Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/29/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/13/2005 | 7/13/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/6/2005 | 7/13/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 6/6/2005 | 6/6/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/6/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10624 issued 6-6-05 to Baird's Dry Cleaners.
|
BLD-Final | 5/25/2005 | 5/26/2005 | 5/26/2005 | P | PASS |
Tom Arcoraci
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Note: please call 1/2 hr prior to inspectionokfor perm occ.
|
Code Occupancy Approval | 5/24/2005 | 5/24/2005 | 5/24/2005 | A | PASS |
Dena Gambrel
|
|
|
Passed inspection and the City can release their bond. 5/24/2005 9:43:56 AM
|
FIRE-Final Inspection | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled. NO EQUIPMENT OR CHEMICALS IN BUILDING AT TIME OF INSPECTION
|
BLD-Final | 4/21/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Troy James
|
|
|
rick--for temp occ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
temp occ only to office area, no performing of equipment allowed 4/22/2005 3:36:52 PM
|
CHANGE STATUS TO (ISS) | | | 4/22/2005 | | DONE |
|
|
|
|
Temporary occupancy | | | 4/22/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5236 issued 4-22-05 to Baird's Dry Cleaners for the office area only.
|
FIRE-Final Inspection | 4/20/2005 | 4/21/2005 | 4/21/2005 | P | FAIL |
Forrest France
|
|
|
Provide review comments for life safety issues.
|
BLD-Framing/Rough-in | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | PASS |
Tom Arcoraci
|
|
|
ok to cover rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
PubWorks Occupancy Approval | 4/12/2005 | 4/12/2005 | 4/12/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 4/12/05. G.Fitts
|
BLD-Wall cover | 3/2/2005 | 3/2/2005 | 3/2/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 8:18:32 AM. Contact: ###-####.
|
BLD-Footing | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 10:27:57 AM. Contact: ###-####.
|
BLD-Concrete | 1/20/2005 | 1/21/2005 | 1/21/2005 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 5:07:54 PM. Contact: ###-####. spec insp 1/21/2005 1:29:20 PM
|
BLD-Concrete | 1/10/2005 | 1/11/2005 | 1/11/2005 | P | PART |
Tom Arcoraci
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore spec insp ok 1/11/2005 3:25:22 PM
|
BLD-Concrete | 1/4/2005 | 1/5/2005 | 1/5/2005 | A | PASS |
Tom Arcoraci
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Jan Rice spec insp on site 1/5/2005 10:02:16 AM
|
BLD-Concrete | 12/27/2004 | 12/28/2004 | 12/28/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/27/2004 at 12:10:24 PM. Contact: ###-####. spec insp on site 12/28/2004 9:00:46 AM
|
BLD-Footing | 12/14/2004 | 12/15/2004 | 12/15/2004 | P | PASS |
Tom Arcoraci
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Footing | 12/13/2004 | 12/14/2004 | 12/14/2004 | A | PASS |
Tom Arcoraci
|
|
|
rick ###-####
|
BLD-Footing | 12/10/2004 | 12/13/2004 | 12/13/2004 | P | CANC |
Tom Arcoraci
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles cancelled per Rick at 10:34am BAS
|
BLD-Foundation | 12/8/2004 | 12/9/2004 | 12/9/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 9:26:35 AM. Contact: ###-####.
|
BLD-Footing | 12/3/2004 | 12/6/2004 | 12/6/2004 | A | PART |
Tom Arcoraci
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Jan Rice incomplete 12/6/2004 9:02:48 AM
|
BLD-Footing | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PASS |
Tom Arcoraci
|
|
|
|
(F) Reprint permit | | | 11/2/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/1/2004 | | DONE |
|
|
|
|
Additional plans submitted | | | 10/29/2004 | | PEND |
|
|
|
Letter received from architect requesting the bldg not be sprinklered based on an NFPA 32 exception. Sent PC of letter to Dave Miller for consideration.
|
Permit Ready to Issue | | | 10/27/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/27/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/27/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/27/2004 | | DONE |
|
|
|
left mess for rob thornton at ###-#### that permit is ready
|
Routing - PLANNING | 10/25/2004 | | 10/26/2004 | | PASS |
|
|
|
DR - Approved per DRH04-00033 and per revised sheets dated October 22, 2004. - SMS
Plans pass per CUP04-08, Bench Sewer letter received - KLG.
|
Routing - PLAN CHECK | 10/26/2004 | | 10/26/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/26/2004 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 7/21/2004 | | 10/26/2004 | | PASS |
|
|
|
10/26/2004 16:37:47 M_P - activity updated through activity BLDA022 from case BLD04-01608.
