Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/16/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/21/2005 | 11/21/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/8/2005 | 11/21/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/8/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10793 issued 11-7-05 to Video Eye Corporation.
|
FIRE-Final Inspection | 11/4/2005 | 11/7/2005 | 11/7/2005 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Final | 11/4/2005 | 11/7/2005 | 11/7/2005 | A | PASS |
Mike Jordan
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok for perm occ
|
Permanent Occupancy | | 11/7/2005 | 11/7/2005 | | DONE |
|
|
|
|
BLD-Final | 10/18/2005 | 10/19/2005 | 10/19/2005 | A | NR |
Mike Jordan
|
|
|
Doug, ###-#### - call 1st so he can meet you there : ). Has issues on special insp. that need resolved. Also needs to repair door hardware.
|
FIRE-Final Inspection | 10/18/2005 | 10/19/2005 | 10/19/2005 | A | FAIL |
Troy Cobbley
|
|
|
Need to install the indicators for the keyed locks on the balconies and remove the deadbolt on the 2nd floor storage room
|
Telephone call | | | 10/18/2005 | | DONE |
|
|
|
Called & talked w/contractor about outstanding issues. Said he would call for final inspections.
|
Temporary occupancy | | | 7/20/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5258 issued 7-20-05 to the Video Eye Corp.
|
FIRE-Final Inspection | 7/19/2005 | 7/19/2005 | 7/19/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Renn Ross's permission until all door hardware has been installed and approved and the one hour room for the fire sprinkler riser is complete. Dead bolts need to be removed from the three storage rooms and indicators need to be installed on the balcony doors.
|
FIRE-Final Inspection | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | CANC |
Troy Cobbley
|
|
|
Request for temp; ###-####
|
FIRE-Final Inspection | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | FAIL |
Troy Cobbley
|
|
|
doug; Phone #: ###-#### Provide exit discharge lighting and approved hardware at the first floor southeast exterior door or remove hardware and exit sign. Provide fire extinguishers as marked in red on drawing sheets A1 and A2. Provide/repair exit signs and emergency lights as marked on sheets E1 and E2. Provide missing door hardware on all doors.
|
BLD-Wall cover | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 3:06:15 PM. Contact: ###-####.
Interior layer of drywall at elevator shaft ok 2/25/2005 9:09:08 AM
|
BLD-Framing/Rough-in | 1/4/2005 | 1/5/2005 | 1/5/2005 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 4:04:58 PM. Contact: ###-####.
interior walls @ TI ok to cover. 1/5/2005 10:11:32 AM
|
BLD-Energy code compliance | 12/8/2004 | 12/9/2004 | 12/9/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 5:03:38 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 12:58:37 PM. Contact: ###-####.
ok to cover interior walls.
Contractor to leave all "hard" ceiling areas uncovered for future sprinkler insp. 12/7/2004 11:55:47 AM
|
Issue PAID IN FULL permit | | | 11/23/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2004 | | DONE |
|
|
|
PLAN MODIFICATION FINISHED
|
Telephone call | | | 11/15/2004 | | DONE |
|
|
|
talked to cornel larson ###-#### - his permit and fees are ready to be picked up
|
Routing - FIRE | 11/8/2004 | | 11/12/2004 | | PASS |
|
|
|
Plan Mod.
|
Routing - PLAN CHECK | 10/18/2004 | | 11/8/2004 | | PEND |
|
|
|
Ron Hill approved modification and routed plans to the fire department Bill Alexander on 11/08/04. Permit pending fire departments approval.
|
Case Summary (BLD) | | | 10/29/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/20/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Sets of Sheets A-1,A-2,A-3.. Taken to Ron Hill...
|
Routing - PLUMBING | 10/15/2004 | | 10/18/2004 | | PASS |
|
|
|
Plan Mod. per plans and 2003 upc
|
Plan Modification Accepted | | | 10/15/2004 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 10/14/2004 | | DONE |
|
|
|
Plan Mod.
|
Print Occupancy Form | | | 7/22/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/22/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2004 | | DONE |
|
|
|
left a message for Cornell -- permit is ready.
|
Plan Review Completed(1st rev) | | | 7/21/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/21/2004 | | 7/21/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2004 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 7/9/2004 | | 7/21/2004 | | PASS |
|
|
|
7/21/2004 14:06:04 RMH - activity updated through activity BLDA022 from case BLD04-01513.
|
Routing - FIRE | 7/19/2004 | | 7/21/2004 | | DONE |
Bill Alexander
|
|
|
|
Case Summary (BLD) | | | 7/19/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/13/2004 | | 7/19/2004 | | PEND |
|
|
|
No corrections required by building department review, Routed plans to the fire department for review on 7/19/04. Permit pending fire departments review.
|
Routing - PUBLIC WORKS | 7/12/2004 | | 7/13/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2004 | | DONE |
|
|
|
No Mechanical or Envelope Compliance Sheet...
|
Application received | | | 7/7/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/7/2004 | | |
|
|
|
|
Fee Review-notes | 7/7/2004 | 7/7/2004 | | | |
|
|
|
|