Case Summary (BLD) | | | 6/2/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/28/2006 | | |
|
|
|
|
Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/14/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///singed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 9/14/2005 | 9/14/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/9/2005 | 9/14/2005 | | DONE |
|
|
|
|
BLD-Final | 8/5/2005 | 8/8/2005 | 8/9/2005 | P | PASS |
Dave Hannah
|
|
|
jim--after 9:30 ???; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Permanent Occupancy | | 8/9/2005 | 8/9/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/9/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10681 issued 8-9-05 to Expressions in the Idaho Bldg., 1st floor.
|
FIRE-Final Inspection | 8/5/2005 | 8/8/2005 | 8/8/2005 | A | PASS |
Forrest France
|
|
|
Items on correction notice from 10/22/04 have been corrected. Life safety finaled.
|
BLD-Final | 10/25/2004 | 10/25/2004 | 10/25/2004 | P | FAIL |
Dave Hannah
|
|
|
needs fire life safty sign off 10/28/2004 1:53:50 PM
|
FIRE-Final Inspection | 10/22/2004 | 10/22/2004 | 10/25/2004 | P | FAIL |
Rick Jackson
|
|
|
Exit sign per plans; extinguisher; signa bove door to remain unlocked 10/25/2004 3:44:05 PM
|
BLD-Final | 10/20/2004 | 10/20/2004 | 10/20/2004 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Final | 10/19/2004 | 10/19/2004 | 10/19/2004 | P | CANC |
Dave Hannah
|
|
|
###-#### - jim needs fire L/F sign off 10/20/2004 12:57:58 PM
|
Issue PAID IN FULL permit | | | 7/13/2004 | | DONE |
|
|
|
|
OVERRIDE | | | 7/12/2004 | | |
|
|
|
|
OVERRIDE | | | 7/12/2004 | | |
|
|
|
|
OVERRIDE | | | 7/12/2004 | | |
|
|
|
|
Telephone call | | | 7/12/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan assigned to (DRS) | 6/21/2004 | | 7/12/2004 | | PASS |
Dan Stuart
|
|
|
7/12/2004 07:48:23 DRS - activity updated through activity BLDA022 from case BLD04-01353.
|
Routing - PLAN CHECK | 6/24/2004 | | 7/12/2004 | | PASS |
|
|
|
Approved as noted and attached. Much of the remodel work has been done. The work appears to be finish flooring and interior decorative beams below the existing glu-lam beams beteen interior support columns. A portion of the floor to include within the existing restroom is to be elevated 2" to match existing floor elevation of most of the space. Signage giving direction to the elevator and accessible restrooms existing on the second floor and in the basement are to be provided.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2004 | | PASS |
|
|
|
To permit desk for issue.
|
Inspection Record Card- Bld | | | 7/12/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/12/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/12/2004 | | DONE |
|
|
|
|
Routing - FIRE | 6/22/2004 | | 6/24/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 6/24/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/21/2004 | | 6/22/2004 | | PEND |
|
|
|
No resubmittals required. Routing to fire code analyst for review.
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2004 | | DONE |
|
|
|
Plan not dimensioned.
|
Application received | | | 6/18/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/18/2004 | | |
|
|
|
|
Fee Review-notes | 6/18/2004 | 6/18/2004 | | | |
|
|
|
|