Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01474
StatusFinaled
Name HERMAN HELMS
Site Address 5312 W MORRIS HILL
Project NameJOHN BROWNING FOUR PLEX
Customer Number 
ePlanReviewNo
Description
*John Browning 4-plex* To construct a new 4,530 sq.ft. two story, four unit apartment building. Each unit is three bedrooms and two baths @ 1139 sq.ft. each which includes a 81 sq.ft. covered patio. The first floor is 2,252 sq.ft and the second floor is 2278 sq.ft. All construction per the approved plans and attached comment list. MJP DRH 01-0235 Mod #2
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/8/20078/8/20078/8/2007 DONE
First Notice has not been responded to.
Second Notice BLD8/8/20078/8/20078/8/2007 DONE
First Notice has not been responded to.
First Notice 7/25/20078/8/2007 DONE
First Notice 7/25/20078/8/2007 DONE
Fee Review-notes7/2/20047/2/20048/8/2007 DONE
Permanent occupancy  7/25/2007 DONE
DOC - Permit Finaled  7/25/2007 DONE
Per Tom Arcoraci was only waiting on code enforcement sign off everything else ok to final///7/25/07 @10:37am BAS
Code Occupancy Approval  7/24/2007 PASS
DetailsDena Gambrel
Fence permit obtained. Final O.K.
BLD-Aging Inspection1/25/20061/25/20061/27/2006 CANC
DetailsTom Arcoraci
DOC - Permit Expired1/27/20061/27/20061/27/2006PPASS
DetailsTom Arcoraci
Case Summary (BLD)  1/12/2006  
BLD-Aging Inspection11/25/200511/25/200511/25/2005 NR
DetailsTom Arcoraci
BLD-Aging Inspection8/17/20058/17/20058/17/2005 FAIL
DetailsTom Arcoraci
needs cod sign off
Code Occupancy Approval6/17/20056/17/20056/17/2005PFAIL
DetailsDena Gambrel
Have left several messages with NEMEC Construction to secure bike rack and obtain a fence permit. No response from them.
Temporary occupancy  5/6/2005 DONE
Temp. Occ. Cert. # 5238 issued 5-6-05 to the John Browning four-plex.
Code Occupancy Approval Temp5/5/20055/5/20055/5/2005PFAIL
DetailsDena Gambrel
Temporary occupancy signed. Need bike rack and show that light by trash dumpster works. 5/5/2005 4:25:32 PM
BLD-Final4/6/20054/7/20054/7/2005APART
DetailsTom Arcoraci
nick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ 4/7/2005 10:38:42 AM
FIRE-Final Inspection4/6/20054/6/20054/6/2005PPASS
DetailsForrest France
fire life saety finaled
BLD-Final3/24/20053/25/20053/25/2005ACANC
DetailsTom Arcoraci
BLD-Final3/25/20053/25/20053/25/2005PCANC
DetailsTom Arcoraci
PubWorks Occupancy Approval3/23/20053/23/20053/25/2005 DONE
Drainage project complete, signed permanent occupancy 3/23/05. R.Rokovitz
FIRE-Final Inspection3/24/20053/24/20053/24/2005PFAIL
DetailsTroy Cobbley
Only thing corrected was door adjustments 3/24/2005 4:02:30 PM
BLD-Final3/24/20053/24/20053/24/2005PNR
DetailsTom Arcoraci
Nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice
FIRE-Final Inspection3/22/20053/23/20053/23/2005AFAIL
DetailsTroy Cobbley
nick ; Phone #: ###-#### Paint curbing as discussed. Provide approved plans. Adjust door on 101 & 102. Lower fire extinguishers. Fix smoke detector in 207. Provide additional address numbers on building. 3/23/2005 11:10:40 AM
FIRE-Final Inspection3/21/20053/22/20053/22/2005ACANC
DetailsTroy Cobbley
nick; Phone #: ###-#### To be rescheduled per contractor 3/22/2005 1:00:30 PM
BLD-Energy code compliance1/14/20051/18/20051/18/2005APASS
DetailsTom Arcoraci
Nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Energy code compliance1/18/20051/18/20051/18/2005PPASS
DetailsTom Arcoraci
nick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance1/13/20051/14/20051/14/2005ANR
DetailsTom Arcoraci
nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in1/11/20051/13/20051/13/2005APART
DetailsTom Arcoraci
Nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to insulate pending mech ok 1/13/2005 9:26:16 AM
BLD-Framing/Rough-in1/13/20051/13/20051/13/2005PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in1/10/20051/10/20051/10/2005PNR
DetailsTom Arcoraci
needs heating 1/10/2005 1:34:03 PM
BLD-Conference12/7/200412/7/200412/7/2004APASS
DetailsTom Arcoraci
BLD-Footing11/22/200411/23/200411/23/2004APASS
DetailsTroy James
nick Note: approx 10:30 am; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  10/12/2004 DONE
Permit Ready to Issue  10/11/2004 DONE
Inspection Record Card- Bld  10/11/2004 DONE
Print Occupancy Form  10/11/2004  
Telephone call  10/11/2004 DONE
Spoke with Joh and told him that permit is ready & fees and that we need ACHD info///10/11/04 1:55pm BAS
Routing - PLAN CHECK10/6/2004 10/8/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/8/2004 DONE
Print Pending Permit.LaserJet4  10/8/2004 DONE
Case Summary (BLD)  10/8/2004 DONE
Plan assigned to (M_P)7/6/2004 10/8/2004 PASS
10/8/2004 10:12:38 M_P - activity updated through activity BLDA022 from case BLD04-01474.
