Letter of compliance | | | 12/28/2005 | | DONE |
|
|
|
Letter of Compliance issued 12-28-05.
|
First Notice | 12/8/2005 | 12/8/2005 | 12/22/2005 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | PASS |
Dave Hannah
|
|
|
duane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | FAIL |
Forrest France
|
|
|
Fire Sprinklers do not meet requirements of NFPA 13 for spacing and head location. Obtain a fire sprinkler permit prior to start of any on site work.
|
BLD-Framing/Rough-in | 6/28/2005 | 6/28/2005 | 6/28/2005 | P | PART |
Dave Hannah
|
|
|
please call 1 hour prior to inspection so he can get you access////dewayne; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreframing ok needs fire sprinckler oked first
|
BLD-Conference | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | DONE |
Dave Hannah
|
|
|
dwayne --call 1st for conf Internet Inspection Request from: Marsha Smylie
|
BLD-Aging Inspection | 2/22/2005 | 2/22/2005 | 2/22/2005 | | PASS |
Dave Hannah
|
|
|
check if no act by 5/12/05 2/22/2005 8:11:46 AM
|
Issue PAID IN FULL permit | | | 11/23/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/23/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2004 | | DONE |
|
|
|
left mess for jessica at ###-#### that permit is ready
|
Plan assigned to (CJW) | 7/14/2004 | | 11/18/2004 | | PASS |
|
|
|
11/18/2004 14:31:29 CJW - activity updated through activity BLDA022 from case BLD04-01557.
|
Routing - PLAN CHECK | 8/4/2004 | | 11/18/2004 | | PASS |
|
|
|
(10-27-04) Completed 1st resubmittal review. Need evaluation of spiral stairway point load on the floor and resubmitted Sheet A2.0 with all references to the IRC removed. Waiting for resubmittals.
(11-18-04) Drawings approved with clarifications after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/18/2004 | | DONE |
|
|
|
Returned call to Jessica R. at Erstad-Thornton Architects. She said that they are now the architect of record.
|
Plan resubmittals received | | | 11/15/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Copys of sheet A2.0 Taken to Carl W.
|
Plan Reviewer's activity | | | 10/27/2004 | | FAIL |
|
|
|
Resubmittal review failed. Need evaluation of spiral stairway point load on the floor and resubmitted Sheet A2.0 with all references to the IRC removed.
|
Telephone call | | | 10/27/2004 | | DONE |
|
|
|
Failed resubmittal review. Called the architect. Explained what was need to approve the drawings. No hard copy or electronic copy of requirements will be sent. He understood what is needed.
|
Plan resubmittals received | | | 10/25/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Structural Calc Booklets 2 Copys of Sheets T1.0,A1.0, A3.0 Taken to Carl Westfall...
|
Telephone call | | | 8/16/2004 | | DONE |
|
|
|
Called to verify that the architect had received the plan review report.
|
Routing - FIRE | 8/2/2004 | | 8/4/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 8/4/2004 | | FAIL |
|
|
|
failed plan check
|
Routing - PLAN CHECK | 7/19/2004 | | 8/2/2004 | | |
|
|
|
Failed 1st IBC plan review. IBC plan review started July 30, 2004 and finished August 2, 2004. A response from the architect was required. See the plan review report.
|
Routing - PUBLIC WORKS | 7/16/2004 | | 7/16/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/14/2004 | | DONE |
|
|
|
|
Application received | | | 7/13/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2004 | | DONE |
|
|
|
|
Fee Review-notes | 7/13/2004 | 7/13/2004 | | | |
|
|
|
|