Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-01373
StatusFinaled
Name KENT MORTENSEN
Site Address 4695 E TANOAK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2175 sq. ft. two story single family dwelling with a 882 sq. ft. attached three car garage, a 163 sq. ft. covered entry porch and a 135 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement list. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City and bracing scheduled by engineer. (1st floor 1252 sq. ft.)(2nd floor 923 sq. ft.) PC #305 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/2/20055/2/20055/2/2005PPART
DetailsJim Storey
david; Phone #: ###-#### Internet Inspection Request from: Letitia Mesatruss isues not done.
BLD-Final5/2/20055/2/20055/2/2005PPASS
DetailsJim Storey
CHANGE STATUS TO (ISS)  5/2/2005 DONE
Jim acidentally doc finaled changed back to Iss per Jim Storey///5/2/05 BAS
BLD-Conference10/18/200410/20/200410/20/2004APASS
DetailsJim Storey
Garage Door Code - 2222 enter; Phone #: ###-#### Internet Inspection Request from: Kent Mortensen
DOC - Permit Finaled10/20/200410/20/200410/20/2004APASS
DetailsJim Storey
Finaled by inspector at 10/20/2004 10:10:39 AM
BLD-Framing/Rough-in8/27/20048/30/20048/30/2004APART
DetailsLane Manuel
this is the one you that you had the wrong house we will be insulating monday.; Phone #: ###-#### Internet Inspection Request from: David Mortensen
gave c/n for 3 items. ok to insulate.
informed contr. that gas piping was only @ 9 psi, we'll recheck @ insulation insp. 8/30/2004 8:46:44 AM
BLD-Energy code compliance8/27/20048/30/20048/30/2004PPASS
DetailsTroy James
come late in the day thank you David ; Phone #: ###-#### Internet Inspection Request from: David Mortensen
BLD-Conference8/25/20048/26/20048/26/2004APASS
DetailsJim Storey
we will need a pressure test witness on the gas line if it has not been done. also Thanks David ; Phone #: ###-#### Internet Inspection Request from: David Mortensen
BLD-Conference8/26/20048/26/20048/26/2004ACANC
DetailsJim Storey
BLD-Framing/Rough-in8/23/20048/24/20048/24/2004PCANC
DetailsLane Manuel
Phone #: ###-#### Internet Inspection Request from: David Mortensen
BLD-Footing7/8/20047/8/20047/8/2004PPASS
DetailsJim Storey
Ryan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Footing7/7/20047/7/20047/7/2004PPART
DetailsTroy James
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip 7/7/2004 4:10:55 PM
Issue PAID IN FULL permit  6/28/2004 DONE
Plan assigned to (DJO)6/25/20046/25/20046/25/2004 DONE
DetailsDan Overy
Case Summary (BLD)  6/25/2004 DONE
Plan Review Report  6/25/2004 DONE
Inspection Record Card- Bld  6/25/2004 DONE
Permit Ready to Issue  6/25/2004 DONE
Telephone call  6/25/2004 DONE
PERMIT READY AND FEE DUE
Pending Assignment by DJO  6/25/2004 DONE
DetailsDan Overy
6/25/2004 15:15:48 DJO - activity updated through activity BLDA169 from case BLD04-01373.
Plans ACCEPTED BY PLAN CHECK  6/25/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/25/2004 DONE
Application received  6/22/2004  
Routing - PLANNING6/22/2004 6/22/2004 PASS
Routing - PUBLIC WORKS6/22/2004 6/22/2004 PASS
Routing - PLAN CHECK6/23/2004