Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01386
StatusFinaled
Name OAAS LANEY
Site Address 519 W FRONT ST
Project NameFRONT 5 BUILDING
Customer Number 
ePlanReviewNo
Description
(OAAS LANEY BLDG)(PHASE 2 - SHELL & CORE) Exterior and interior remodel to completely renovate an existing warehouse building for a new use as an office building per approved plans and DRH04-00104. The interior will have unfinished spaces for three future tenants and core area restrooms. No occupancy of tenant spaces allowed under this permit. Separate permits are required for any tenants that want to occupy the spaces. Main floor is 12,947 sq. ft. with 3,400 sq. ft. of mezzanines. Work to include miscellaneous demolition work, new exterior site work, new exterior stairs with handrails and guards, new exterior accessible ramp with handrails and guards, to construct new entry vestibules on north and south sides of building with glass and aluminum panel curtain walls, new exterior windows and doors, new exterior canopies, some new concrete footings/foundations, new exterior retaining walls, structural steel work, to construct new mezzanine areas, CMU wall infill at some locations, reinforcing existing roof framing to support new skylights and new HVAC rooftop units, new roofing system, some new exterior veneer work, new interior walls, new interior doors and windows, new core hallway and restrooms, new core accessible shower room, new phone/data room and fire riser room, four new interior stairways with handrails and cable guards, interior finish, new fire sprinkler system, new mechanical, new plumbing, and new electrical work. Special Inspections required for bolts in concrete, reinforcing steel, structural field welding, high strength bolting, structural masonry, epoxy/adhesive anchor installations, built-up light gauge steel members, structural steel frame, and excavation and back-filling. Building Division Manager approval concerning accessibility and area of mezzanines attached to plans. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. NOTE: This building is fully fire sprinklered. (PC#0399-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/20/20055/20/200512/9/2005 DONE
Second Notice has not been responded to.///Over a year old No final values
Telephone call  12/6/2005 DONE
Left voice message for Michael regardig final value differences with Subs///12/06/05 @ 10:35am BAS
Telephone call  11/28/2005 DONE
Left voice message for Shelly regarding subs differences in final values///11/28/05 @2:27pm BAS
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 12/17/20044/26/2005 DONE
BLD-Final3/17/20053/18/20053/18/2005APASS
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Letter of compliance  3/18/2005 DONE
Letter of Compliance issued 3-18-05.
Code Occupancy Approval3/17/20053/17/20053/17/2005PPASS
DetailsWm. Michael Meloy
Compliance met. 3/17/2005 4:24:54 PM
Code Occupancy Approval3/4/20053/4/20053/4/2005AFAIL
DetailsWm. Michael Meloy
Inspection noted landscaping in ground did not match plans that are on file. Correction notice left with request for an on-sight meeting to discuss the difference. 3/4/2005 11:18:05 AM
FIRE-Final Inspection1/28/20051/28/20051/28/2005PPASS
DetailsRick Jackson
Temporary occupancy  12/17/2004 DONE
Temp. Occ. Cert. # 5184 issued 12-17-04 to the OAAS Laney Bldg. Phase 2 shell & core.
BLD-Conference12/16/200412/16/200412/16/2004PCANC
DetailsDave Hannah
Greg; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Final12/16/200412/16/200412/16/2004PPART
DetailsDave Hannah
Greg; Phone #: ###-#### Internet Inspection Request from: Jan Rice correction notice on site south half completed this is the side with the t/i but still working on north side ok for a temp occ 12/16/2004 3:45:13 PM
FIRE-Final Inspection12/15/200412/15/200412/15/2004PPART
DetailsRick Jackson
gregg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need to complete west mezzanine and stair with sprinklers under stairs 12/15/2004 4:52:22 PM
BLD-Final12/15/200412/15/200412/15/2004PNR
DetailsDave Hannah
gregg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--peindin fire fn
Code Occupancy Approval Temp  12/15/2004 DONE
OK to bond for remaining Landscaping work.
