Permit Information
Permit NumberBLD04-01600
StatusFinaled
Name CHRIS CONNOR CONSTRUCTION LLC
Site Address 5874 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Nampa Floors & Interiors - To construct a new 8,420 square foot, one story, wood framed retails store for flooring and interiors. This building contains M and S-1 occupancies and was reviewed using the unseparated uses option (IBC, Section 302.3.2). All construction per the approved plans and attached comment list. #04-443/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval9/5/20069/5/20069/5/2006 DONE
B. Murphy signed off occupancy 09/30/04.
Third Notice BLD12/6/200512/6/200512/14/2005 DONE
Second Notice has not been responded to.///singed off 2004 permit per Jenifer & Rita
Second Notice BLD7/13/20057/13/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 5/23/20057/13/2005 DONE
Permanent occupancy  5/23/2005 DONE
Perm. Occ. Cert. # 10589 issued 5-23-05 to Nampa Floors & Interiors.
FIRE-Final Inspection5/20/20055/20/20055/20/2005PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final5/19/20055/20/20055/20/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/19/2005 at 11:31:07 AM. Contact: ###-####. ok for perm when fire is ok
Permanent Occupancy 5/20/20055/20/2005 DONE
Details
FIRE-Final Inspection5/19/20055/19/20055/19/2005PFAIL
DetailsTroy Cobbley
Mount fire extinguishers, provide verification of the removal of the fire hydrant, lower east exit sign, figure out rated room, firal the fire sprinkler and fire alarm permits.
BLD-Framing/Rough-in2/18/20052/18/20052/18/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 2/18/2005 at 8:14:29 AM. Contact: ###-####.
ok to cover hard lid areas 2/22/2005 7:32:16 AM
BLD-Energy code compliance2/16/20052/17/20052/17/2005PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 2/16/2005 at 2:29:48 PM. Contact: ###-####.
BLD-Framing/Rough-in2/15/20052/15/20052/15/2005PNR
DetailsTony Young
chris or janell; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Energy code compliance1/27/20051/31/20051/31/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/27/2005 at 2:45:09 PM. Contact: ###-####.
ok to cover unaffected walls only 1/31/2005 4:11:36 PM
BLD-Framing/Rough-in1/25/20051/26/20051/26/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/25/2005 at 2:01:48 PM. Contact: ###-####.
sill anchors ok,,, ok to keep insulating 1/26/2005 4:40:05 PM
BLD-Framing/Rough-in1/24/20051/24/20051/24/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/24/2005 at 6:33:45 AM. Contact: ###-####.
c/n posted,, ok to insulate walls only 1/24/2005 3:19:30 PM
Routing - FIRE12/17/2004 12/17/2004 PASS
DetailsBill Alexander
Fire sprinkler system is being installed in this facility in lieu of a new hydrant. Verified and approved with trade-off per Dave Miller, 11:10am, 10/17/04.
Plan resubmittals received  12/17/2004 DONE
Revised site plan (fire sprinklers) plan shows a hydrant removed from BLD plans which will be traded for fire sprinklers in this facility. Document "Hydrant Traded" attached indicates location of hydrant location traded for fire sprinklers.
BLD-Other12/3/200412/6/200412/6/2004APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/3/2004 at 3:36:36 PM. Contact: ###-####.
exterior shear ok 12/6/2004 11:01:28 AM
BLD-Foundation10/8/200410/8/200410/8/2004PPASS
DetailsTom Arcoraci
donnie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing10/7/200410/7/200410/7/2004PPASS
DetailsDave Hannah
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
(F) Reprint permit  9/27/2004  
Issue PAID IN FULL permit  9/24/2004 DONE
(F) Reprint permit  9/24/2004 DONE
Inspection Record Card- Bld  9/16/2004 DONE
Print Occupancy Form  9/16/2004 DONE
Permit Ready to Issue  9/16/2004 DONE
Routing - FIRE9/8/2004 9/14/2004 PASS
resubmittal acceptable.
