Permit Information
Permit NumberBLD04-01406
StatusExpired
Name WILSON BROTHERS CONSTRUCTION
Site Address 2814 N TARTAN PL
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is the hillside area is for a 720s.f. addition to an existing 2806s.f. 1-story single family dwelling. R-1B setbacks ok per c.r. Separate electical, mechanical and ESC permits are required. All per the approved plans as marked and attached REScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Grading Inspection1/28/20051/28/20051/28/2005 DONE
Retaining wall construction in the rear of the house has been approved by the landscape architect.
BLD-Final11/17/200411/18/200411/18/2004APART
DetailsTony Young
tim; Phone #: ###-#### Note: Please notify 1/2 hr prior to inspectionInternet Inspection Request from: Cathy Chiles
inside ok,,, need hillside 11/18/2004 4:32:10 PM
BLD-Energy code compliance9/27/20049/28/20049/28/2004APASS
DetailsTroy James
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in9/23/20049/24/20049/24/2004AFAIL
DetailsDave Hannah
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles add studs uner east side of grider trusses and strapes across top plates between windows on east and west sides 9/24/2004 10:51:29 AM
BLD-Foundation8/10/20048/11/20048/11/2004APART
DetailsTony Young
mana; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing8/9/20048/9/20048/9/2004PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/9/2004 at 7:54:33 AM. Contact: ###-####.
BLD-Grading Inspection8/5/20048/5/20048/5/2004 PASS
Footing subgrade approved by the geotechnical engineer
Issue PAID IN FULL permit  7/6/2004 DONE
Case Summary (BLD)  7/2/2004  
Plan Review Report  7/2/2004  
PLANS/APPL TAKEN TO FRONT DESK  7/2/2004 DONE
Inspection Record Card- Bld  7/2/2004 DONE
Permit Ready to Issue  7/2/2004 DONE
Telephone call  7/2/2004 DONE
PERMIT READY AND FEE DUE
Plan assigned to (PEP)6/25/2004 7/2/2004 PASS
DetailsPerry Paine
7/2/2004 15:27:38 PEP - activity updated through activity BLDA022 from case BLD04-01406.
Plan Reviewer's activity  6/29/2004  
called builder t. wilson...hillside engineering requird for the foundation. 6/29/2004 9:00a.m.
Plan Reviewer's activity  6/29/2004  
6/28/2004 called desigher to go over REScheck and revised will be submitted. 4:45p.m. 6/28/20045
CHANGE STATUS TO (PND)  6/29/2004  
spoke with L Brown designer and T Wilson...need hillside required engineering. 6/29/2004 10:a.m.
Routing - Erosion and Sediment6/25/2004 6/28/2004 PASS
ESC plan approved with attached conditions.
Application received  6/25/2004  
Routing - PLANNING6/25/2004 6/25/2004 PASS
Routing - PUBLIC WORKS6/25/2004 6/25/2004 PASS
Routing - PUBLIC WORKS GRADING6/25/2004 6/25/2004 PASS
DetailsRita DeYoung
Routing - PLAN CHECK6/28/2004