Telephone call | | | 3/30/2007 | | DONE |
|
|
|
call to Sonju w/ Debest she will check FV and call back.
|
Telephone call | | | 3/29/2007 | | DONE |
|
|
|
telephone call to mike w/ reiverside elec need to fv on both riverside's ele permits, left msg on ans mach.
|
FIRE-Final Inspection | 12/18/2006 | 12/18/2006 | 12/18/2006 | A | PASS |
Forrest France
|
|
|
Life safety passed inspection, the provided fire extinguishers on site to be mounted on the walls at locations as agreed, one "sticking" exit door threshold at the first floor south to be repaired prior to structural final.
|
BLD-Grading Inspection | 12/15/2006 | 12/18/2006 | 12/18/2006 | A | PART |
Jim Storey
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett final ok pending ele sign off of outside work.
|
FIRE-Final Inspection | 12/15/2006 | 12/15/2006 | 12/18/2006 | P | DEFR |
Forrest France
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Aging Inspection | 11/14/2006 | 11/14/2006 | 11/14/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 9/11/2006 | 9/11/2006 | 9/11/2006 | | NR |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Energy code compliance | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Aging Inspection | 4/12/2006 | 4/12/2006 | 4/12/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 2/9/2006 | 2/10/2006 | 2/10/2006 | A | PART |
Jim Storey
|
|
|
mike lyle ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa framing ok pending others and stairs.
|
BLD-Aging Inspection | 12/19/2005 | 12/19/2005 | 12/19/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 10/17/2005 | 10/17/2005 | 10/17/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 8/16/2005 | 8/16/2005 | 8/16/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 6/16/2005 | 6/16/2005 | 6/16/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Foundation | 12/27/2004 | 12/28/2004 | 12/28/2004 | A | PASS |
Jim Storey
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice rebar ok. 12/28/2004 11:03:58 AM
|
BLD-Footing | 12/21/2004 | 12/22/2004 | 12/22/2004 | P | PASS |
Jim Storey
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice ft rebar ok 12/22/2004 2:07:20 PM
|
BLD-Footing | 11/8/2004 | 11/9/2004 | 11/9/2004 | A | NR |
Jim Storey
|
|
|
KIRBY nOTE: AROUND 9:00 AM IS POSSIBLE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pre con ok 11/9/2004 10:08:50 AM
|
(F) Reprint permit | | | 11/9/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/4/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/4/2004 | | DONE |
|
|
|
called ryan to let him know is permit and fees are ready to picked up
|
Inspection Record Card- Bld | | | 11/3/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/3/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/27/2004 | | 11/2/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/2/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/2/2004 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 6/18/2004 | | 11/2/2004 | | PASS |
Mike Phillips
|
|
|
11/2/2004 14:50:29 M_P - activity updated through activity BLDA022 from case BLD04-01349.
|
Routing - PLAN CHECK | 10/26/2004 | | 10/27/2004 | | |
|
|
|
Routing to Plumbing.
|
Routing - PLUMBING | 10/27/2004 | | 10/27/2004 | | PASS |
|
|
|
|
Routing - FIRE | 10/22/2004 | | 10/26/2004 | | PASS |
|
|
|
resubmittal acceptable
|
Routing - PLAN CHECK | 10/11/2004 | | 10/22/2004 | | |
|
|
|
Routing to fire!
|
Plan resubmittals received | | | 10/21/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Plan Review Comments from ELKHORN ENGINEERS,P.A. 2 Sets of COVER SHEET,L1.0,C1.0,GRD,UTL,A1.0,A2.0,A3.0,A4.0,A5.0A6,A7,A8 Taken to Mike Phillips...
|
Routing - PUBLIC WORKS | 10/5/2004 | | 10/11/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/13/2004 | | 10/5/2004 | | |
|
|
|
Routing to P. W.
|
Plan Review Completed(1st rev) | | | 8/13/2004 | | FAIL |
|
|
|
FAILED: Plan Check, Plumbing, Planning Public Works, Fire.
|
Routing - FIRE | 8/11/2004 | | 8/13/2004 | | FAIL |
Bill Alexander
|
|
|
1. This property does not comply with required fire apparatus access. Approved Fire Department vehicular access roads shall be provided to within 150'-0" of all exterior portions of this building with no dead ends over 150 feet unless an approved turnaround is provided. All gates, public or private streets, individual or common driveways, or dedicated emergency vehicle access lanes, etc., which are considered "fire department access" shall be: a minimum of 20'-0" width, 48'-0" outside turning radius and 28'-0" inside radius, with 13 feet 6 inches overhead clearance, paved and capable of supporting 70,000lbs. GVW and 24,000 lbs. per axle. Fire access distance may be modified somewhat, if alternative options are accepted, one of which is fire sprinkler protection. (IFC 503.1.1, 503.2.1, 102.7, 503.2.5, BCM 7-01-28 IFC 503.2.3, BMC 7-01-29 IFC 503.2.4)
2. This facility requires fire protection. Hydrants within allowable distances are located in along an access lane. The Architect of Record for the construction phase of this project shall provide as part of the Building Permit required documents, the hydrant water supply flow available and measured for the type of construction, (reference IFC B105.1). Water flow information is available by contacting United Water at: ###-####, and obtaining water supply information in certificate form. The required fire flow for this 6,820-ft/2 type V-B facility will be: 2,250 gpm. The fire flow will determine the number of hydrants required (reference IFC Table C105.1). The minimum 2 hydrants within distance appear to be provided. (IFC 105.4, C105.1)
|
Routing - PLAN CHECK | 7/27/2004 | | 8/11/2004 | | FAIL |
|
|
|
Plan review complete, sent correction report to architect requesting additional informaiton be submitted for further review prior to issuing permit.
|
Case Summary (BLD) | | | 8/11/2004 | | |
|
|
|
|
Routing - PLANNING Land Div | 7/23/2004 | | 7/26/2004 | | PASS |
|
|
|
Parcel was legal in Ada County prior to annexation.
|
Routing - PLUMBING | 7/15/2004 | | 7/23/2004 | | FAIL |
|
|
|
civil and mechanical need to design a pressure sewer system and resubmit.
|
Routing - PLANNING | 7/12/2004 | | 7/15/2004 | | PASS |
|
|
|
Approved per DRH03-00199 (Marty S)
Approved CUP03-00100 Mark P
|
Routing - PUBLIC WORKS | 6/24/2004 | | 7/12/2004 | | FAIL |
|
|
|
NEEDS REVISIONS
|
Routing - Erosion and Sediment | 7/12/2004 | | 7/12/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 6/18/2004 | | 6/24/2004 | | FAIL |
|
|
|
Need to provide deed to verify legal land division. Called Ryan McCaen on June 24, 2004 and informed him of what is required. He will call Lodge Logs.
|
Plans ACCEPTED BY PLAN TECH | | | 6/18/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/18/2004 | | |
|
|
|
|
Application received | | | 6/18/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/18/2004 | | |
|
|
|
|
Fee Review-notes | 6/18/2004 | 6/18/2004 | | | |
|
|
|
|