Permit Information
Permit NumberBLD04-01424
StatusFinaled
Name WELLS FARGO
Site Address 3033 W ELDER ST
Project NameWELLS FARGO
Customer Number 
ePlanReviewNo
Description
(WELLS FARGO)(NEW MECHANICAL ROOM ADDITION)(BUILDING #2) To construct a new one story, 144 sq. ft. unconditioned mechanical room addition to an existing 116,397 sq. ft. three story building per approved plans and CZC04-00033. (Located on the west side of Building #2 in the open court area between Building #1 and Building #2.) New area total for Building #2 will now be 116,541 sq. ft. Work to include new reinforced concrete footings/foundation, new concrete slab, new noncombustible one-hour rated exterior walls and roof-ceiling assemblies, relocated metal louver, new EIFS system, new roof covering system, a pair of exterior doors, fire sprinkler work, mechanical work, and some electrical work. East exterior wall of addition is required to be one-hour rated with 30" minimum parapet based on location to the assumed property line shown on plans. Special Inspection is required for epoxy/adhesive anchor installations. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. NOTE: This building is fully fire sprinklered for area increase. (PC#0410-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/27/2008  
Third Notice BLD5/20/20055/20/20056/13/2005 DONE
Second Notice has not been responded to.
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice Sent 10/15/20044/26/2005 DONE
(F) Reprint permit  12/16/2004  
DOC - Permit Finaled10/15/200410/15/200410/15/2004APASS
DetailsJim Storey
Finaled by inspector at 10/15/2004 8:46:24 AM
BLD-Final10/14/200410/15/200410/15/2004APASS
DetailsJim Storey
Please call prior to inspection so he can meet ya there mike ###-#### l/c isued 10/15/2004 8:46:22 AM
BLD-Final10/13/200410/14/200410/14/2004PNH
DetailsJim Storey
Please call prior to inspection so he can meet ya there mike ###-#### left measage. 10/14/2004 4:17:51 PM
BLD-Framing/Rough-in9/20/20049/21/20049/21/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/20/2004 at 3:43:55 PM. Contact: ###-####. roof deck ok for cover. 9/21/2004 9:08:13 AM
BLD-Framing/Rough-in9/15/20049/16/20049/16/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/15/2004 at 8:14:16 AM. Contact: ###-####.rolled over out of time. ok pending others. 9/16/2004 11:31:05 AM
BLD-Framing/Rough-in9/15/20049/15/20049/15/2004PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/15/2004 at 8:14:16 AM. Contact: ###-####. rolled over to am out of time. 9/15/2004 4:49:32 PM
BLD-Framing/Rough-in9/7/20049/8/20049/8/2004ANR
DetailsJim Storey
randy lamott- off ###-#### -call 1st before insp for access
Issue PAID IN FULL permit  8/19/2004 DONE
Permit Ready to Issue  8/13/2004 DONE
Inspection Record Card- Bld  8/13/2004  
Telephone call  8/13/2004 DONE
talked to aaron randell at ###-#### that permit is ready
Routing - PLAN CHECK8/11/2004 8/12/2004 PASS
Permit and plans approved and taken to front desk.
Plan Reviewer's activity  8/12/2004  
Called structural engineer to clarify reinforcement at footing and foundation. Footing to have (2) #4 rebar continuous and the foundation wall to have (2) #4 rebar horizontal and #4 rebar 16" o.c. vertical. Will red-line on plan.
PLANS/APPL TAKEN TO FRONT DESK  8/12/2004 PASS
Plan assigned to (JCB)7/1/2004 8/12/2004 PASS
8/12/2004 10:56:24 JCB - activity updated through activity BLDA022 from case BLD04-01424.
Routing - FIRE8/5/2004 8/11/2004 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  8/11/2004 FAIL
Failed: Plan Check
Plan resubmittals received  8/10/2004 DONE
Received esponse letter, additional footing calculations, three copies of sheet A-2.0 taken to Jason.
Plan resubmittals requested  8/5/2004  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK7/9/2004 8/5/2004 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Department for review.
Plan resubmittals received  7/28/2004 DONE
Received Transmittal Letter, and 1Set of M3.0A Taken to Jason Blais
Routing - PLANNING7/2/2004 7/9/2004 PASS
Approved per CZC04-00124.
Routing - Erosion and Sediment7/2/2004 7/2/2004 PASS
ESC approved with attached conditions.
Routing - PUBLIC WORKS7/1/2004 7/1/2004 PASS
Plans ACCEPTED BY PLAN TECH  6/29/2004 DONE
No Mechanical or Envelope Compliance sheet... per Jason B. I requisted from Aaron Randell a drawing of the Mechanical equipment that is to be installed in the new Mechanical room ,and that the certificate of value $ 30,000.00 be broken down to add in the Fire sprinkler value , will also need Mechanical value .. 6-29-04 ......
Application received  6/25/2004  
Recd Pcfee & Taken To Pln CK  6/25/2004 DONE
Fee Review-notes6/25/20046/25/2004