BLD-Conference | 4/21/2005 | 4/27/2005 | 4/27/2005 | A | PASS |
Tony Young
|
|
|
please call prior to inspection ###-####///jack; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
###-####, verify rear landing, gaurdrail
|
DOC - Permit Finaled | 4/27/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 4/27/2005 2:52:05 PM
|
BLD-Final | 4/21/2005 | 4/21/2005 | 4/21/2005 | P | PART |
Tony Young
|
|
|
please call prior to inspection ###-####///jack; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
###-####,, gave paperwork for bank purposes,, need landing brought up 1" in rear,, gaurdrail secured, f/caulk, address,, etc. 4/21/2005 4:32:52 PM
|
BLD-Grading Inspection | 4/21/2005 | 4/21/2005 | 4/21/2005 | | DONE |
|
|
|
final grading and drainage approved
|
BLD-Energy code compliance | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PASS |
Tony Young
|
|
|
###-#### - jack
|
BLD-Energy code compliance | 1/19/2005 | 1/19/2005 | 1/19/2005 | P | PASS |
Troy James
|
|
|
Need to insulate above front door 1/19/2005 1:17:56 PM
|
BLD-Framing/Rough-in | 1/14/2005 | 1/14/2005 | 1/14/2005 | P | PART |
Dave Hannah
|
|
|
please call prior to inspection//jack; Phone #: ###-#### Internet Inspection Request from: Barbara Moore shear ok to cover ext but still need engineer to reveiw mst strapes over garagre framing ok to insulate but need letter from truss engineer on t12 truss 1/14/2005 4:21:19 PM
|
BLD-Framing/Rough-in | 1/11/2005 | 1/11/2005 | 1/11/2005 | P | FAIL |
Troy James
|
|
|
please call prior to inspection///###-#### jack
need mst 28 straps per plans, shear insp. only1/11/2005 4:00:34 PM 1/11/2005 4:00:56 PM
|
BLD-Framing/Rough-in | 1/4/2005 | 1/5/2005 | 1/5/2005 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 2:37:04 PM. Contact: ###-####.
shear only,,, need to do as drawn,,, or get revisions from architect,,, need trades prior to frame on home. 1/5/2005 11:32:52 AM
|
BLD-Footing | 9/17/2004 | 9/17/2004 | 9/17/2004 | P | PASS |
Troy James
|
|
|
Paul; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Plan Reviewer's activity | | | 9/17/2004 | | DONE |
|
|
|
designer has came in and red-lined plans to reflect new engineering. have received new calculations. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/17/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 9/17/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 9/17/2004 | | 9/17/2004 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/17/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/17/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/17/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/17/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/17/2004 | | DONE |
|
|
|
spoke with Jack -- permit is ready.
|
Issue PAID IN FULL permit | | | 9/17/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/10/2004 | | FAIL |
|
|
|
received resubmittals. engineered beam size has been changed without calculations. (3)16" micro-lams fail. have phoned engineer and left message.
|
BLD-Grading Inspection | 9/9/2004 | 9/9/2004 | 9/9/2004 | | DONE |
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
PubWorks Subgrade Approval | 8/12/2004 | 8/12/2004 | 9/9/2004 | | DONE |
|
|
|
a letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Routing - PLAN CHECK | 8/29/2004 | | 9/2/2004 | | FAIL |
|
|
|
9/2/04-Plans require redesign per Dan Overy. Met with builder on this date. Returned marked up set to building on 9/3/04.
|
Routing - Erosion and Sediment | 8/26/2004 | | 8/27/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals received | | | 8/25/2004 | | DONE |
|
|
|
Received transmittal letter to Steve Webb with narrative and plan. Put with plan set.
|
Routing - FIRE | 8/24/2004 | | 8/25/2004 | | PASS |
|
|
|
No fire sprinklers required (Quail Ridge Sub # 6)
|
Routing - Erosion and Sediment | 8/23/2004 | | 8/24/2004 | | FAIL |
|
|
|
ESC needs modifications. Discussed with PD.
|
Routing - PLANNING | 8/23/2004 | | 8/23/2004 | | PASS |
|
|
|
received revised architectural site plan Monday 8/23. Issues resolved. Retaining wall shall be built per civil drawings for location and height.
|
Routing - PLANNING | 8/19/2004 | | 8/20/2004 | | FAIL |
|
|
|
arbor structure and driveway issues resolved in resubmitted site plan. However - retaining wall and driveway shown on site plan does not match grading and drainage plan. These two plans must be consistent also per Terry Records. EEG left message for Jeff King. TR spoke with Jack Wagoner.
|
Routing - PLANNING | 8/18/2004 | | 8/18/2004 | | FAIL |
|
|
|
Issues with driveway and arbor structure have not been resolved. Spoke with Jeff King requesting new plans.
|
Routing - PLANNING | 8/13/2004 | | 8/13/2004 | | FAIL |
|
|
|
Issues with driveway easement, and arbor structure in rear setback. Spoke with Jeff King requesting revised plans.
|
Routing - PUBLIC WORKS | 8/12/2004 | | 8/13/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/12/2004 | | 8/12/2004 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS GRADING | 7/20/2004 | | 7/21/2004 | | FAIL |
|
|
|
Soils report does not indicate that pad is acceptable
|
Application received | | | 7/20/2004 | | |
|
|
|
|
Pending Assignment by DJO | 7/20/2004 | | | | |
|
|
|
|