BLD-Conference | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | PASS |
Tony Young
|
|
|
Tony could you drive by this house and see if the work was done? Terry R. would like to know, so he can close out his file. Thanks Rita no work has been done,, for sale sign is up,, doc expired to close out on my side,, 415
|
DOC - Permit Expired | 11/8/2006 | 11/8/2006 | 11/8/2006 | P | PASS |
Tony Young
|
|
|
Tony could you drive by this house and see if the work was done? Terry R. would like to know, so he can close out his file. Thanks Rita
|
Override - Activity Holds | | | 7/26/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 7/26/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/26/2004 | | DONE |
|
|
|
|
OVERRIDE | | | 7/22/2004 | | |
|
|
|
|
OVERRIDE | | | 7/22/2004 | | |
|
|
|
|
OVERRIDE | | | 7/22/2004 | | |
|
|
|
|
OVERRIDE | | | 7/22/2004 | | |
|
|
|
|
Override - Activity Holds | | | 7/22/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 7/22/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/22/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/22/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 7/22/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 7/22/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 7/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2004 | | DONE |
|
|
|
Left message for Joan that permit is ready & fees///7/22/04 2:15pm BAM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2004 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 7/8/2004 | | 7/21/2004 | | PASS |
|
|
|
7/21/2004 15:23:20 PEP - activity updated through activity BLDA022 from case BLD04-01484.
|
Case Summary (BLD) | | | 7/13/2004 | | |
|
|
|
|
Plan Review Report | | | 7/13/2004 | | |
|
|
|
|
Plan Review Report | | | 7/13/2004 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 7/13/2004 | | |
|
|
|
waiting for detail of ceiling insulation at the garage floor to bedroom ceiling.
|
Routing - Erosion and Sediment | 7/8/2004 | | 7/9/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Override - Parcel Holds | | | 7/8/2004 | | |
|
|
|
|
Routing - PLANNING | 7/8/2004 | | 7/8/2004 | | PASS |
|
|
|
O.K. w/ setbacks per plat.
|
Routing - PUBLIC WORKS GRADING | 7/6/2004 | | 7/8/2004 | | DONE |
|
|
|
Approved as Category 3 with conditions of approval in letter attached to the plans and this case.
|
Application received | | | 7/6/2004 | | |
|
|
|
|
PubWorks Subgrade Approval | 7/8/2004 | 7/8/2004 | | | DONE |
|
|
|
Letter from applicants geotechnical engineer indicating footing subgrade is acceptable must be approved by Public Works prior to scheduling footing inspection. Call Terry Records at ###-####
|
Routing - PLAN CHECK | 7/9/2004 | | | | |
|
|
|
|