Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD04-01632
StatusFinaled
Name FOUNDATION
Site Address 950 W BANNOCK ST
Project Name10TH & BANNOCK
Customer Number 
ePlanReviewNo
Description
10TH & BANNOCK BUILDING - Excavation, Grading and Drainage and Foundation Permit - This permit is for the excavation for the building foundation, the site grading and drainage work and the construction of the reinforced concrete foundation for the future twelve story, 189,920 square foot, office and retail building. The foundation work to be completed under this permit includes the footings, piers, grade beams, slab on grade, concrete walls up to grade and wall dowels at grade. All construction per the approved plans on file. #04-457/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Third Notice BLD1/8/20071/8/20072/1/2007 DONE
Second Notice has not been responded to.
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice8/30/20068/30/20069/25/2006 DONE
DetailsDave Hannah
BLD-Final8/29/20068/30/20068/30/2006APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
DOC - Permit Finaled8/30/20068/30/20068/30/2006PPASS
DetailsDave Hannah
Code Occupancy Approval  6/12/2006 PASS
Inspection at 12:30 found compliance has been met.
BLD-Energy code compliance6/27/20056/28/20056/27/2005ACANC
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Bob Thornton Inspection cancelled from web by: Bob Thornton
FIRE-Supply Line Cover6/14/20056/14/20056/14/2005APART
DetailsForrest France
Underground fire supply vaults are allowed to be installed under this excavation and grading permit per Sam Rogers. Vaults match submitted plans of type and installation method, OK to cover.
FIRE-Sprinkler Rough-in6/13/20056/13/20056/13/2005PFAIL
DetailsForrest France
###-#### Bob Underground fire supply storage tanks appear to have been installed without a fire permit. This work must cease until a fire permit is obtained or verification is given that this work is allowed under BLD04-01632.
BLD-Concrete6/2/20056/3/20056/6/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/2/2005 at 1:55:08 PM. Contact: ###-####.
BLD-Concrete5/22/20055/24/20055/24/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/22/2005 at 6:45:24 PM. Contact: ###-####.
BLD-Concrete5/22/20055/23/20055/24/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/22/2005 at 6:44:38 PM. Contact: ###-####.
BLD-Concrete5/10/20055/11/20055/16/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/10/2005 at 6:23:02 PM. Contact: ###-####.
BLD-Conference5/4/20055/4/20055/4/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2005 at 3:56:44 PM. met with geo tech on site over seeing the drilled peirs for the most project going ok they will get me paperwork on peirs
BLD-Conference5/4/20055/4/20055/4/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2005 at 3:56:44 PM. crew is placing conc for section of shear wall met with spec ins all going ak
BLD-Concrete5/3/20055/4/20055/4/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2005 at 3:56:44 PM.
BLD-Concrete4/26/20054/27/20054/28/2005ADONE
DetailsDave Hannah
BLD-Concrete4/26/20054/27/20054/28/2005APART
DetailsDave Hannah
BLD-Concrete4/26/20054/26/20054/26/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/26/2005 at 7:21:03 AM. Contact: ###-####.
BLD-Concrete4/21/20054/21/20054/21/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/19/20054/20/20054/20/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/20/20054/20/20054/20/2005PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/18/20054/19/20054/19/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/19/20054/19/20054/19/2005PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2005 at 2:20:17 PM. Contact: ###-####.
BLD-Concrete4/7/20054/11/20054/11/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/7/2005 at 9:38:53 AM. Contact: ###-####.
BLD-Concrete4/2/20054/4/20054/4/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/2/2005 at 2:25:02 PM. Contact: ###-####.
BLD-Foundation3/21/20053/21/20053/21/2005PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/21/2005 at 10:24:51 AM. Contact: ###-####.
BLD-Foundation3/16/20053/16/20053/16/2005PPART
DetailsDave Hannah
###-#### - bob strata has signed off rebar placement starts this afternoon 3/17/2005 10:28:02 AM
(F) Reprint permit  3/16/2005 DONE
Plan assigned to (JCM)2/15/20052/15/20053/14/2005 PASS
3/14/2005 09:11:23 JCM - activity updated through activity BLDA022 from case BLD04-01632.