Print Occupancy Form  12/15/2004 DONE
BLD-Conference12/7/200412/7/200412/7/2004PPART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore int stairs talked about closed risers mock up ok 12/8/2004 8:13:24 AM
FIRE-Conference12/7/200412/7/200412/7/2004PPART
DetailsRick Jackson
greg; Phone #: ###-#### Internet Inspection Request from: Barbara MooreMet with GC about extinguisher placement in shell and east TI space 12/7/2004 3:37:21 PM
BLD-Conference11/17/200411/18/200411/18/2004PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/17/2004 at 11:42:27 AM. Contact: ###-####.
(F) Reprint permit  11/15/2004 DONE
BLD-Foundation10/20/200410/21/200410/21/2004APART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore spec inspec will check erbar and test conc 10/22/2004 8:06:19 AM
BLD-Footing10/14/200410/15/200410/15/2004APART
DetailsJim Storey
craig; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles si to verify engineered fix for colm. info on site copy will be supplied for dave at next insp tue. 10/15/2004 9:15:45 AM
BLD-Foundation10/14/200410/15/200410/15/2004APASS
DetailsJim Storey
craig; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles south ramp and walls ok 10/15/2004 9:18:09 AM
BLD-Foundation10/11/200410/11/200410/11/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/11/2004 at 8:24:43 AM. Contact: ###-####. front walls need to move anchor bolts in column steel 10/11/2004 3:01:31 PM
BLD-Framing/Rough-in10/8/200410/8/200410/8/2004PPART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Moore steel stud walls ok to cover after other trades finish r/is also need engineer to check def in top track and size of box headers over windows in hall walls 10/8/2004 1:35:14 PM
BLD-Footing10/6/200410/7/200410/7/2004APART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to pour ftgs on southside for entry 10/7/2004 9:58:17 AM
BLD-Footing10/5/200410/6/200410/6/2004APART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie front entryway ftgs 10/6/2004 1:52:01 PM
(F) Reprint permit  10/1/2004 DONE
BLD-Footing9/22/20049/22/20049/22/2004PPART
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing9/20/20049/20/20049/20/2004PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/20/2004 at 8:20:16 AM. Contact: ###-####.
BLD-Footing9/16/20049/16/20049/16/2004PCANC
DetailsDave Hannah
greg ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs tobe checked by spec inspection 9/16/2004 2:11:27 PM
Issue PAID IN FULL permit  9/14/2004 DONE
Plan assigned to (JCB)6/29/2004 9/7/2004 PASS
9/7/2004 10:21:03 JCB - activity updated through activity BLDA022 from case BLD04-01386.
Routing - PLAN CHECK9/3/2004 9/7/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  9/7/2004 PASS
Inspection Record Card- Bld  9/7/2004 DONE
Telephone call  9/7/2004 DONE
left mess for stan at ###-#### that permit is ready
Permit Ready to Issue  9/7/2004  
Routing - FIRE9/1/2004 9/3/2004 PASS
Resubmittal acceptable
Plan resubmittals received  9/3/2004 DONE
Received transmittal with two copies of structural calculations taken to Jason B.
Routing - PLANNING8/31/2004 9/1/2004 PASS
Approve per resubmitted site plan and per conditions of DRH04-104.
Plan resubmittals received  9/1/2004 DONE
2 copies of resubmittal sheets L1.1 and A1.0 received and forwarded to Jason.
Routing - PLAN CHECK9/1/2004 9/1/2004 PEND
Pending Fire approval
Routing - PLAN CHECK8/12/2004 8/31/2004 FAIL
Called architect representative, Kirk Morris, concerning one sheet missing, another sheet provided not updated, and a few other issues to resolve or red-line on plans. Kirk said he would address and get back to me. Plans to route to Planning and Fire Dept. again for review.
