BLD-Final | 11/10/2004 | 11/12/2004 | 11/12/2004 | P | PASS |
Lane Manuel
|
|
|
Gary;- call for access phone second ###-#### - Phone First ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
DOC - Permit Finaled | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | PASS |
Lane Manuel
|
|
|
Finaled by inspector at 11/12/2004 2:00:03 PM
|
BLD-Framing/Rough-in | 9/21/2004 | 9/21/2004 | 9/21/2004 | P | PASS |
Lane Manuel
|
|
|
in garage wire penetration of party wall-gary ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
c/n item ok 9/21/2004 3:55:46 PM
|
BLD-Energy code compliance | 9/14/2004 | 9/16/2004 | 9/16/2004 | A | PART |
Lane Manuel
|
|
|
gary//please call and inform results of inspection; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
r-13 walls
CK: crawl_______________
Blown attic________________ 9/16/2004 10:30:02 AM
|
BLD-Framing/Rough-in | 9/13/2004 | 9/14/2004 | 9/14/2004 | P | PASS |
Lane Manuel
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
r-framing ok. note: penetration of trusses into firewall OK per George Slane via the approved plan details allowing for penetration.
recheck elec. feeder protection @ insul. insp. 9/14/2004 3:57:11 PM
|
BLD-Framing/Rough-in | 8/27/2004 | 8/30/2004 | 8/30/2004 | A | FAIL |
Lane Manuel
|
|
|
fausto; Phone #: ###-#### Internet Inspection Request from: Annette Moore
left c/n. designer to address gable truss penetration @ firewall w/ plan review dept. 8/30/2004 10:55:22 AM
|
Inspection Record Card- Bld | | | 8/24/2004 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/23/2004 | 8/23/2004 | 8/23/2004 | P | PART |
Lane Manuel
|
|
|
for fire wall- fausto; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
interior faces of common firewalls ok w/ 5/8" type x drywall. Contr. to call for gable trusses once rocked. 8/23/2004 1:38:46 PM
|
BLD-Foundation | 8/10/2004 | 8/10/2004 | 8/10/2004 | P | PASS |
Lane Manuel
|
|
|
ROBERT; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 8/9/2004 | 8/9/2004 | 8/9/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 8/9/2004 at 7:03:46 AM. Contact: ###-####.
footings ok. to recall for stemwalls. 8/9/2004 10:46:02 AM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2004 | | DONE |
|
|
|
Spoke with Shannon and told her that permit is ready & fees///7/26/04 11:40am BAM
|
Permit Ready to Issue | | | 7/26/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/26/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/21/2004 | | DONE |
|
|
|
Builder resubmitted new plans to be able to construct duplex to future townhouse specs. Three hours spent on reviewing new plans.
|
CHANGE STATUS TO (PND) | | | 7/14/2004 | | DONE |
|
|
|
per steve monroe builder re-submitted for seperation wall to meet townhouse requirements///7/14/04 BAM
|
Routing - PLAN CHECK | 7/8/2004 | | 7/13/2004 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/8/2004 | | 7/13/2004 | | PASS |
|
|
|
7/13/2004 10:24:24 SAM - activity updated through activity BLDA022 from case BLD04-01505.
|
Case Summary (BLD) | | | 7/13/2004 | | |
|
|
|
|
Plan Review Report | | | 7/13/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/13/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2004 | | DONE |
|
|
|
PERMIT READY AND FEE DUE
|
Plan Reviewer's activity | | | 7/12/2004 | | DONE |
|
|
|
7/12/04 After calling the builder, designer and finally leaving a message for the draftsman to call me, plans are on hold. I have question on the truss bearing, balloon framed wall and REScheck.
|
Pending Assignment by DJO | 7/7/2004 | | 7/8/2004 | | DONE |
|
|
|
7/8/2004 15:45:17 SAM - activity updated through activity BLDA183 from case BLD04-01505.
|
Routing - PLANNING | 7/7/2004 | | 7/8/2004 | | PASS |
|
|
|
Duplex in an R-1C zone; Okay per plat note designation. Driveway needs to be separated from adjacent property line w/ a min. of 5' landscape area.
|
Routing - PUBLIC WORKS | 7/8/2004 | | 7/8/2004 | | PASS |
|
|
|
WESTBOISE SEWER DISTRICT
|
Application received | | | 7/7/2004 | | |
|
|
|
|