Permit Information
Permit NumberBLD04-01496
StatusFinaled
Name BOISE CITY AIRPORT
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-TEMP CHECKPOINT
Customer Number 
ePlanReviewNo
Description
BOISE AIR TERMINAL - TEMPORARY SECURITY CHECKPOINT - To enclose the north portion of the west exterior wall where the temporary elevated walkway is being demolished and removed (under a separate permit), and to make all required electrical, fire alarm and fire sprinkler upgrades to allow the building to be occupied on a permanent basis on the second floor and open underneath per approved plans. This 6,900 square foot area is being converted from a temporary security checkpoint to a permanent office building. This building will be connected to existing Concourse "B" by an existing noncombustible elevated pedestrian walkway. The pedestrian walkway is not a required exit. This building is fully fire sprinklered within and below the occupied spaces. The sprinklers are used for one-hour fire-resistive substitution. This elevated office building is a separate building and not part of the airport terminal building. All construction per the approved plans on file. #04-424/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/26/20054/27/20054/27/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/26/2005 at 11:44:17 AM. Contact: ###-#### final ok.
BLD-Final4/27/20054/27/20054/27/2005 DONE
Perm. Occ. Cert. # 10559 issued 4-27-05 to the Boise City Airport.
Permanent Occupancy 4/27/20054/27/2005 DONE
Details
DOC - Permit Finaled  4/27/2005 DONE
FIRE-Final Inspection11/12/200411/12/200411/12/2004PPASS
DetailsRick Jackson
Tom; Phone #: ###-#### Internet Inspection Request from: Jan Rice Sprinklers installed underneath walkway under the new terminal permit; fire alarms okay 11/12/2004 3:37:04 PM
Issue PAID IN FULL permit  8/25/2004 DONE
Print Occupancy Form  7/22/2004 DONE
Inspection Record Card- Bld  7/22/2004 DONE
Permit Ready to Issue  7/22/2004 DONE
Telephone call  7/22/2004 DONE
left a message for Matt -- permit is ready.
Routing - PLAN CHECK7/21/2004 7/21/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/21/2004 DONE
Plan assigned to (JCM)7/19/2004 7/21/2004 PASS
7/21/2004 15:50:18 JCM - activity updated through activity BLDA022 from case BLD04-01496.
Routing - FIRE7/19/2004 7/20/2004 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  7/20/2004 DONE
Routing - PLAN CHECK7/9/2004 7/19/2004 PASS
Plan Reviewer's activity  7/19/2004 PASS
Plans reviewed and approved as drawn. JCM
Plan assigned to (CJW)7/9/2004 7/16/2004 DEFR
< $25,000 Drawings received July 6, 2004. 2 weeks (July 20). Gave the project to John Menard.
Plans ACCEPTED BY PLAN TECH  7/8/2004 DONE
Application received  7/6/2004  
Fee Review-notes7/6/20047/6/2004