BLD-Final | 6/29/2005 | 6/29/2005 | 6/30/2005 | P | PASS |
Dave Hannah
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 6/29/2005 | 6/29/2005 | 6/29/2005 | | BOND |
|
|
|
The grading has been completed in substantial compliance with the approved plan. However, revegetation of the slopes has not been completed. For this the engineer has recommended a
$500.00 bond. The grading can be conditionally approved upon receipt of the $500.00 bond.
|
BLD-Energy code compliance | 2/16/2005 | 2/17/2005 | 2/17/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/16/2005 at 12:03:40 PM. Contact: ###-####.
|
BLD-Wall cover | 2/14/2005 | 2/14/2005 | 2/14/2005 | P | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 9:26:24 AM. Contact: ###-####.
|
BLD-Energy code compliance | 2/14/2005 | 2/14/2005 | 2/14/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 9:26:57 AM. Contact: ###-####. incorrect R-value as required per energy calcs, need report from foam insulation spray at ceiling line 2/14/2005 2:40:52 PM
|
BLD-Framing/Rough-in | 2/14/2005 | 2/14/2005 | 2/14/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 9:27:24 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/8/2005 | 2/9/2005 | 2/9/2005 | P | PASS |
Troy James
|
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 2/4/2005 | 2/7/2005 | 2/7/2005 | P | FAIL |
Lane Manuel
|
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Jan Rice
c/n posted on window next to front door.
2/7/2005 4:18:56 PM
|
Permit Ready to Issue | | | 2/4/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/2/2005 | | DONE |
|
|
|
|
OVERRIDE | | | 2/1/2005 | | |
|
|
|
|
Telephone call | | | 2/1/2005 | | |
|
|
|
called Todd ###-#### left a msg on his voice mail permits is ready fees are $262.41 JRR 8:59AM
|
Inspection Record Card- Bld | | | 2/1/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2005 | | DONE |
|
|
|
|
BLD-Conference | 12/29/2004 | 12/29/2004 | 12/29/2004 | P | PART |
Troy James
|
|
|
setbacks for marlene, verified setbacks are at 10' from house with 4' overhang projecting into property line, adjacent neighbor landscaping projecting 3' over property line. 12/29/2004 3:52:13 PM
|
BLD-Foundation | 10/11/2004 | 10/12/2004 | 10/12/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 12:29:36 PM. Contact: ###-####.
|
BLD-Footing | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Troy James
|
|
|
jed--after 3:30??? ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Foundation | 9/24/2004 | 9/27/2004 | 9/27/2004 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 3:07:41 PM. Contact: ###-####. North wall and garage door front ok to place concrete. 9/27/2004 10:28:36 AM
|
BLD-Footing | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/21/2004 at 11:37:28 AM. Contact: ###-####.
|
BLD-Footing | 9/17/2004 | 9/20/2004 | 9/20/2004 | A | NR |
Dave Hannah
|
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 9/17/2004 | 9/17/2004 | 9/17/2004 | P | CANC |
Troy James
|
|
|
|
BLD-Grading Inspection | 9/17/2004 | 9/17/2004 | 9/17/2004 | | DONE |
|
|
|
Footing subgrade for the garage and west pool wall have been approved by the geotechnical engineer
|
PubWorks Subgrade Approval | 7/9/2004 | 7/9/2004 | 9/17/2004 | | DONE |
|
|
|
Letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling the footing inspection. Call Terry Records ###-####
|
Override - Activity Holds | | | 7/22/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 7/22/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 7/22/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/22/2004 | | |
|
|
|
|
Telephone call | | | 7/22/2004 | | DONE |
|
|
|
Spoke with Todd and told him that permi tis ready & fees///7/22/04 11:30am BAM
|
Override - Activity Holds | | | 7/22/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/22/2004 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 7/22/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 7/21/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/15/2004 | | 7/15/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 7/14/2004 | | 7/14/2004 | | FAIL |
|
|
|
Only one copy of esc plan, rp on plan not the same on application ??? Informed contractor.
|
Routing - PLANNING | 7/9/2004 | | 7/13/2004 | | PASS |
|
|
|
Routed to MAP per CFH04-00014. Category I Hillside. CER 2:00 p.m. on 7/9/04
|
Routing - PUBLIC WORKS GRADING | 7/6/2004 | | 7/9/2004 | | DONE |
|
|
|
Approved as Category 1 by CFH04-00014 with conditions of approval in letter attached to the plans
|
Application received | | | 7/6/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 7/15/2004 | | | | |
|
|
|
|