Case Summary (BLD) | | | 8/27/2008 | | DONE |
|
|
|
|
Third Notice BLD | 5/20/2005 | 5/20/2005 | 8/27/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 11/15/2004 | 4/26/2005 | | DONE |
|
|
|
|
Letter of compliance | | | 11/18/2004 | | DONE |
|
|
|
Letter of Compliance issued 11-18-04.
|
DOC - Permit Finaled | 11/15/2004 | 11/15/2004 | 11/15/2004 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 11/15/2004 4:15:33 PM
|
BLD-Final | 11/15/2004 | 11/15/2004 | 11/15/2004 | P | PASS |
Troy James
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 11/5/2004 | 11/5/2004 | 11/5/2004 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 10/15/2004 | 10/15/2004 | 10/15/2004 | P | PASS |
Jim Storey
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie vestabual. 10/15/2004 3:34:50 PM
|
FIRE-Conference | 10/11/2004 | 10/11/2004 | 10/11/2004 | P | PART |
Rick Jackson
|
|
|
Met with GC about the door hardware, exit sings and required exiting from this space as the exsisting door had exit sign and none to be added on the approved plans; will need architect involvement to verify exiting 10/11/2004 3:55:59 PM
|
BLD-Footing | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | PASS |
Jim Storey
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 9/20/2004 | 9/21/2004 | 9/21/2004 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/20/2004 at 12:56:47 PM. Contact: ###-####.///cancelled per Ryan///9/21/04 8:31am BAS
|
Issue PAID IN FULL permit | | | 9/16/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2004 | | DONE |
|
|
|
PERMIT READY AND FEE DUE
|
Plan assigned to (M_P) | 7/28/2004 | | 8/27/2004 | | PASS |
|
|
|
8/27/2004 10:11:40 M_P - activity updated through activity BLDA022 from case BLD04-01662.
|
Routing - PLAN CHECK | 8/13/2004 | | 8/27/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/27/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/27/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/23/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Structural Calc Books, & 2 Sheets of A-1.0 Taken to Mike Phillips...
|
Routing - FIRE | 8/12/2004 | | 8/13/2004 | | PASS |
Bill Alexander
|
|
|
No notes attached. Approved on condition IBC review is accepted (exiting). Field Verify IFC requirements.
|
Plan Review Completed(1st rev) | | | 8/13/2004 | | FAIL |
|
|
|
FAILED: Plan Check.
|
Routing - PLAN CHECK | | | 8/12/2004 | | FAIL |
|
|
|
Plan review completed, Called architect and requested additional information and engineering for retaining wall with block wall on top and information on existing exiting to insure this door is not a required exit.
|
Case Summary (BLD) | | | 8/12/2004 | | |
|
|
|
|
Plan resubmittals received | | | 8/10/2004 | | DONE |
|
|
|
Received letter for Mike with two E-1.0 sheets taken to Mike P.
|
Routing - PLANNING | 8/3/2004 | | 8/5/2004 | | PASS |
|
|
|
Approved per CZC04-33.
|
Routing - Erosion and Sediment | 7/29/2004 | | 8/2/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 7/28/2004 | | 7/29/2004 | | PASS |
|
|
|
Site is over 5 acres in size.
|
Routing - PUBLIC WORKS | 7/29/2004 | | 7/29/2004 | | PASS |
|
|
|
BENCH SEWER DISTRICT: PLANS TAKEN TO ESC
|
Plans ACCEPTED BY PLAN TECH | | | 7/28/2004 | | FAIL |
|
|
|
Plans failed Certificate of value shows $ 7,000.00 in ELE but there is no ELE sheet and no ELE Compliance ... ESC RP is out to bid...
|
Plan routing begun/NEW & ADDTN | | | 7/28/2004 | | DONE |
|
|
|
|
Application received | | | 7/23/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/23/2004 | | DONE |
|
|
|
|
Fee Review-notes | 7/23/2004 | 7/23/2004 | | | |
|
|
|
|