Routing - FIRE10/1/2004 10/6/2004 PASS
resubmittal acceptable.
Routing - PLAN CHECK9/30/2004 10/1/2004  
Routing to fire.
Plan resubmittals received  10/1/2004  
Received Transmittal Letter, 1 United Water Sheet, 1 Copy of sheet C1.0 & 1 Architect/Engineer of record declaration form. Taken to Mike Phillips..
Routing - PLAN CHECK9/30/2004 9/30/2004  
Routing - PLUMBING9/29/2004 9/30/2004 PASS
1" cold water to each unit, 1" to water heater, 2 fixture units on 1/2". vent 1st floor toilets.
Routing - PLAN CHECK9/29/2004 9/29/2004  
plans returned to plan check to await response on Fire Comments
Routing to Plumbing.
Routing - FIRE9/27/2004 9/29/2004 FAIL
No responses to Fire review of 7/23/04; contacted original architect, Cole, who says they are no longer involved. Contacted the "design professional, Richard George, who stamped the plans on 8/31/04 but he says he is also no longer involved. No contact info on application for owner. Contacted the only phone number on application is for contractor, Nick Cook, who says he is not directly involved with the design. He agreed to advise John Browning to review Fire comments on our website and provide required response.
Routing - PLAN CHECK9/23/2004 9/27/2004 PEND
Waiting for others to approve prior to issuing permit.
Plan resubmittals received  9/27/2004 DONE
Response to plumbing review and two sets of sheet 8 taken to Mike P.
Routing - PLAN CHECK9/21/2004 9/23/2004  
Routing to land division
Routing - PLANNING Land Div9/23/2004 9/23/2004 PASS
Approved. Parcel created on February 6, 1947.
Routing - PLUMBING9/23/2004 9/23/2004 FAIL
resent review to john browning
Routing - PLANNING9/21/2004 9/21/2004 PASS
Approved per DRH01-225 Mod. #2.
Routing - Erosion and Sediment9/21/2004 9/21/2004 PASS
Need to sign plans only.
Routing - PUBLIC WORKS9/16/2004 9/21/2004 PASS
When finished reviewing rout to ESC.
Plan resubmittals received  9/20/2004  
Received 2 Copys of # 4 Taken to Mike Phillips....
Routing - PLAN CHECK9/13/2004 9/16/2004  
Routing to Public Works and ESC
Plan resubmittals received  9/16/2004 DONE
Received letter of transmittal with 5 copies of sheet C1.0 taken to Mike P.
Routing - PLAN CHECK9/13/2004 9/13/2004  
Until design has been approved by Marty Santoyo
Hold has been released . Marty has approved the exterior elevations.
Routing - PLANNING9/7/2004 9/13/2004 FAIL
DetailsMartin Santoyo
Plans, exterior elevations do not comply with approved design on file as per DRH01-225 Mod. #2.
Plan resubmittals received  9/8/2004 DONE
Received 1 Set with 2 sheets of # 10 Taken to Mike Phillips...
Routing - PLUMBING9/7/2004 9/8/2004 FAIL
2 corrections on plumbing plan plus more info required. Please re-submit.
Routing - PUBLIC WORKS9/3/2004 9/7/2004 FAIL
Drainage plan revisions not done from 7/13/2004 rejection per Brian Murphy
Routing - PLAN CHECK9/2/2004 9/3/2004  
Routing to P. W.
Routing - PLAN CHECK7/23/2004 9/2/2004 FAIL
Faxed to Nick at Nemec office a form for designating responsible person in charge. Waiting for this form to be returned and waiting for Energy Code Compliance Statement reflecting REScheck not Watson on the plans.
Plan resubmittals received  9/1/2004 DONE
Received Transmittal Letter, 3 O & M manuals, 3 Sets of C1.0 , ESC, 2 Sets of 1,2,3,4,5,6,7,8,9, C1.0,ESC & 2 ESC manuals. Taken to Mike Phillips....
Routing - FIRE7/21/2004 7/23/2004 FAIL
no hydrant location or flow info provided. Review faxed to Tamura.
Plan Review Completed(1st rev)  7/23/2004 FAIL
failed Plan check, plumbing, planning, planning land div, public works and fire.
Routing - PLUMBING7/15/2004 7/16/2004 FAIL
please provide a plumbing plan showing the above listed items.
Routing - PLANNING7/14/2004 7/15/2004 FAIL
Plans do not comply with DRH01-225 Modification #2.
Routing - PUBLIC WORKS7/13/2004 7/14/2004 FAIL
requires drainage plans. Contact Brian Murphy at ###-####
Routing - Erosion and Sediment7/14/2004 7/14/2004 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK7/9/2004 7/12/2004 FAIL
Plan review completed sent correction report to designer requesting additional information be submitted for further review prior to issuing permit.
Routing - PLANNING Land Div7/6/2004 7/7/2004 FAIL
Need proof of legal land division. Called Nick Cook at ###-#### on July 7, 2004. He will have John Browning call me.
Plan routing begun/NEW & ADDTN  7/6/2004 DONE
Plans ACCEPTED BY PLAN TECH  7/6/2004 DONE
Application received  7/2/2004  
Recd Pcfee & Taken To Pln CK  7/2/2004 DONE