Plan resubmittals received  8/31/2004 DONE
Received letter of transmittal with two sets of sheets A0.1,S2.1,S5.2, taken to Jason B.
Plan resubmittals received  8/27/2004 DONE
Received two sets of sheets A0.0,A0.1,C1.0,EC1.0,L1.1,A1.0,A1.1,A1.2,A1.3,A2.0,A2.1A2.2,A2.3,A2.4,A2.5,A3.0,A3.1,A4.0,A5.0,A5.1,A5.2,A6.0,A7.0,A7.1,A8.0,A8.1 taken to Jason B.
Plan resubmittals received  8/25/2004 DONE
Received letter of transmittal, letter for Sam Rogers with united water flow rate, three A1.0 sheets taken to Jason.
Plan resubmittals received  8/24/2004 DONE
Received letter of transmittal, response letters, copy of plan review report, two copies of structural calculations, two sets of sheets A0.1,A1.1,A1.2,A1.3,A2.2,A2.3,A2.5,A3.0,A3.1,A4.0,A5.0,A6.0,A7.0,S1.0,S1.1,S1.2,S2.0,S2.1,S3.0,S3.1,S4.0,S5.0,S5.1,S6.0,S7.0,E2.0L,E2.1L,E3.2,taken to Jason B.
Plan Review Completed(1st rev)  8/12/2004 FAIL
failed planning, public works, plan check and fire.
Routing - FIRE8/9/2004 8/12/2004 FAIL
lacks hydrant location and flow, sprinler flow, and extensive plan revisions required by IBC reviewer, which impact on IFC review. REview comments faxed to architect.
Routing - PLANNING Land Div8/5/2004 8/9/2004 PASS
Parcel B on ROS 5927. ROS02-00044 approved on 9/10/02.
Plan resubmittals requested  8/5/2004  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK7/15/2004 8/5/2004 FAIL
Plan review report sent and faxed to architect. Numerous items to address. Plan resubmittals and written response required for further review. Plans to route to Planning Land/Division and then to the Fire Department for review.
Routing - PLAN CHECK7/12/2004 7/15/2004  
Brian Murphy requested plans to review again. Plans routed to public works.
Routing - PUBLIC WORKS7/15/2004 7/15/2004 PASS
Brian Murphy requested plans for review again.
Plan resubmittals received  7/14/2004 DONE
Received letter of transmittal with three copies of sheets E2.0 taken to Jason.
Routing - PLUMBING7/12/2004 7/12/2004 PASS
provide trap primers at floor drains.
Routing - PLANNING7/7/2004 7/9/2004 FAIL
Applicant needs to submit parking agreement and plans to Design Review showing compliance with DRH04-00104 conditions of approval. Also need to make sure CCDC reviews. Contacted Ryan Drew, Cole+Poe Architects.
Plan resubmittals received  7/8/2004 DONE
Received 2 O & M Manuals Taken to Jason B.
Routing - Erosion and Sediment7/6/2004 7/7/2004 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/29/2004 7/6/2004 FAIL
NO GEOTECH AND CALCS; NO O&M PLAN: CONTACT BRIAN MURPHY ###-#### WITH REGARD TO FAILURE
Plan resubmittals received  7/6/2004 DONE
Received letter of transmittal with two copies of Drainage calculations, two copies of Geotechnical engineering report put with plan.
Telephone call  7/2/2004 DONE
I called Ryan and left him a message that we need to two O&M plans, two geo tech report, drainage calcs. Rita
Plans ACCEPTED BY PLAN TECH  6/24/2004 DONE
Called Ryan Drew and requested 3 extra civeil plans for Brian M.
Plan resubmittals received  6/24/2004 DONE
Received Transmittal Letter , & 3 extra civil fro Brian M. Added to plans...
Application received  6/23/2004  
Recd Pcfee & Taken To Pln CK  6/23/2004 DONE
Fee Review-notes6/23/20046/23/2004