BLD-Framing/Rough-in | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PASS |
Jim Sly
|
|
|
terry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie FINAL PASS 4/12/2005 2:00:21 PM
|
Letter of compliance | | | 4/12/2005 | | DONE |
|
|
|
Letter of Compliance issued 4-12-05
|
BLD-Framing/Rough-in | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | FAIL |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Should be final Need plumb final. 4/7/2005 12:14:04 PM
|
FIRE-Final Inspection | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety passed. 3/31/2005 8:39:24 AM
|
BLD-Final | 3/30/2005 | 3/31/2005 | 3/31/2005 | P | NR |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 3/30/2005 | 3/30/2005 | 3/30/2005 | P | CANC |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Marsha Smylie
|
Code Occupancy Approval | 3/30/2005 | 3/30/2005 | 3/30/2005 | A | PASS |
Carol Montgomery
|
|
|
Meets compliance with DR 3/30/2005 9:52:25 AM
|
Inspection Record Card- Bld | | | 3/30/2005 | | DONE |
|
|
|
|
FIRE-Sprinkler Rough-in | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide exit discharge lighting, provide additional addressing as discussed and paint curbing as per sheet E1.0 3/22/2005 3:27:16 PM
|
BLD-Conference | 3/4/2005 | 3/7/2005 | 3/7/2005 | A | PASS |
Jim Sly
|
|
|
Terry; Phone #: ###-#### Internet Inspection Request from: Jan Rice Talked about Req for Shell/Core final. Would like to complete Energy code (for shell) at each separate T I 3/7/2005 10:20:40 AM 3/7/2005 10:29:04 AM
|
BLD-Wall cover | 12/2/2004 | 12/3/2004 | 12/3/2004 | A | PART |
Lane Manuel
|
|
|
Keith -Wall & roof; Phone #: ###-#### Internet Inspection Request from: Jan Rice
roof/shear nailing ok. 12/3/2004 10:24:50 AM
|
BLD-Framing/Rough-in | 11/2/2004 | 11/2/2004 | 11/2/2004 | P | PART |
Jim Sly
|
|
|
terry///shear wall inspection; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Shear wall OK up to 8' only. 11/2/2004 2:03:58 PM
|
BLD-Foundation | 10/13/2004 | 10/14/2004 | 10/14/2004 | P | PASS |
Jim Sly
|
|
|
terry Note: Midafternoon (around 1:00); Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 10/11/2004 | 10/11/2004 | 10/11/2004 | P | PASS |
Jim Sly
|
|
|
terry -; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Letter from Stapley Eng..... 2500 PSI design strength 10/11/2004 4:28:50 PM
|
(F) Reprint permit | | | 9/29/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/27/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/27/2004 | | DONE |
|
|
|
talked to andrew davis at ###-#### that permit is ready
|
Routing - PLUMBING | 9/23/2004 | | 9/24/2004 | | PASS |
|
|
|
approved per plan and 2003 UPC
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2004 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 7/28/2004 | | 9/24/2004 | | PASS |
|
|
|
9/24/2004 15:07:25 MLO - activity updated through activity BLDA022 from case BLD04-01638.
|
Routing - PLANNING | 9/20/2004 | | 9/21/2004 | | PASS |
|
|
|
Approved per DRH00-00248 MOD #1, and per letter in D.R. file from Andrew Davis regarding h.c. parking.
|
Routing - PUBLIC WORKS | 9/13/2004 | | 9/20/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/16/2004 | | DONE |
|
|
|
Received letter of transmittal with two SD-1 sheets taken to Mike Otto.
|
Routing - PLAN CHECK | 9/10/2004 | | 9/13/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/10/2004 | | DONE |
|
|
|
sheets G-1, A3.1, A3.2, A3.3, M0.0
|
Routing - FIRE | 8/20/2004 | | 8/25/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 8/25/2004 | | FAIL |
|
|
|
failed planning, plan check, plumbing and public works
|
Routing - PLAN CHECK | 8/25/2004 | | 8/25/2004 | | PEND |
|
|
|
|
Plan resubmittals requested | | | 8/20/2004 | | FAIL |
|
|
|
IBC and IECC corrections
|
Routing - PLAN CHECK | 8/12/2004 | | 8/20/2004 | | FAIL |
|
|
|
faxed and mailed corrections to architect
|
Routing - PLANNING | 8/11/2004 | | 8/12/2004 | | FAIL |
|
|
|
Plans do not comply with Design Review, DRH00-248 Mod. #1, conditions, specifically condition 1d, which requires two accessible parking spaces for the proposed office development.
|
Routing - PLUMBING | 8/9/2004 | | 8/11/2004 | | FAIL |
|
|
|
water services from meter to vault do not match services from vault to building, increase roof drainage lines at the point they tie together to 4", please resubmit a revised site plan.
|
Routing - PUBLIC WORKS | 7/28/2004 | | 8/9/2004 | | FAIL |
|
|
|
Needs Geotech report per Brian Murphy.
|
Routing - Erosion and Sediment | 8/9/2004 | | 8/9/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 7/28/2004 | | 7/28/2004 | | PASS |
|
|
|
Lot 5, Knudsen Square Subdivision
|
Print Pending Permit.LaserJet4 | | | 7/28/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/28/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2004 | | DONE |
|
|
|
Mechanical envelope not signed and electrical sheets only stamped not signed.
|
Application received | | | 7/21/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/21/2004 | | DONE |
|
|
|
|
Fee Review-notes | 7/21/2004 | 7/21/2004 | | | |
|
|
|
|