|
Routing - PLANNING Land Div | 10/25/2004 | | 10/25/2004 | | PASS |
|
|
|
Parcels have been combined into one parcel with a Quit Claim recorded on 10/22/04.
|
Routing - PLAN CHECK | 10/22/2004 | | 10/25/2004 | | |
|
|
|
Routing to PLanning
|
Plan resubmittals received | | | 10/25/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Copys of sheet A1.11 Taken to Mike Phillips.
|
Routing - PLANNING Land Div | 10/19/2004 | | 10/20/2004 | | FAIL |
|
|
|
Need copy of recorded deed with metes and bounds description of entire parcel. Received Recording Instrument number of Record of Survey and Legal Description. Call Rob Thornton ###-#### on 10/19/04.
|
Routing - PLAN CHECK | 10/15/2004 | | 10/19/2004 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
Route to Land Division and P & Z after I finish my review.
|
Plan resubmittals received | | | 10/18/2004 | | |
|
|
|
Received copy of Boundary Description information.
|
Routing - FIRE | 10/13/2004 | | 10/15/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PUBLIC WORKS | 10/5/2004 | | 10/13/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/13/2004 | | 10/13/2004 | | |
|
|
|
Routing to fire
|
Routing - PLAN CHECK | 8/26/2004 | | 10/5/2004 | | |
|
|
|
Routing to P. W.
|
Plan resubmittals received | | | 10/4/2004 | | DONE |
|
|
|
Received Transmittal Letter, 1 HAZARDOUS ,MATERIAL INVENTORY STATEMENT,MANAGEMENT PLAN & MATERIAL SAFTY DATA SHEETS BOOKLET, 1 MATERIAL SAFTY DATA SHEET BOOKLET & 2 Copys of A0.01,A1.11,A2.11,A2.31,A2.41,A3.11,A4.11,A4.22,A6.11,S1.0,C-4,M1.00,M2.00,M3.00,M3.OO,M4.00,M5.00,FP1.00,E2.0,E2.1FS,E3.0 Taken to Mike Phillips....
|
Routing - Erosion and Sediment | 8/25/2004 | | 8/26/2004 | | PASS |
|
|
|
Ready to route back to ESC. ESC plan approved with attached conditions.
|
Plan Review Completed(1st rev) | | | 8/25/2004 | | FAIL |
|
|
|
failed planning land div, planning, public works, ESC, plan check and fire.
|
Routing - FIRE | 8/20/2004 | | 8/25/2004 | | FAIL |
|
|
|
Lacks adequate fire flow, hydrant locations, haz mat info, dry cleaning system type and related equip details. Review comments faxed to architect.
|
Routing - PLAN CHECK | 8/6/2004 | | 8/20/2004 | | FAIL |
|
|
|
Plan review complete, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing Off Site - STRUCTURAL | 8/5/2004 | | 8/20/2004 | | PASS |
|
|
|
No further review required.
|
Plan resubmittals received | | | 8/6/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 booklets of Storm Water & Sediment and Erosion Control Plan, 1 Set of C-5 Taken to Mike Phillips....
|
Routing - PLUMBING | 8/3/2004 | | 8/6/2004 | | PASS |
|
|
|
boiler to have its own R.P. on make up water, contact bench sewer district ###-#### for pretrearment requirements, any changes to the plumbing system will need to be resubmitted to the building department for review and approval.
|
Routing - PLANNING | 8/3/2004 | | 8/3/2004 | | FAIL |
|
|
|
DRH04-00033 Sara S.
CUP04-00008 Karen G.
This is failed for both the DR and the CUP. A variance is currently being processed for the canopy within the setback along Fairview.
|
Routing - Erosion and Sediment | 7/29/2004 | | 8/2/2004 | | FAIL |
|
|
|
ESC plan does not include enough information regarding the demo phase of construction, informed applicant.
|
Routing - PUBLIC WORKS | 7/27/2004 | | 7/29/2004 | | FAIL |
|
|
|
geotech test hole: contact Brian Murphy ###-####
|
Routing - PLANNING Land Div | 7/24/2004 | | 7/27/2004 | | FAIL |
|
|
|
Need to combine parcels into one by recording new deed with a metes and bounds description and providing a new tax parcel number. Called Rob Thornton at ###-####. He said he would have Tim Fox take care of it.
|
Plans ACCEPTED BY PLAN TECH | | | 7/24/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/24/2004 | | |
|
|
|
|
Application received | | | 7/19/2004 | | |
|
|
|
|
Routing - PLANNING | 10/20/2004 | | | | FAIL |
|
|
|
Route to Planning and Zoning after going to Land Division
Applicant is addressing the south curb cut. Also need to obtain a letter from the Bench Sewer District to fulfill CUP requirements.
|