Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01559
StatusFinaled
Name ADVANCE AMERICA
Site Address 10388 W OVERLAND RD
Project NameFIVE MILE PLAZA
Customer Number 
ePlanReviewNo
Description
(ADVANCE AMERICA)(FIVE MILE PLAZA) New office and storage tenant in an existing 1,709 sq. ft. space in existing shopping center per approved plans on file. Work to include interior finish, new counters/cabinets, partially upgrading restroom to accessible standards in compliance with the 20% the cost of the valuation requirement, and electrical work. Nonseparated Uses per IBC Section 302.3.2. Any sagging insulation obstructing sprinkler heads and any paper backed insulation not meeting minimum flame spread index rating of 25 and smoke developed index rating of 450 to be addressed if existing in space per an Upgrade Agreement on file. A Certificate of Occupancy is to be issued when completed and approved. This shopping center was originally constructed in Ada County and later annexed into Boise City. NOTE: This building is fully fire sprinklered for area increase. (PC#0435-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/20/2011  
BLD-Aging Inspection11/23/200611/23/200611/27/2006 CANC
DetailsMike Jordan
BLD-Aging Inspection8/29/20068/29/20068/29/2006 CANC
DetailsMike Jordan
BLD-Aging Inspection6/29/20066/29/20066/30/2006 CANC
DetailsMike Jordan
BLD-Aging Inspection4/21/20064/21/20064/21/2006 CANC
DetailsMike Jordan
DOC - Permit Expired4/21/20064/21/20064/21/2006PDONE
DetailsMike Jordan
Plan resubmittals received  9/28/2004 DONE
Received Transmittal Letter, 3 Copys of A1 Taken to Jason B.
Plan Reviewer's activity  9/28/2004  
Architect has provided an addendum concerning the existing restroom. Apparently it was not accessible as first thought, so architect has provided a breakdown of 20% the cost of the valuation to be applied into increased accessibility at the restroom. New lavatory/faucet, grab bars/blocking, and new 3' door with accessible hardware will be provided. The minimum clearances within the room still do not meet minimum accessibility standards and will need to be addressed under any future remodel permits.
FIRE-Final Inspection9/7/20049/8/20049/8/2004APASS
DetailsTroy Cobbley
fire life safety finaled 9/7/2004 2:46:18 PM
BLD-Final9/8/20049/8/20049/8/2004PPART
DetailsLane Manuel
michele; Phone #: ###-#### Internet Inspection Request from: Annette Moore
temp. c of o given.
Designer in process of applying for 20% of project cost for ada upgrades of existing bathroom. All additional elec., plumb., mech. insp's. will be necessary as applicable 9/8/2004 4:32:17 PM
FIRE-Final Inspection9/2/20049/2/20049/2/2004PPART
DetailsTroy Cobbley
This inspection was only for verification that the violating sprinkler pendant had been removed. Per Mike Bereman with Shilo no permit was required per Bill Alexander 9/2/2004 4:00:39 PM
FIRE-Final Inspection8/17/20048/18/20048/18/2004AFAIL
DetailsTroy Cobbley
Remove thumbturn on the main entry/exit. Keyed hardware (lock) on both sides is OK. Provide sticker at main exit. Remove thumbturn from rear exit. Repair or replace inoperative exit sign and emergency lights. Mount and tag fire extinguisher. Provide approved door hardware for all doors. Lever type is ok. Lift sagging insulation at sprinkler uprights and remove or relocate the extra sprinkler pendant that is spaced less than 6' from another pendant.. Work will require permits. It does not appear any review notes have been read. 8/18/2004 11:54:40 AM
BLD-Final8/17/20048/18/20048/18/2004AFAIL
DetailsLane Manuel
michele; Phone #: ###-#### Internet Inspection Request from: Annette Moore
left c/n. bathroom work not done yet! 8/18/2004 11:55:35 AM
Issue PAID IN FULL permit  8/17/2004  
Print Occupancy Form  8/13/2004 DONE
Inspection Record Card- Bld  8/13/2004 DONE
Permit Ready to Issue  8/13/2004 DONE
Telephone call  8/13/2004 DONE
left a message for Rob -- permit is ready.
Plan assigned to (JCB)7/16/2004 8/12/2004 PASS
8/12/2004 13:18:12 JCB - activity updated through activity BLDA022 from case BLD04-01559.
Routing - PLAN CHECK8/12/2004 8/12/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  8/12/2004 PASS
Routing - FIRE8/6/2004 8/11/2004 PASS
Review comments faxed to architect to remind of upgrade agreement requirements addressed in the comments.
Plan Review Completed(1st rev)  8/11/2004 PASS
Routing - PLAN CHECK7/20/2004 8/6/2004 PEND
When approved by Fire Dept. permit can be issued. Plans to route to Fire Dept. for review.
Routing - PUBLIC WORKS7/16/2004 7/19/2004 PASS
Application received  7/13/2004  
Recd Pcfee & Taken To Pln CK  7/13/2004 DONE
Fee Review-notes7/13/20047/13/2004