Permit Information
Permit NumberBLD04-01700
StatusFinaled
Name DOUG STOREY
Site Address 360 E MALLARD DR Unit: 100
Project NameLAKEPOINTE CENTRE II
Customer Number 
ePlanReviewNo
Description
(HOLLINGSHEAD EYE CENTER)(LAKEPOINTE CENTRE II-STE 100) Remodel and new 3,076 sq. ft. expansion to an existing 4,011 sq. ft. outpatient eye clinic and office on first floor of existing building per approved plans on file and CZC04-00129. New tenant space total will be 7,087 sq. ft. Work to include miscellaneous interior demolition work, new accessible parking spaces and curb ramp, new exterior accessible ramp with handrails, new exterior canopy at entrance, new interior walls and doors, some new interior windows, two new accessible restrooms, interior finish, suspended ceiling work, new counters/cabinets, new sinks, fire sprinkler work, mechanical work, plumbing work, and electrical work. (Additional area reduces the adjacent space and a separate permit under BLD04-01699 will be attached to the same plans.) A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase. (PC#0477-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/20/20059/20/2005 DONE
Second Notice BLD7/13/20057/13/20059/20/2005 DONE
First Notice has not been responded to.
Fee Review-notes7/28/20047/28/20049/20/2005 DONE
First Notice 5/31/20057/13/2005 DONE
Permanent occupancy UNPAID FEE  5/31/2005 DONE
Perm. Occ. Cet. # 10602 issued 5-31-05 to Hollingshead Eye Center.
Permanent Occupancy 5/25/20055/25/2005 DONE
Details
Code Occupancy Approval  5/25/2005 PASS
OK PER PLANNING APPROVAL FINAL SIGNED OFF.
BLD-Final5/4/20055/6/20055/6/2005PPASS
DetailsJim Storey
please call 15 min prior///doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok pending p/z sign off.
FIRE-Final Inspection5/6/20055/6/20055/6/2005PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection5/4/20055/5/20055/5/2005PPART
DetailsForrest France
Final pending correct verbage on sign at main entry, see IFC 1008.1.8.3 #2.2 2003 ed.
FIRE-Conference4/22/20054/25/20054/25/2005ADONE
DetailsForrest France
Meeting with Doug to clarify requirements for inspection compliance on project.
BLD-Final4/20/20054/21/20054/21/2005PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2005 at 10:05:13 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 21 2005 11:27AM.
FIRE-Final Inspection4/20/20054/20/20054/20/2005PFAIL
DetailsForrest France
Two exit signs at main entrance do not operate under emergency power supply. Test and verify exit disharge lighting and outdoor listing. Provide "when building is occupied" sign and remove thumb turn from main dbl. doors. Fire ext. in billing dept. is mou
BLD-Framing/Rough-in1/25/20051/25/20051/25/2005PPASS
DetailsJim Storey
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final12/28/200412/29/200412/29/2004APART
DetailsJim Storey
Dave- Suite 100; Phone #: ###-#### Internet Inspection Request from: Jan Rice first phase ok. 12/29/2004 10:07:28 AM
FIRE-Final Inspection12/28/200412/29/200412/29/2004AFAIL
DetailsRick Jackson
Dave- Suite 100; Phone #: ###-#### Internet Inspection Request from: Jan Rice Need fire code review notes; install exit sign at vestibule per plans; need to verify exit/emergency lights on battery; provide extinguishers; install sprinkler escutcheons; provide sprinkler resubmittals; exit sign at lobby area - remove arrow; duct detectors may be required will verify with plan review notes - no mechanical plans 12/29/2004 8:47:02 AM
BLD-Framing/Rough-in11/9/200411/10/200411/10/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/9/2004 at 4:00:04 PM. Contact: ###-####. pending ele approval. 11/10/2004 9:57:50 AM
BLD-Conference10/20/200410/20/200410/20/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/20/2004 at 11:09:34 AM. Contact: ###-####.
Issue & PRINT to be Invoiced  9/15/2004 DONE
per Linda's instructions she is going to figure this out later///9/15/04 BAS
Permit Ready to Issue  9/10/2004 DONE
Inspection Record Card- Bld  9/10/2004 DONE
Print Occupancy Form  9/10/2004 DONE
Plan assigned to (JCB)8/3/2004 9/9/2004 PASS
9/9/2004 10:14:40 JCB - activity updated through activity BLDA022 from case BLD04-01700.
Routing - PLAN CHECK9/8/2004 9/9/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  9/9/2004 PASS
Routing - PUBLIC WORKS9/7/2004 9/8/2004 PASS
Jim Wylie.
Routing - PLAN CHECK8/24/2004 9/7/2004 FAIL
Letter from tenant required concerning cabinet/counter heights in Lane rooms and approval required by Jim Wylie in Public Works. Plans to route to Public Works.
Plan resubmittals received  8/30/2004 DONE
Received transmittal sheet, 2 response letters, three sets of sheets D-1.1,D-1.2,D-1.3,D-1.4,CRS, taken to Jason
Routing - FIRE8/20/2004 8/24/2004 PASS
Plan Review Completed(1st rev)  8/24/2004 FAIL
failed plan check
Routing - PLAN CHECK8/5/2004 8/20/2004 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Department for review.
Plan resubmittals requested  8/20/2004  
Plan resubmittals and written response required for further review.
Routing - PLANNING8/3/2004 8/5/2004 PASS
Approve per CZC04-00129
Routing - Erosion and Sediment8/3/2004 8/4/2004 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS8/3/2004 8/3/2004 PASS
Plans ACCEPTED BY PLAN TECH  7/30/2004 DONE
No MEC or Envelope Compliance Also, another Certificate of value was submitted along with the plans for the Demolition of office space...
Application received  7/28/2004  
Recd Pcfee & Taken To Pln CK  7/28/2004