Permit NumberBLD04-01528
StatusFinaled
Name BRYAN CARRIER
Site Address 2873 W PALOUSE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To move two story single family dwelling and a 396 sq. ft. detached garage from 2268 Gekeler Lane and bring up to code at new location (2813 West Palouse Street) in accordance with owners agreement and $2000.00 bond on file (Bond #04-00099). Work to include footings and basement walls, garage footings/foundation walls, 2nd level dormer and bringing home up to code in compliance with MIS04-00174. Hard-surfaced driveway will be required from street to garage. (1st floor 939 sq. ft.)(2nd floor 468 sq. ft.)(finished basement 920 sq. ft.) PC #345 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/21/200611/27/200611/27/2006APASS
DetailsTom Arcoraci
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
DOC - Permit Finaled11/27/200611/27/200611/27/2006PPASS
DetailsTom Arcoraci
BLD-Final11/16/200611/17/200611/17/2006APART
DetailsTom Arcoraci
mike ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Final11/3/200611/6/200611/6/2006APART
DetailsTom Arcoraci
jake ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith finish handrail going up stairs
BLD-Conference7/18/20067/18/20067/18/2006APART
DetailsBob Archibald
Conference on requirements for final.
BLD-Energy code compliance12/15/200512/16/200512/16/2005APASS
DetailsTom Arcoraci
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in10/17/200510/18/200510/18/2005APART
DetailsMike Jordan
bryan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. ok to insulate exteroir walls at main level.
BLD-Conference7/13/20057/14/20057/14/2005PPASS
DetailsTom Arcoraci
###-#### Brian conf on winders
BLD-Framing/Rough-in4/27/20054/28/20054/28/2005APART
DetailsTom Arcoraci
bryan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie old headers ok
BLD-Other3/28/20053/28/20053/28/2005PPART
DetailsTom Arcoraci
No new work in progress. Permit will expire 4/6/05 with no activity.
BLD-Conference3/28/20053/28/20053/28/2005PPART
DetailsTom Arcoraci
Conference with contractor. Interior demolition and remodeling in progress(slow). Work has been performed on garage shear and inspection will be requested soon. Other required inspections will be called in asa work progresses and prior to 180 days from this date.
BLD-Foundation10/5/200410/6/200410/6/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/5/2004 at 8:06:32 AM. Contact: ###-####.
BLD-Footing10/4/200410/4/200410/4/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/4/2004 at 10:31:57 AM. Contact: ###-####.
BLD-Foundation9/9/20049/10/20049/10/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/9/2004 at 6:08:30 PM. Contact: ###-####. wip ok 9/10/2004 9:53:31 AM
BLD-Footing9/8/20049/8/20049/8/2004PPASS
DetailsTom Arcoraci
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  9/1/2004 DONE
Plan Reviewer's activity  8/31/2004 DONE
bond has been posted. contract for concrete work submitted. ok to issue.
PLANS/APPL TAKEN TO FRONT DESK  8/31/2004 DONE
Case Summary (BLD)  8/31/2004 DONE
Inspection Record Card- Bld  8/31/2004 DONE
Permit Ready to Issue  8/31/2004 DONE
(F) Reprint permit  8/31/2004 DONE
Telephone call  8/31/2004 DONE
talked to bryan at ###-#### that permit is ready
Plans ACCEPTED BY PLAN CHECK  7/14/2004  
Plan Reviewer's activity  7/14/2004  
need valuation for basement construction, bond need to be posted with Cathy to bring house up to code.
Routing - PLANNING7/9/2004 7/12/2004 PASS
O.K. per redlined plans. (Deck will be over 1' tall so it needs to be a minimum of 5' away from the property line as redlined.)
Routing - PUBLIC WORKS7/12/2004 7/12/2004 PASS
BENCH SEWER DISTRICT
Routing - PLANNING Land Div7/8/2004 7/9/2004 PASS
One-time division of Lot 6, Block 3 of Abbs Subdivision.
Application received  7/8/2004  
Pending Assignment by DJO7/8/2004    
Routing - PLAN CHECK7/12/2004