Permit Information
Permit NumberBLD04-01609
StatusFinaled
Name COMPLETE REMODELING
Site Address 2436 N CLAREMONT DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 256s.f. addition to an existing 2500s.f. single family dwelling in the foothills area. "THE PERMIT HOLDER IS RESPONSIBLE TO COMPLY WITH CURRENT WALL BRACING REQUIREMENTS AS ADOPTED BY BOISE CITY" Work to include the relocation of the kitchen and master suite and extending the living room area. R-1B setbacks ok per c.r. Separate electrical, plumbing, mechanical and ESc permits are required. Footing subgrade must be approved by geotechnical engineer and letter submitted to Boise Public Works prior to scheduling footing inspection bu building department structural division. Call Treey Records at 208-384-3946. All per the approved plans as marked, foundation engineering, ESC plan and narrative; RScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/30/20061/30/20061/30/2006PPASS
DetailsTony Young
John -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
DOC - Permit Finaled1/30/20061/30/20061/30/2006PPASS
DetailsTony Young
John -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Final1/26/20061/27/20061/26/2006ANR
DetailsTony Young
John -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
need trades 1st,, no inspection made
BLD-Framing/Rough-in1/24/20051/24/20051/24/2005PPASS
DetailsTroy James
please call prior to inspection///john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in1/20/20051/21/20051/21/2005ACANC
DetailsTroy James
John-call before you go; Phone #: ###-#### Internet Inspection Request from: Jan Rice
john cancelled 1/21/2005 10:37:31 AM
BLD-Framing/Rough-in1/21/20051/21/20051/21/2005PFAIL
DetailsTroy James
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n posted upstairs 1/21/2005 2:33:59 PM
BLD-Energy code compliance10/14/200410/15/200410/15/2004APASS
DetailsTroy James
john ; Phone #: ###-#### Note: please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance10/13/200410/14/200410/14/2004PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/13/2004 at 4:36:40 PM. Contact: ###-####.
BLD-Framing/Rough-in10/11/200410/13/200410/13/2004AFAIL
DetailsTroy James
please call prior to inspection so he can meet ya there////john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need to complete framing around fireplace and get mechanical approval. ok to insulate 10/13/2004 9:34:51 AM
BLD-Foundation8/27/20048/27/20048/27/2004PPASS
DetailsTroy James
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Foundation8/25/20048/26/20048/26/2004APASS
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to place concrete back addition 8/26/2004 8:49:54 AM
BLD-Footing8/18/20048/19/20048/19/2004APASS
DetailsTroy James
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Grading Inspection8/17/20048/17/20048/17/2004 PASS
Footing subgrade has been approved by the geotechnical engineer. However, two locations had soft soils which were overexcavated and must be filled with concrete. This is acceptable to the geotech.
PubWorks Subgrade Approval7/20/20047/20/20048/17/2004 DONE
Footing subgrade has been approved 8/17/04
A letter from the applicants geotechnical engineer must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
Override - Activity Holds  8/9/2004  
Issue PAID IN FULL permit  8/9/2004 DONE
Plan assigned to (PEP)7/19/20047/19/20047/26/2004 PASS
7/26/2004 08:45:08 PEP - activity updated through activity BLDA022 from case BLD04-01609.
Case Summary (BLD)  7/26/2004  
Plan Review Report  7/26/2004  
PLANS/APPL TAKEN TO FRONT DESK  7/26/2004 DONE
Override - Activity Holds  7/26/2004  
Inspection Record Card- Bld  7/26/2004 DONE
Override - Activity Holds  7/26/2004  
Permit Ready to Issue  7/26/2004 DONE
Telephone call  7/26/2004 DONE
PERMIT READY AND FEE DUE
Routing - Erosion and Sediment7/20/2004 7/21/2004 PASS
ESC plan approved with attached conditions.
Routing - PLANNING7/20/2004 7/20/2004 PASS
O.K. per R-1B setbacks as indicated on site plan. Addition will be over 50' from rear property line. Family rm./kitchen remodel w/ no second kitchen.
Routing - PUBLIC WORKS GRADING7/19/2004 7/20/2004 PASS
A letter from the applicants geotecghnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
Application received  7/19/2004  
Routing - PLAN CHECK