Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01641
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 128 E MALLARD DR
Project NameFRANCOIS TROTTA MEDICAL BLDG
Customer Number 
ePlanReviewNo
Description
Francois Trotta Medical Office Building - To construct a 4500 sq ft two story Type VB office building. Other work includes all site improvements, landscaping and paving per approved plans and attachments, DRH04-74. 4,000 sq. ft. 1st floor with 500 sq. ft. 2nd floor.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/21/2015 DONE
Third Notice BLD12/6/200512/6/200512/14/2005 DONE
Second Notice has not been responded to.
Second Notice BLD7/13/20057/13/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 6/1/20057/13/2005 DONE
Permanent occupancy UNPAID FEE  6/1/2005 DONE
Perm. Occ. Cert. # 10609 issued 6-1-05 to the Francois Trotta Medical Bldg.
Permanent Occupancy 5/23/20055/23/2005 DONE
Details
Permanent Occupancy 5/23/20055/23/2005 DONE
Details
BLD-Final4/14/20054/14/20054/14/2005PPASS
DetailsJim Storey
glen; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok
BLD-Final4/5/20054/7/20054/7/2005ACANC
DetailsDave Hannah
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection4/1/20054/4/20054/4/2005PCANC
DetailsTroy Cobbley
Duplicate inspection
BLD-Final4/1/20054/4/20054/4/2005PPART
DetailsJim Storey
GLEN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles NEED HANDRAIL ON STAIRS AND PW AND ACHD SIGN OFF FOR TEMP PENDING ELE.
FIRE-Final Inspection3/30/20054/1/20054/4/2005PPASS
DetailsForrest France
Fire life safety pass.
Code Occupancy Approval4/4/20054/4/20054/4/2005APASS
DetailsWm. Michael Meloy
Compliance met. 4/4/2005 12:02:05 PM
BLD-Final3/30/20054/1/20054/1/2005PNR
DetailsDave Hannah
glen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final3/25/20053/30/20053/30/2005ANR
DetailsJim Storey
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection3/29/20053/29/20053/29/2005PCANC
DetailsTroy Cobbley
To be rescheduled 3/29/2005 12:32:54 PM
FIRE-Final Inspection3/25/20053/29/20053/29/2005AFAIL
DetailsTroy Cobbley
Provide emergency lighting in the northwest staff room, provide verification of duct smoke detector being required. 3/29/2005 10:45:13 AM
Override - Parcel Holds1/1/19001/1/19003/25/2005  
ok to have inspection per Louise////3/25/05 BAS
Override - Parcel Holds1/1/19001/1/19003/25/2005  
ok per Louise to give this ispection////3/25/05 BAS
BLD-Framing/Rough-in1/6/20051/7/20051/7/2005APASS
DetailsJim Storey
glenn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie framing and insulation ok for cover. 1/7/2005 3:01:32 PM
BLD-Conference1/7/20051/7/20051/7/2005APART
DetailsRick Jackson
Nobody at job site 1/7/2005 2:11:21 PM
BLD-Energy code compliance1/5/20051/6/20051/6/2005ANR
DetailsJim Storey
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in1/3/20051/4/20051/4/2005PPART
DetailsJim Storey
glenn Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles strap top plates at 2nd floor mlb/seal draft stop / plowin insulation markers. roof sheer ok bt engineer of record on file. 1/4/2005 3:40:23 PM
BLD-Framing/Rough-in1/3/20051/3/20051/3/2005PNR
DetailsJim Storey
glenn; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/15/200411/16/200411/16/2004APART
DetailsJim Storey
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice 1st floor exterior ok for sheer nail. 11/16/2004 10:28:33 AM
BLD-Foundation11/4/200411/5/200411/5/2004APART
DetailsJim Storey
Glen- Would like an early inspect-slab inspec; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner slab ft ok need re run on mec check or 2 inch thermal break thru slab. 11/4/2004 4:28:03 PM
BLD-Footing10/20/200410/20/200410/20/2004PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
BLD-Footing10/18/200410/19/200410/19/2004APASS
DetailsJim Storey
ready 1st thing; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
(F) Reprint permit  10/1/2004  
Issue PAID IN FULL permit  9/30/2004 DONE
Permit Ready to Issue  9/23/2004 DONE
Inspection Record Card- Bld  9/23/2004 DONE
Print Occupancy Form  9/23/2004 DONE
Telephone call  9/23/2004 DONE
Left message for Wes that permit is ready, fees and that we also need ACHD info///9/23/04 2:50pm BAS
Routing Off Site - STRUCTURAL9/15/2004 9/22/2004 PASS
Called PDQ for pick up.....
