PLAN CHECK8/9/2005 9/6/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/6/2005 DONE
Plan assigned to (JCM)7/13/2005 9/6/2005 PASS
9/6/2005 13:40:48 JCM - activity updated through activity BLDA022 from case BLD04-01324.
Plan resubmittals received  9/1/2005  
Received (2) copies of sheet E0.01, E2.11F, E2.11L, E2.11P and E3.01. Routed to John M.
Routing - FIRE7/26/2005 8/9/2005 PASS
Modifications acceptable.
Plan resubmittals received  8/4/2005  
Received (3) copies of sheet A0.1 and AT2.1. Routed to John M.
Plan resubmittals received  7/27/2005 DONE
Received 1 response, & 3 Copys of sheets AT2.1, A7.4, A9.3 Taken to John M.
Routing - PLAN CHECK7/21/2005 7/26/2005 FAIL
PLAN MODIFICATION
Plan resubmittals requested  7/26/2005 DONE
E-mailed Sylvester Ramirez a copy of the plan review comments for the proposed modification. JCM
Routing - PLANNING7/13/2005 7/21/2005  
Routed plans to Sarah to review exterior modifications. JCM
Called Sylvester Ramirez re: the overhead door needing modification as well as the exit doors. At this time the applicant has requested that the interior work (corridors) be approved so that the portion of construction can continue and they will submit a modification to DR for exterior changes then submit revised documents to the building department for revised exterior work.
7/21/05
Plan Modification Accepted  7/13/2005  
Plan modification accepted to incorportate a service cooridor within the building that serves the new retail tenant for stocking of goods and as a secondary exit for units requiring an additional exit. Exterior door modifications required to accommodate exiting of service cooridor and theater. A1.2, AT2.1, A3.1, A3.2, A7.4, A9.1, A9.2 and A9.3. Routed to John M.
Plan Modification Accepted  7/12/2005  
CHANGE STATUS TO (PND)  7/12/2005 DONE
plan modification
Plan resubmittals received  7/8/2005  
Received (3) copies of sheet A1.2, AT2.1, A3.1, A3.2, A7.4, A9.1, A9.2 and A9.3. Routed to John M.
BLD-Conference6/29/20056/29/20056/30/2005PPASS
DetailsDave Hannah
Please call Alex at ###-#### of Kelly Bartlet at ###-#### approx. 1/2 prior to your arrival so we can discuss the handrail issue at Office Stair# 2. I would like to meet around 3:00 pm Thank you. Internet Inspection Request from: Alex Monge talked about handrails center rail in stair towers at landings ok as installed with offset
BLD-Other6/24/20056/27/20056/27/2005ADONE
DetailsDave Hannah
Handrail inspection for code acceptability. Dave-we have some concerns about the installed handrail and would like your review prior to final installation. Office Stair#2. Call me (Alex) when you are on your way. Thanks.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in6/16/20056/17/20056/23/2005APART
DetailsDave Hannah
Framing Final Inspection-Late Morning. Internet Inspection Request from: Alex Monge ext walls second floor
BLD-Framing/Rough-in6/14/20056/16/20056/17/2005PPART
DetailsDave Hannah
Roof smoke seal for cover-up Internet Inspection Request from: Alex Monge fire stopping around roof at curton wall remainder of high roof
BLD-Framing/Rough-in6/14/20056/15/20056/16/2005PPART
DetailsDave Hannah
Rough-Framing for cover-up Internet Inspection Request from: Alex Monge ext walls ok
BLD-Framing/Rough-in6/6/20056/7/20056/7/2005APART
DetailsDave Hannah
Forestop at roof framing. Internet Inspection Request from: Alex Monge curton wall fire stopping 1 hr noryh half broad and lower part of front ok
BLD-Framing/Rough-in6/1/20056/2/20056/2/2005APART
DetailsDave Hannah
Inspection of fire stopping at roof deck and exterior wall. Internet Inspection Request from: Alex Monge fire proofing on curten wall around roof part of 8th st and front st
BLD-Framing/Rough-in5/20/20055/20/20055/23/2005PPART
DetailsDave Hannah
