BLD-Final | 12/22/2004 | 12/23/2004 | 12/23/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/22/2004 at 7:20:56 PM. Contact: ###-####.
|
DOC - Permit Finaled | 12/23/2004 | 12/23/2004 | 12/23/2004 | A | PASS |
Troy James
|
|
|
Finaled by inspector at 12/23/2004 11:27:16 AM
|
BLD-Final | 12/22/2004 | 12/22/2004 | 12/22/2004 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/22/2004 at 11:09:17 AM. Contact: ###-####. max 4 inch spacing on gaurdraliings. 12/22/2004 4:48:56 PM
|
BLD-Grading Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 10/12/2004 | 10/13/2004 | 10/13/2004 | A | PASS |
Troy James
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
|
BLD-Energy code compliance | 10/12/2004 | 10/12/2004 | 10/12/2004 | P | FAIL |
Troy James
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Not ready for insulation inspection, framing corrections ok. 10/12/2004 1:41:38 PM
|
BLD-Framing/Rough-in | 10/7/2004 | 10/8/2004 | 10/8/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/7/2004 at 2:52:25 PM. Contact: ###-####. c/n posted 10/8/2004 3:29:21 PM
|
BLD-Concrete | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | PASS |
Troy James
|
|
|
stem wall inspection please///ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Grading Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 8/2/2004 | 8/2/2004 | 8/2/2004 | P | PART |
Troy James
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip informed contractor footings need to be 12" thick per plans. 8/2/2004 2:01:40 PM
|
PubWorks Subgrade Approval | 7/9/2004 | 7/9/2004 | 8/2/2004 | | DONE |
|
|
|
Letter from applicants geotechnical engineer indicating footing subgrade is acceptable must be approved by Public Works prior to scheduling footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 7/28/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/28/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/21/2004 | | DONE |
|
|
|
7/21/2004 Scott Cam (matrix design) brought revisions in this morning. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 7/21/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/21/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/21/2004 | | |
|
|
|
|
Override - Activity Holds | | | 7/21/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 7/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/21/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plans ACCEPTED BY PLAN CHECK | | | 7/19/2004 | | |
|
|
|
|
Plan Reviewer's activity | | | 7/19/2004 | | |
|
|
|
awaiting resubmittals for rescheck, revised foundation for overspan floor joist, deck details, brg for girder,furnace compartment header and pocket door header.
|
Case Summary (BLD) | | | 7/19/2004 | | |
|
|
|
|
Plan Review Report | | | 7/19/2004 | | |
|
|
|
|
Routing - Erosion and Sediment | 7/13/2004 | | 7/13/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 7/13/2004 | | 7/13/2004 | | DONE |
|
|
|
No fire sprinklers required (Northridge #5 sub)
|
Routing - PLANNING | 7/9/2004 | | 7/9/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/9/2004 | | 7/9/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 7/6/2004 | | 7/9/2004 | | DONE |
|
|
|
Approved as category 3
|
Application received | | | 7/6/2004 | | |
|
|
|
|
Pending Assignment by DJO | 7/6/2004 | | | | |
|
|
|
|
Routing - PLAN CHECK | 7/14/2004 | | | | |
|
|
|
|