(VIDEO EYE)(SUITES 100 & 200) To construct a tenant space occupying spaces on the first and second floors consisting of 11,249 sq.ft. of warehouse & production area on the 1st floor, and 7,513 sq.ft. of office on the 2nd floor per approved plans. Work to include, construction of accessible restroom on the first floor, construction of interior partitions, installation of suspended ceiling system and lighting, connecting new duct work to existing Hvac system, related interior finshes, this building is fully fire sprinkered any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (pc#427-04) rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/16/2005 DONE
Second Notice has not been responded to.
Second Notice BLD11/21/200511/21/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 11/8/200511/21/2005 DONE
Permanent occupancy  11/8/2005 DONE
Perm. Occ. Cert. # 10793 issued 11-7-05 to Video Eye Corporation.
FIRE-Final Inspection11/4/200511/7/200511/7/2005APASS
DetailsTroy Cobbley
life safety finaled
BLD-Final11/4/200511/7/200511/7/2005APASS
DetailsMike Jordan
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok for perm occ
Permanent Occupancy 11/7/200511/7/2005 DONE
Details
BLD-Final10/18/200510/19/200510/19/2005ANR
DetailsMike Jordan
Doug, ###-#### - call 1st so he can meet you there : ). Has issues on special insp. that need resolved. Also needs to repair door hardware.
FIRE-Final Inspection10/18/200510/19/200510/19/2005AFAIL
DetailsTroy Cobbley
Need to install the indicators for the keyed locks on the balconies and remove the deadbolt on the 2nd floor storage room
Telephone call  10/18/2005 DONE
Called & talked w/contractor about outstanding issues. Said he would call for final inspections.
Temporary occupancy  7/20/2005 DONE
Temp. Occ. Cert. # 5258 issued 7-20-05 to the Video Eye Corp.
FIRE-Final Inspection7/19/20057/19/20057/19/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Renn Ross's permission until all door hardware has been installed and approved and the one hour room for the fire sprinkler riser is complete. Dead bolts need to be removed from the three storage rooms and indicators need to be installed on the balcony doors.
FIRE-Final Inspection7/15/20057/15/20057/15/2005PCANC
DetailsTroy Cobbley
Request for temp; ###-####
FIRE-Final Inspection7/13/20057/14/20057/14/2005AFAIL
DetailsTroy Cobbley
doug; Phone #: ###-#### Provide exit discharge lighting and approved hardware at the first floor southeast exterior door or remove hardware and exit sign. Provide fire extinguishers as marked in red on drawing sheets A1 and A2. Provide/repair exit signs and emergency lights as marked on sheets E1 and E2. Provide missing door hardware on all doors.
BLD-Wall cover2/24/20052/25/20052/25/2005APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/24/2005 at 3:06:15 PM. Contact: ###-####.
Interior layer of drywall at elevator shaft ok 2/25/2005 9:09:08 AM
BLD-Framing/Rough-in1/4/20051/5/20051/5/2005APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 1/4/2005 at 4:04:58 PM. Contact: ###-####.
interior walls @ TI ok to cover. 1/5/2005 10:11:32 AM
BLD-Energy code compliance12/8/200412/9/200412/9/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/8/2004 at 5:03:38 PM. Contact: ###-####.
BLD-Framing/Rough-in12/6/200412/7/200412/7/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/6/2004 at 12:58:37 PM. Contact: ###-####.
ok to cover interior walls.
Contractor to leave all "hard" ceiling areas uncovered for future sprinkler insp. 12/7/2004 11:55:47 AM
Issue PAID IN FULL permit  11/23/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/15/2004 DONE
PLAN MODIFICATION FINISHED
Telephone call  11/15/2004 DONE
talked to cornel larson ###-#### - his permit and fees are ready to be picked up
Routing - FIRE11/8/2004 11/12/2004 PASS
Plan Mod.
Routing - PLAN CHECK10/18/2004 11/8/2004 PEND
Ron Hill approved modification and routed plans to the fire department Bill Alexander on 11/08/04. Permit pending fire departments approval.
Case Summary (BLD)  10/29/2004 DONE
Plan resubmittals received  10/20/2004 DONE
Received Transmittal Letter, & 3 Sets of Sheets A-1,A-2,A-3.. Taken to Ron Hill...
Routing - PLUMBING10/15/2004 10/18/2004 PASS
Plan Mod. per plans and 2003 upc
Plan Modification Accepted  10/15/2004 DONE
CHANGE STATUS TO (REV)  10/14/2004 DONE
Plan Mod.
Print Occupancy Form  7/22/2004 DONE
Inspection Record Card- Bld  7/22/2004 DONE
Permit Ready to Issue  7/22/2004 DONE
Telephone call  7/22/2004 DONE
left a message for Cornell -- permit is ready.
Plan Review Completed(1st rev)  7/21/2004 DONE
Routing - PLAN CHECK7/21/2004 7/21/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/21/2004 DONE
Plan assigned to (R_H)7/9/2004 7/21/2004 PASS
7/21/2004 14:06:04 RMH - activity updated through activity BLDA022 from case BLD04-01513.
Routing - FIRE7/19/2004 7/21/2004 DONE
DetailsBill Alexander
Case Summary (BLD)  7/19/2004 DONE
Routing - PLAN CHECK7/13/2004 7/19/2004 PEND
No corrections required by building department review, Routed plans to the fire department for review on 7/19/04. Permit pending fire departments review.
Routing - PUBLIC WORKS7/12/2004 7/13/2004 PASS
Plans ACCEPTED BY PLAN TECH  7/9/2004 DONE
No Mechanical or Envelope Compliance Sheet...
Application received  7/7/2004  
Recd Pcfee & Taken To Pln CK  7/7/2004  
Fee Review-notes7/7/20047/7/2004