Permit Information
Permit NumberBLD04-01595
StatusFinaled
Name WESTERN PROPERTIES
Site Address 4729 N VILLA RIDGE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3325 sq. ft. two story single family dwelling with a 1560 sq. ft. finished basement, a 888 sq. ft. attached three car garage and a 398 sq. ft. concrete patio at daylighted basement with a 398 sq. ft. wood deck off main level per approved plans, all engineering/red-lining and attached condition list. The permit holder is responsible to comply with current wall bracining requirements as adopted by Boise City and attached engineering. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space shall be maintained. (1st floor 2306 sq. ft.)(2nd floor 1019 sq. ft.) PC #361 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/5/20058/5/20058/5/2005PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 8/5/2005 at 10:15:33 AM.
c of o issued
BLD-Final8/4/20058/5/20058/5/2005ACANC
DetailsTony Young
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
re-scheduled for pm
DOC - Permit Finaled8/5/20058/5/20058/5/2005PPASS
DetailsTony Young
BLD-Final7/29/20057/29/20057/29/2005PNR
DetailsTony Young
john--call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Grading Inspection6/8/20056/8/20056/8/2005 DONE
Final grading and drainage approved
BLD-Energy code compliance1/31/20052/1/20052/1/2005PPASS
DetailsTony Young
John; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in1/19/20051/21/20051/21/2005APASS
DetailsTony Young
John; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in1/13/20051/13/20051/13/2005PFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 1/13/2005 at 10:03:05 AM. c/n posted 1/13/2005 4:04:41 PM
BLD-Framing/Rough-in1/5/20051/6/20051/6/2005ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 1/5/2005 at 10:52:22 AM. Contact: ###-####.
BLD-Framing/Rough-in1/6/20051/6/20051/6/2005PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 1/5/2005 at 10:52:22 AM. Contact: ###-####.
c/n posted,,, don't insulate 1/6/2005 1:53:52 PM
BLD-Footing12/20/200412/20/200412/20/2004ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 12/20/2004 at 7:11:26 AM. Contact: ###-####.
wrong permit called in 12/20/2004 10:22:02 AM
BLD-Footing9/13/20049/13/20049/13/2004PPART
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
front ftgs 9/13/2004 3:20:25 PM
BLD-Concrete8/26/20048/26/20048/26/2004PPART
DetailsTony Young
###-#### jim
basement walls 8/26/2004 2:17:48 PM
BLD-Grading Inspection8/17/20048/17/20048/17/2004 PASS
Footing subgrade approved by the geotechnical engineer
BLD-Footing8/17/20048/17/20048/17/2004PPART
DetailsTony Young
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
lower ftgs ok,, wip 8/18/2004 9:08:44 AM
PubWorks Subgrade Approval7/17/20047/17/20048/17/2004 DONE
Footing subgrade approved by geotech.8/17/04
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
BLD-Footing8/11/20048/11/20048/11/2004PNR
DetailsTony Young
JIM ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
need soil 1st 8/11/2004 5:01:40 PM
Override - Activity Holds  7/30/2004  
Issue PAID IN FULL permit  7/30/2004 DONE
Override - Activity Holds  7/29/2004  
Permit Ready to Issue  7/29/2004 DONE
Override - Activity Holds  7/29/2004  
Inspection Record Card- Bld  7/29/2004 DONE
Print Occupancy Form  7/29/2004 DONE
Telephone call  7/29/2004 DONE
permit ready and fee due
Plan assigned to (DJO)7/28/20047/28/20047/28/2004 DONE
Case Summary (BLD)  7/28/2004 DONE
Plan Review Report  7/28/2004  
Plans ACCEPTED BY PLAN CHECK  7/28/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/28/2004 DONE
Pending Assignment by DJO7/16/2004 7/28/2004 DONE
7/28/2004 16:29:13 DJO - activity updated through activity BLDA169 from case BLD04-01595.
Routing - FIRE7/20/2004 7/21/2004 DONE
no fire sprinklers required (eyrie canyon #2 sub)
Routing - Erosion and Sediment7/19/2004 7/20/2004 PASS
ESC plan approved with attached conditions.
Routing - PLANNING7/19/2004 7/19/2004 PASS
Routing - PUBLIC WORKS7/19/2004 7/19/2004 PASS
NORTHWEST BOISE SEWER DISTRICT
Routing - PUBLIC WORKS GRADING7/16/2004 7/17/2004 PASS
Approved as Category 3 with conditions of approval in letter from Boise Public Works attached to the plans.
Application received  7/16/2004  
Routing - PLAN CHECK7/21/2004