PubWorks Occupancy Approval | 9/5/2006 | 9/5/2006 | 9/5/2006 | | DONE |
|
|
|
B. Murphy signed off occupancy 09/30/04.
|
Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/14/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///singed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 7/13/2005 | 7/13/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/23/2005 | 7/13/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/23/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10589 issued 5-23-05 to Nampa Floors & Interiors.
|
FIRE-Final Inspection | 5/20/2005 | 5/20/2005 | 5/20/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 5/19/2005 | 5/20/2005 | 5/20/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 11:31:07 AM. Contact: ###-####. ok for perm when fire is ok
|
Permanent Occupancy | | 5/20/2005 | 5/20/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/19/2005 | 5/19/2005 | 5/19/2005 | P | FAIL |
Troy Cobbley
|
|
|
Mount fire extinguishers, provide verification of the removal of the fire hydrant, lower east exit sign, figure out rated room, firal the fire sprinkler and fire alarm permits.
|
BLD-Framing/Rough-in | 2/18/2005 | 2/18/2005 | 2/18/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/18/2005 at 8:14:29 AM. Contact: ###-####.
ok to cover hard lid areas 2/22/2005 7:32:16 AM
|
BLD-Energy code compliance | 2/16/2005 | 2/17/2005 | 2/17/2005 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/16/2005 at 2:29:48 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/15/2005 | 2/15/2005 | 2/15/2005 | P | NR |
Tony Young
|
|
|
chris or janell; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 1/27/2005 | 1/31/2005 | 1/31/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 2:45:09 PM. Contact: ###-####.
ok to cover unaffected walls only 1/31/2005 4:11:36 PM
|
BLD-Framing/Rough-in | 1/25/2005 | 1/26/2005 | 1/26/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 2:01:48 PM. Contact: ###-####.
sill anchors ok,,, ok to keep insulating 1/26/2005 4:40:05 PM
|
BLD-Framing/Rough-in | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 6:33:45 AM. Contact: ###-####.
c/n posted,, ok to insulate walls only 1/24/2005 3:19:30 PM
|
Routing - FIRE | 12/17/2004 | | 12/17/2004 | | PASS |
Bill Alexander
|
|
|
Fire sprinkler system is being installed in this facility in lieu of a new hydrant. Verified and approved with trade-off per Dave Miller, 11:10am, 10/17/04.
|
Plan resubmittals received | | | 12/17/2004 | | DONE |
|
|
|
Revised site plan (fire sprinklers) plan shows a hydrant removed from BLD plans which will be traded for fire sprinklers in this facility. Document "Hydrant Traded" attached indicates location of hydrant location traded for fire sprinklers.
|
BLD-Other | 12/3/2004 | 12/6/2004 | 12/6/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/3/2004 at 3:36:36 PM. Contact: ###-####.
exterior shear ok 12/6/2004 11:01:28 AM
|
BLD-Foundation | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Tom Arcoraci
|
|
|
donnie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 10/7/2004 | 10/7/2004 | 10/7/2004 | P | PASS |
Dave Hannah
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
(F) Reprint permit | | | 9/27/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/24/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/24/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/16/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/16/2004 | | DONE |
|
|
|
|
Routing - FIRE | 9/8/2004 | | 9/14/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLUMBING | 9/14/2004 | | 9/14/2004 | | PASS |
|
|
|
provide a cleanout on the building sewer every 100' and every 135 degrees of horizontal change in direction.
|
Routing - PLAN CHECK | 9/14/2004 | | 9/14/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2004 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 7/20/2004 | | 9/14/2004 | | PASS |
|
|
|
9/14/2004 11:51:27 JCM - activity updated through activity BLDA022 from case BLD04-01600.
|
Routing - PLAN CHECK | 9/2/2004 | | 9/8/2004 | | |
|
|
|
|
Plan resubmittals received | | | 9/7/2004 | | DONE |
|
|
|
Received letter of transmittal , united water flow sheet, site plan, map taken to John M.
|
Routing - PLANNING | 8/26/2004 | | 8/31/2004 | | PASS |
|
|
|
Approved per DRH04-101. Passed on to Susan for CUP approval.
Approved per CUP04
|
Plan Reviewer's activity | | | 8/26/2004 | | PASS |
|
|
|
Reviewed and approved requested resubmittals (structural and nonstructural) JCM
|
Routing - PLAN CHECK | 8/12/2004 | | 8/26/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/25/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Sets of E-2.0, E-4.0 Taken to John Menard...
|
Plan resubmittals received | | | 8/24/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Sets of L-1.0,A-3.0,A-4.0,A-7.0 Taken to John Menard...
|
Routing - FIRE | 8/9/2004 | | 8/12/2004 | | FAIL |
Bill Alexander
|
|
|
Facility requires fire protection. A hydrant within allowable distances is located in McKessinger Lane. Provide required hydrant flows. The Architect of Record for the construction phase of this project shall provide as part of the Building Permit required documents the hydrant water supply flow available for the type of construction, (reference IFC B105.1). Water flow information is available by contacting United Water at: ###-####, and obtaining water supply information in certificate form. The required fire flow for this 8,420-ft/2 type V-B facility will be: 2,500 gpm. The fire flow will determine the number of hydrants required (reference IFC Table C105.1). A minimum 3 hydrants within (modified to 300' for commercial properties per BMC 7-01-45) distance are required. Provide required hydrant flows and location of 2 other hydrant meeting requirements, or obtain written approval from Dave Miller (Fire Marshal) at: ###-#### otherwise. (IFC 105.4, C105.1 "Exception")
|
Plan Review Completed(1st rev) | | | 8/12/2004 | | FAIL |
|
|
|
Failed: Fire, Plan Check, Structure, Planning, Plumbing.
|
Routing - PLAN CHECK | 8/5/2004 | | 8/9/2004 | | FAIL |
|
|
|
|
Routing - PLUMBING | 8/4/2004 | | 8/4/2004 | | FAIL |
|
|
|
a plan showing the size and location of the building sewer from the building to the stub or main will be required.
|
Routing - Erosion and Sediment | 8/3/2004 | | 8/4/2004 | | PASS |
|
|
|
ESC plan approved with attached conditons.
|
Plan resubmittals received | | | 8/3/2004 | | DONE |
|
|
|
Received two sets of ES1.1,ES1.2 put with plans taken to Steve Webb.
|
Routing - PLANNING | 8/3/2004 | | 8/3/2004 | | FAIL |
|
|
|
Bld documents do not show requirements of DR.
|
Routing - Erosion and Sediment | 7/29/2004 | | 8/2/2004 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/2/2004 | | |
|
|
|
Mailed the architect a copy of the plan review comment list and a copy of the structural engineers comment list requesting revisions. JCM
|
Routing - PUBLIC WORKS | 7/21/2004 | | 7/29/2004 | | PASS |
|
|
|
PLANS TAKEN TO ESC
|
Routing Off Site - STRUCTURAL | 7/21/2004 | | 7/29/2004 | | FAIL |
|
|
|
Called PDQ for pick-up Received comment list from the consulting structural engineer. Required responses not significant enough for second review by the consulting structural engineer, will be reviewed by plan reviewer. JCM
|
Plans ACCEPTED BY PLAN TECH | | | 7/21/2004 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/21/2004 | | |
|
|
|
|
Routing - PLANNING Land Div | 7/21/2004 | | 7/21/2004 | | PASS |
|
|
|
Lot 21, Block 1, Cessna Landing Subdivision
|
Application received | | | 7/16/2004 | | |
|
|
|
|