Roof Framing inspection. Internet Inspection Request from: Alex Monge parapet wall framing ok need to fire block curtion wall
BLD-Conference5/4/20055/5/20055/5/2005APASS
DetailsDave Hannah
preconstruction meeting
BLD-Conference3/16/20053/17/20053/17/2005ADONE
DetailsDave Hannah
9:00 conference at Bodo site office w/ Dave Anderson and Paul Fishley.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Concrete2/28/20053/1/20053/1/2005ADONE
DetailsDave Hannah
7:00 am slab on metal deck pour (2nd level) Internet Inspection Request from: Alex Monge
BLD-Concrete2/24/20052/25/20052/25/2005ADONE
DetailsDave Hannah
Second slab on deck pour - 7:00 am Internet Inspection Request from: Alex Monge
BLD-Footing12/28/200412/29/200412/29/2004PPART
DetailsDave Hannah
Footing pour at 1:00 pm Internet Inspection Request from: Alex Monge
BLD-Concrete12/20/200412/21/200412/21/2004APART
DetailsDave Hannah
slab on grade pour-6:00 am Internet Inspection Request from: Alex Monge
BLD-Concrete12/15/200412/16/200412/16/2004ADONE
DetailsDave Hannah
Slab on Grade Pour Internet Inspection Request from: Alex Monge
BLD-Foundation12/14/200412/14/200412/14/2004PPART
DetailsDave Hannah
Footing pour at 2:00 pm; Phone #: ###-####
BLD-Footing12/10/200412/13/200412/13/2004PPART
DetailsDave Hannah
Pour pad footings after lunch.; Phone #: ###-####
BLD-Footing12/10/200412/10/200412/10/2004PDONE
DetailsDave Hannah
Pad footing pour after lunch.; Phone #: ###-####
BLD-Footing12/8/200412/9/200412/9/2004PPART
DetailsDave Hannah
Column poad pour between 1:00 and 2:00.; Phone #: ###-####
BLD-Footing12/7/200412/7/200412/7/2004PPART
DetailsDave Hannah
Concrete pour at 2:00 - column pads; Phone #: ###-####
BLD-Foundation12/6/200412/6/200412/6/2004PPART
DetailsDave Hannah
interior coulmn pads on grid line B. 2:00 pour.; Phone #: ###-####
BLD-Footing12/2/200412/2/200412/2/2004PPART
DetailsDave Hannah
Dave Anderson; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Conference11/22/200411/23/200411/23/2004APASS
DetailsDave Hannah
Meeting requested by Dave Hannah with subcontractors- Meeting at 9:00 at DevCon site office.; Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Conference11/22/200411/23/200411/23/2004APASS
DetailsDave Hannah
Alex; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Footing11/18/200411/19/200411/19/2004APART
DetailsDave Hannah
Alex; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
(F) Reprint permit  10/15/2004  
Issue PAID IN FULL permit  10/14/2004 DONE
Routing - PLAN CHECK10/4/2004 10/11/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/11/2004 DONE
Permit Ready to Issue  10/11/2004 DONE
Inspection Record Card- Bld  10/11/2004  
Telephone call  10/11/2004  
left mess for james woodbury at 1-###-#### that permit is ready
Plan assigned to (JCM)6/16/2004 10/11/2004 PASS
DetailsJohn Menard
10/11/2004 08:55:13 JCM - activity updated through activity BLDA022 from case BLD04-01324.
Routing Off Site - STRUCTURAL10/8/2004 10/8/2004 PASS
E-mailed response from project engineer to the consulting structural engineer. JCM Received an e-mail from the consulting engineer approving the last resubmittals. JCM
Plan resubmittals requested  10/6/2004  
E-mailed the applicant a copy of the consulting structural engineers comments requesting additional information. JCM
Routing Off Site - STRUCTURAL10/4/2004 10/6/2004 FAIL
Marlene took plans for geopiers to consulting structural engineer for review. JCM Received request for additional information on geopiers. JCM
Plan resubmittals received  10/5/2004 DONE
Received two copies of Geoplier location plan, two copies of design submittal letter and two copies of specifications for aggregate pier soil reinforcement. Routed to John M. kmm
Routing - PLANNING Land Div10/4/2004 10/4/2004 PASS
Parcel has been combined into one ownership.
