Permit Information
Permit NumberBLD04-01610
StatusFinaled
Name HALL, FARLEY, OBERRECHT, & BLANTON
Site Address 702 W IDAHO ST
Project NameKEY FINANCIAL-8TH FLR
Customer Number 
ePlanReviewNo
Description
(HALL, FARLEY, OBERRECHT, AND BLANTON - KEY FINANCIAL - 8TH FLR) This building is fire sprinklered because it is a high-rise. To remodel part of an existing 6,179 square foot office tenant space located on the 8th floor of an existing high-rise building (i.e. the Key Financial building). Work is to include interior nonbearing walls, interior doors, a new 1-hr corridor wall, and a corridor fire door all per the approved drawings and the plan review report on file. Within the remodel area, the location of fire spinkler heads shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/20/20055/20/200512/9/2005 DONE
Second Notice has not been responded to.///Over a year old No final values
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 11/3/20044/26/2005 DONE
Permanent occupancy  11/3/2004 DONE
Perm. Occ. Cert. # 10347 issued 11-3-04 to Hall, Farley, Oberrecht & Blanton.
Permanent Occupancy 11/2/200411/2/2004 DONE
Details
FIRE-Final Inspection11/1/200411/2/200411/2/2004APASS
DetailsRick Jackson
Don, ###-####
BLD-Final11/2/200411/2/200411/2/2004PPASS
DetailsTom Arcoraci
Don, ###-####
Inspection Record Card- Bld  10/11/2004  
Print Occupancy Form  10/11/2004 DONE
Telephone call  10/6/2004 DONE
Called Marv Meyer and told him that the existing corridor construction may remain without alterations. New construction to the corridor, though, is required to comply with the 1-hr fire-resistance rated corridor provisions of the 2000 IBC.
Plan Reviewer's activity  10/6/2004 PASS
Approved resubmitted drawings.
Plan resubmittals received  10/5/2004 DONE
Received Transdmittal Letter, & 2 Copys of Sheets A1.1 Taken to Carl Westfall...
BLD-Framing/Rough-in9/17/20049/20/20049/20/2004AFAIL
DetailsDave Hannah
Don, ###-#### ok to cover walls but still have a problem with 1 hr ceiling in corr 9/20/2004 1:38:52 PM
BLD-Framing/Rough-in9/15/20049/17/20049/17/2004PFAIL
DetailsDave Hannah
Don, ###-#### everything ok but for corr walls and ceiling 9/17/2004 2:59:09 PM
Issue PAID IN FULL permit  9/7/2004 DONE
Print Occupancy Form  8/13/2004 DONE
Inspection Record Card- Bld  8/13/2004 DONE
Permit Ready to Issue  8/13/2004 DONE
Telephone call  8/13/2004 DONE
spoke with Jeff -- permit is ready.
Routing - PLAN CHECK8/11/2004 8/12/2004 PASS
Drawings approved after receiving the Architect's response.
PLANS/APPL TAKEN TO FRONT DESK  8/12/2004 DONE
Plan assigned to (CJW)7/28/2004 8/12/2004 PASS
8/12/2004 08:49:25 CJW - activity updated through activity BLDA022 from case BLD04-01610.
Routing - FIRE8/6/2004 8/11/2004 PASS
Plan Review Completed(1st rev)  8/11/2004 FAIL
failed plan check
Routing - PLAN CHECK7/29/2004 8/6/2004  
Failed first IBC plan review. IBC plan review started August 4, 2004 and finished the next day. A response from the architect was required. See the plan review report.
Routing - PUBLIC WORKS7/28/2004 7/29/2004 PASS
PLANS TAKEN TO CARL WESTFALL
Plans ACCEPTED BY PLAN TECH  7/24/2004  
Application received  7/19/2004  
Recd Pcfee & Taken To Pln CK  7/19/2004 DONE
Fee Review-notes7/19/20047/19/2004