Routing - PLUMBING9/14/2004 9/14/2004 PASS
provide a cleanout on the building sewer every 100' and every 135 degrees of horizontal change in direction.
Routing - PLAN CHECK9/14/2004 9/14/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/14/2004 DONE
Plan assigned to (JCM)7/20/2004 9/14/2004 PASS
9/14/2004 11:51:27 JCM - activity updated through activity BLDA022 from case BLD04-01600.
Routing - PLAN CHECK9/2/2004 9/8/2004  
Plan resubmittals received  9/7/2004 DONE
Received letter of transmittal , united water flow sheet, site plan, map taken to John M.
Routing - PLANNING8/26/2004 8/31/2004 PASS
Approved per DRH04-101. Passed on to Susan for CUP approval.
Approved per CUP04
Plan Reviewer's activity  8/26/2004 PASS
Reviewed and approved requested resubmittals (structural and nonstructural) JCM
Routing - PLAN CHECK8/12/2004 8/26/2004 PASS
Plan resubmittals received  8/25/2004 DONE
Received Transmittal Letter, & 2 Sets of E-2.0, E-4.0 Taken to John Menard...
Plan resubmittals received  8/24/2004 DONE
Received Transmittal Letter, & 2 Sets of L-1.0,A-3.0,A-4.0,A-7.0 Taken to John Menard...
Routing - FIRE8/9/2004 8/12/2004 FAIL
DetailsBill Alexander
Facility requires fire protection. A hydrant within allowable distances is located in McKessinger Lane. Provide required hydrant flows. The Architect of Record for the construction phase of this project shall provide as part of the Building Permit required documents the hydrant water supply flow available for the type of construction, (reference IFC B105.1). Water flow information is available by contacting United Water at: ###-####, and obtaining water supply information in certificate form. The required fire flow for this 8,420-ft/2 type V-B facility will be: 2,500 gpm. The fire flow will determine the number of hydrants required (reference IFC Table C105.1). A minimum 3 hydrants within (modified to 300' for commercial properties per BMC 7-01-45) distance are required. Provide required hydrant flows and location of 2 other hydrant meeting requirements, or obtain written approval from Dave Miller (Fire Marshal) at: ###-#### otherwise. (IFC 105.4, C105.1 "Exception")
Plan Review Completed(1st rev)  8/12/2004 FAIL
Failed: Fire, Plan Check, Structure, Planning, Plumbing.
Routing - PLAN CHECK8/5/2004 8/9/2004 FAIL
Routing - PLUMBING8/4/2004 8/4/2004 FAIL
a plan showing the size and location of the building sewer from the building to the stub or main will be required.
Routing - Erosion and Sediment8/3/2004 8/4/2004 PASS
ESC plan approved with attached conditons.
Plan resubmittals received  8/3/2004 DONE
Received two sets of ES1.1,ES1.2 put with plans taken to Steve Webb.
Routing - PLANNING8/3/2004 8/3/2004 FAIL
Bld documents do not show requirements of DR.
Routing - Erosion and Sediment7/29/2004 8/2/2004 FAIL
Plan resubmittals requested  8/2/2004  
Mailed the architect a copy of the plan review comment list and a copy of the structural engineers comment list requesting revisions. JCM
Routing - PUBLIC WORKS7/21/2004 7/29/2004 PASS
PLANS TAKEN TO ESC
Routing Off Site - STRUCTURAL7/21/2004 7/29/2004 FAIL
Called PDQ for pick-up Received comment list from the consulting structural engineer. Required responses not significant enough for second review by the consulting structural engineer, will be reviewed by plan reviewer. JCM
Plans ACCEPTED BY PLAN TECH  7/21/2004  
Plan routing begun/NEW & ADDTN  7/21/2004  
Routing - PLANNING Land Div7/21/2004 7/21/2004 PASS
Lot 21, Block 1, Cessna Landing Subdivision
Application received  7/16/2004