DOC-Permit Expired | 12/5/2005 | 12/5/2005 | 12/5/2005 | | DONE |
Tony Young
|
|
|
Permit expired by limitations.
|
BLD - Request for Extension | 7/5/2005 | 7/6/2005 | 7/6/2005 | | PASS |
Dave Hannah
|
|
|
rob danielson ###-#### or ###-#### still working on this project please call him ok to ext
|
BLD-Other | 3/4/2005 | 3/7/2005 | 3/7/2005 | A | PASS |
Troy James
|
|
|
wall inspection please///doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 2/24/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 3:41:31 PM. Contact: ###-####.
|
BLD-Footing | 2/23/2005 | 2/25/2005 | 2/24/2005 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/23/2005 at 1:58:38 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 24 2005 3:38PM.
|
BLD-Grading Inspection | 1/21/2005 | 1/24/2005 | 1/24/2005 | P | CANC |
Troy James
|
|
|
KIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need to have inspection by public works for grading 1/24/2005 2:04:05 PM
|
BLD-Footing | 1/20/2005 | 1/21/2005 | 1/21/2005 | A | FAIL |
Troy James
|
|
|
dewayne; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
late morning 1/20/2005 1:45:18 PM
Need building permit for retaining wall and approval on soils by approved agency and ok per Terry Records 1/21/2005 10:58:58 AM
|
Issue PAID IN FULL permit | | | 12/3/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/2/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/2/2004 | | DONE |
|
|
|
left mess for elizabeth cooper at ###-#### that permit is ready
|
Routing - FIRE | 11/24/2004 | | 12/1/2004 | | PASS |
|
|
|
I called United Water 11/30 regarding the resubmitted United Water info; he indicated it is for the hydrants within the Somerset Hills develpment; he shows no hydrants west of the parking garages on W. Boise as shown on revised sheet A1.0; aArchitect needs to request flow info applicable to them. Met with architect 12/1 to discuss. They are having difficulty dealing with UW; I gave her Doug Schaefer's direct number and agreed to accept the submitted information for grading purposes.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/24/2004 | | 11/24/2004 | | PEND |
|
|
|
Plans placed in hold drawer awaiting fire.
|
Routing - PUBLIC WORKS | 11/16/2004 | | 11/24/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/8/2004 | | 11/16/2004 | | PEND |
|
|
|
Plans in hold box. kmm
|
Plan resubmittals received | | | 11/16/2004 | | DONE |
|
|
|
Received united water fire flow sheet put with plans.
|
Plan resubmittals received | | | 11/16/2004 | | DONE |
|
|
|
Received Transmittal Letter, 1- United Water Sheet, & 2 Copys of sheet A1.0 Added to main plans...
|
Routing - FIRE | 11/3/2004 | | 11/8/2004 | | FAIL |
|
|
|
inadequate fire flow for type of construction, inappropriate address for fire flow, need hydrants identified as new or existing.
|
Routing - PLANNING | 11/3/2004 | | 11/3/2004 | | PASS |
|
|
|
All corrections made, can approve.
|
Routing - Erosion and Sediment | 11/2/2004 | | 11/3/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals received | | | 11/2/2004 | | DONE |
|
|
|
Received certified RP.
|
Plan resubmittals received | | | 11/2/2004 | | DONE |
|
|
|
Received transmittal letter with fire flow and two sets of sheets A1.0 put with plans.
|
Routing - PLAN CHECK | 10/21/2004 | | 11/2/2004 | | PEND |
|
|
|
Plans put in hold box, waiting resubmittals. kmm
|
Routing - PUBLIC WORKS | 10/5/2004 | | 10/21/2004 | | FAIL |
|
|
|
SITE DRAINAGE NOT APPROVED PER BRIAN MURPHY AT ###-####
|
Routing - FIRE | 8/5/2004 | | 8/10/2004 | | FAIL |
|
|
|
Set up meeting with architect to clarify scope of work; plan sets do not have the same (consistent) dates on plans, no clouding or identification of changes on revised plan sheets; plans will change substantially according to Planning. Any changes required by Planning will required re-review/approval by Fire. Preliminary written review done at this point, and faxed to architect. .
|
Plan Review Completed(1st rev) | | | 8/10/2004 | | FAIL |
|
|
|
failed planning, plan check, ESC and Fire.
|
Routing - PLAN CHECK | 8/10/2004 | | 8/10/2004 | | PEND |
|
|
|
Plans placed in hold box awaiting resubmittals.
|
Routing - PLUMBING | 8/4/2004 | | 8/4/2004 | | PASS |
|
|
|
No Plumbing shown.
|
Routing - PLANNING | 7/29/2004 | | 8/4/2004 | | FAIL |
|
|
|
Site plan, landscaping plan and pathway fail to meet CU approval and requirements. Also a Hillside approval is required prior to issuance of building permits. Called Ms. Cooper on 8/4/2004 and notified her of issues.
|
Routing - PUBLIC WORKS | 7/27/2004 | | 7/28/2004 | | FAIL |
|
|
|
NEEDS HILLSIDE OK'D BY TERRY RECORDS & BRIAN MURPHY
|
Routing - Erosion and Sediment | 7/28/2004 | | 7/28/2004 | | FAIL |
|
|
|
Person listed as rp not certified through Boise City.
|
Routing - PLANNING Land Div | 7/22/2004 | | 7/27/2004 | | PASS |
|
|
|
Site is over 5 acres in size.
|
Plan assigned to (RAD) Rita | 7/22/2004 | 7/22/2004 | 7/22/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/22/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/22/2004 | | DONE |
|
|
|
|
Application received | | | 7/20/2004 | | |
|
|
|
|