Description
(WASHINGTON GROUP INTERNATIONAL - MK CENTRAL PLAZA - 1ST FLR) This building is fire sprinklered for building area increase. To remodel a 2,442 square foot area located on the first floor of MK Central Plaza. Work is to include a relocated door, wall infills, and finishes all per the approved drawings and the plan review report on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/23/2013 DONE
BLD-Aging Inspection4/1/20054/1/20054/1/2005 FAIL
DetailsTroy James
informed vince to finish out permit 4/6/2005 1:35:05 PM
BLD-Final9/27/20049/28/20049/28/2004PPASS
DetailsTroy James
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection9/28/20049/28/20049/28/2004APASS
DetailsRick Jackson
Fire alarm modifications not needed as it was modified at previous tenant 9/28/2004 8:16:34 AM
FIRE-Final Inspection9/14/20049/15/20049/15/2004AFAIL
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Three sets of sprinkler heads are too close (within 6 ft of each other) 9/15/2004 2:48:50 PM
BLD-Framing/Rough-in8/23/20048/24/20048/24/2004APASS
DetailsTroy James
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Infill nonbearing walls where existing doors removed. 8/24/2004 9:58:42 AM
Issue PAID IN FULL permit  8/16/2004 DONE
Inspection Record Card- Bld  8/11/2004 DONE
Print Occupancy Form  8/11/2004 DONE
Permit Ready to Issue  8/11/2004  
Print Occupancy Form  8/11/2004  
Telephone call  8/11/2004 DONE
talked to larry at ###-#### that permit is ready
Plan assigned to (CJW)7/29/2004 8/10/2004 PASS
8/10/2004 16:07:47 CJW - activity updated through activity BLDA022 from case BLD04-01656.
Routing - FIRE8/4/2004 8/10/2004 PASS
Plan Review Completed(1st rev)  8/10/2004 PASS
Routing - PLAN CHECK8/10/2004 8/10/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/10/2004 DONE
Routing - PLAN CHECK7/26/2004 8/4/2004 PASS
IBC plan review started and finished August 4, 2004. The drawings were approved with clarifications. See the plan review report.
Plans ACCEPTED BY PLAN TECH  7/24/2004 DONE
Recd Pcfee & Taken To Pln CK  7/22/2004 DONE
Application received  7/22/2004  
Fee Review-notes7/22/20047/22/2004