Routing - PLAN CHECK9/9/2004 10/4/2004  
Plan resubmittals received  10/4/2004  
Received one copy of plans for geopier foundation supports. JCM
Routing - PLANNING9/8/2004 9/9/2004 PASS
Approve per DRH04-61 and as noted on plans.
Plan resubmittals received  9/9/2004 DONE
Received Transmittal Letter, & 4 Sets of A2.3,A2.4,A3.1,A3.6,S2.2,S2.3 Taken to John Menard....
Routing - PLAN CHECK8/27/2004 9/8/2004  
Routing - FIRE8/25/2004 8/27/2004 PASS
resubmittal acceptable
Routing Off Site - STRUCTURAL8/20/2004 8/26/2004 PASS
CALLED PDQ FOR PICK-UP... Received e-mail with attached letter approving resubmitted structural plans and calculations. JCM
Plan resubmittals requested  8/25/2004  
E-mailed the architect requesting additional revisions. JCM
Plan resubmittals requested  8/25/2004 DONE
E-mailed the architect and requested additional revisions. JCM
Routing - PLAN CHECK7/2/2004 8/25/2004 FAIL
Plan resubmittals received  8/20/2004 DONE
Received Transmittal Letter, & 1 Calc Book Taken to John Menard....
Plan resubmittals received  8/19/2004 DONE
Received Transmittal Letter, & 4 Sets of A0.1,C1.1,A1.1, A1.2 A2.1,A2.2,A2.3,A2.4, A3.1,A3.2,A3.3,A3.4,A3.5,A3.6 A7.1,A7.2,A7.3,A7.4, A9.1,A9.2,A9.3,A9.4, S1.1,S1.2, S2.1,S2.2,S2.3,S2.4,S2.5, S3.1,S3.2,S3.3 S4.1 S5.1,S5.2,S5.3,S5.4, S6.1,S6.2,S6.3,S6.4,S6.5 Taken to John Menard...
Plan resubmittals requested  7/13/2004  
E-mailed Sylvester Ramirez a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL6/16/2004 7/12/2004 FAIL
Taken to outside engineering. DLD Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK7/1/2004 7/1/2004  
Routing - Erosion and Sediment7/1/2004 7/1/2004 PASS
ESC plan approved with attached conditions.
Plan resubmittals received  6/30/2004 DONE
Received two copies of esc narrative and esc plan taken to John M.
Plan Review Completed(1st rev)  6/30/2004 FAIL
failed Plan Land Div, Planning, ESC, Plan check and Fire.
Routing - FIRE6/29/2004 6/30/2004 FAIL
no hydrants, hydrant flow, sprinkler connection/valving, or standpipes are shown. Review faxed to architect.
Plan resubmittals requested  6/29/2004  
E-mailed Sylvester Ramirez a copy of the plans review requesting revisions. JCM
Routing - PLAN CHECK6/24/2004 6/29/2004 FAIL
Routing - PLUMBING6/24/2004 6/24/2004 PASS
attached is city of boise approved grease interceptor detail
Routing - PLANNING6/22/2004 6/24/2004 FAIL
Need to review final plans for compliance with conditions of DRH03-00061. Contacted Sylvester Ramirez 6/24/04. Route to others first.
Routing - PUBLIC WORKS6/17/2004 6/22/2004 PASS
Routing - Erosion and Sediment6/22/2004 6/22/2004 FAIL
No ESC permit application or narrative attached to plan.
Routing - PLANNING Land Div6/16/2004 6/17/2004 FAIL
Need to record deed with metes and bounds description and obtain new tax parcel number. Alley vacation approved by SOS03-00004. Called Syvester on June 17, 2004 at ###-####. He said someone is working on the deed.
Plan routing begun/NEW & ADDTN  6/16/2004 DONE
Application received  6/16/2004  
Recd Pcfee & Taken To Pln CK  6/16/2004 DONE
Plans ACCEPTED BY PLAN TECH  6/16/2004 DONE
Fee Review-notes6/16/20046/16/2004