Plan Reviewer's activity  3/14/2005 PASS
Reviewed and approved plan modification to removed the east 20 feet of the ground floor. JCM Reviewed with Sam Rogers and he indicated that he had previously seen the proposed modification and did not need to see it. JCM
PLANS/APPL TAKEN TO FRONT DESK  3/14/2005 DONE
Routing - PLAN CHECK3/10/2005 3/14/2005 PASS
Permit Ready to Issue  3/14/2005 DONE
Inspection Record Card- Bld  3/14/2005 DONE
Routing - PLANNING2/23/2005 3/10/2005 PASS
Approved for Design Review per DRH04-49 for grading, foundation permit only. Pending review per CUP04-19 Modification #2. Plans routed to Scott S. for review of CUP.
BLD-Footing3/9/20053/9/20053/9/2005PPART
DetailsDave Hannah
###-#### - bob
Override - Parcel Holds  3/9/2005  
Override - Parcel Holds  3/9/2005  
Routing - PUBLIC WORKS2/17/2005 2/23/2005 PASS
Override - Parcel Holds  2/16/2005  
Issue & PRINT permit  2/16/2005 DONE
Plans ACCEPTED BY PLAN TECH  2/16/2005  
CHANGE ISSUED DATE  2/16/2005 DONE
Plan Modification Accepted  2/15/2005 DONE
Plan Modification excepted for customer parking & roof terrace on east side of the building that has been removed . The drive through remains & the customer parking that was west of the drive through has been removed per City of Boise's request.The customer parking has been encompased into the building as Tenant space. See Addendum # 6 wright up for additional info for storm water reclaim system.( note sheets that changed have been identified with clouds & attached wright up.)
Telephone call  1/10/2005 DONE
talked to lisa with the russell corp at ###-#### that permit needs to be picked up this month
Override - Parcel Holds  10/18/2004  
Permit Ready to Issue  10/18/2004 DONE
Override - Parcel Holds  10/18/2004  
Inspection Record Card- Bld  10/18/2004 DONE
Telephone call  10/18/2004 DONE
left mess with russell corp at ###-#### that permit is ready
Routing - PLAN CHECK10/7/2004 10/13/2004 PASS
Routed resubmitted sheets C-101, C-102, C-303, approved by Brian Murphy to John Menard. kmm
Additional plans submitted  10/13/2004  
Received recorded copy of permenant footing easement agreement with ACHD for below grade footing areas within the right-of-way. JCM
PLANS/APPL TAKEN TO FRONT DESK  10/13/2004 DONE
Plan assigned to (JCM)7/26/2004 10/13/2004 PASS
10/13/2004 11:22:30 JCM - activity updated through activity BLDA022 from case BLD04-01632.
Routing Off Site - STRUCTURAL8/23/2004 9/16/2004 PASS
Called PDQ for pick - up - Received a faxed letter from the consulting structural engineer approving the resubmitted structural plans. JCM
Plan resubmittals received  9/16/2004 DONE
Received transmittal letter, letter to Brian & John, response letter, two sets of Storm Water Volume calculation, two O&Manuals, one Geotechnical investigation.three sets of sheets C-101,C-102,C-303, taken to John M.
Plan resubmittals received  8/20/2004  
Received Transmittal Letter, & 3 Sets of C-001,C-101,C-102,C-103,C-303, S-201,S-301,S-302,S-303,S-304,S-501,S-503,S-504,S-505,S-507,S-602 Taken to John Menard...
Plan Review Completed(1st rev)  8/13/2004 FAIL
Failed Structural
Routing - FIRE8/12/2004 8/13/2004 PASS
Routing - PLAN CHECK8/11/2004 8/12/2004 PASS
Approved for foundation and drainage only. JCM
Plan resubmittals requested  8/12/2004  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL7/26/2004 8/12/2004 FAIL
Contacted PDQ for outside engineering. Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLUMBING8/9/2004 8/11/2004 PASS
upproved per plan and 2003 UPC
Routing - PLANNING8/5/2004 8/9/2004 PASS
DRH04-00049 Marty
CUP04-00019 Mark Pecchenino
Routing - Erosion and Sediment8/4/2004 8/5/2004 PASS
ESC plan approved with attached conditions. Demo, excavation, drainage and foundation.
Routing - PUBLIC WORKS GRADING7/28/2004 8/4/2004 PASS
Routing - PLANNING Land Div7/26/2004 7/28/2004 PASS
Lots 1-4, Block 52 of B.C.O.T. described as one parcel with one tax parcel number.
Plans ACCEPTED BY PLAN TECH  7/26/2004  
Plan routing begun/NEW & ADDTN  7/26/2004  
Application received  7/20/2004  
Recd Pcfee & Taken To Pln CK  7/20/2004 DONE
Fee Review-notes7/20/20047/20/2004   
Routing - PLAN CHECK8/13/2004    
Routing - PLAN CHECK