Routing - PLAN CHECK9/22/2004 9/22/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/22/2004 DONE
Plan assigned to (MLO)7/26/2004 9/22/2004 PASS
9/22/2004 10:48:34 MLO - activity updated through activity BLDA022 from case BLD04-01641.
Routing - PLAN CHECK9/15/2004 9/15/2004 PEND
pending structural approval
Plan resubmittals received  9/14/2004 DONE
Received transmittal letter,2-response letters, three sets of sheets 2,3,7,8 taken to Mike Otto.
Routing - FIRE9/2/2004 9/9/2004 PASS
resubmittal acceptable
Routing - PLAN CHECK9/9/2004 9/9/2004  
waiting for resubs
Routing Off Site - STRUCTURAL9/2/2004 9/8/2004 FAIL
Called PDQ for pick up....corrections faxed to engineer and architect
Plan resubmittals requested  9/8/2004 DONE
structural review comments of 9/8 and items 7 & 8 from plan check comments 8/27 and 9/2. MLO
Routing - PLAN CHECK8/31/2004 9/2/2004 FAIL
corrections 7 and 8 have no response with resubmittal.
Plan resubmittals received  8/31/2004 DONE
Received transmittal letter with response letter,two copies of additional calcs, united water flow sheet, three copies of sheet 8 taken to Mike Otto.
Routing - PLUMBING8/27/2004 8/27/2004 PASS
per plans and 2003 upc
Plan Review Completed(1st rev)  8/26/2004 FAIL
failed structural, plan check, plumbing and fire.
Routing - PLAN CHECK8/26/2004 8/26/2004 FAIL
Routing - FIRE8/23/2004 8/26/2004 FAIL
lacks hydrant flow info. Advised architect by phone, also faxed review comments to architect.
Routing - PLAN CHECK8/10/2004 8/23/2004 FAIL
corrections faxed and mailed to architect
Plan resubmittals requested  8/23/2004 FAIL
IBC corrections
Routing Off Site - STRUCTURAL7/26/2004 8/23/2004 FAIL
Called PDQ for pick-up. corrections sent to architect MLO
Plan resubmittals received  8/12/2004 DONE
Received transmittal letter with three 1 sheets taken to Mike Otto.
Routing - PLUMBING8/5/2004 8/10/2004 FAIL
please provide a site plan showing the size and location of the sewer and water services.
Routing - PLANNING8/5/2004 8/5/2004 PASS
Approved per DRH04-74 and as noted on sheet 1, which states that plant-landscape material shall be planted on top/slopes of berm, not at bottom of swale.
Routing - PUBLIC WORKS7/28/2004 8/4/2004 PASS
Routing - Erosion and Sediment8/4/2004 8/4/2004 PASS
ESC plan approved with attached conditions.
Plan resubmittals received  7/29/2004 DONE
Received Transmitttal Letter and 3 sheets of page 14 Energy Calcs that have been signed. Taken to Mike Otto...
Plan routing begun/NEW & ADDTN  7/28/2004  
Routing - PLANNING Land Div7/28/2004 7/28/2004 PASS
Lot 4, Kalange Subdivision
Plans ACCEPTED BY PLAN TECH  7/27/2004 FAIL
Plans are incomplete, The plans were submitted with some of the pages not signed , No O & M , SOILS REPORT,DRAINAGE CALCS.....
Application received  7/21/2004  
Routing Off Site - STRUCTURAL7/27/2004    
Called PDQ for pick-up