Case Summary (BLD) | | | 3/11/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/23/2008 | | |
|
|
|
|
BLD-Final | 6/9/2005 | 6/9/2005 | 6/9/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/9/2005 at 8:17:49 AM. Contact: ###-####. ok for l/c
|
BLD-Final | 6/8/2005 | 6/8/2005 | 6/9/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/8/2005 at 9:07:57 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/9/2005 | 6/9/2005 | 6/9/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 6/6/2005 | 6/6/2005 | 6/7/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 9:31:26 AM. Contact: ###-####.
|
BLD-Final | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 11:33:45 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PART |
Forrest France
|
|
|
Final pending fire alarm sign off.
|
BLD-Other | 6/1/2005 | 6/1/2005 | 6/2/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 7:32:31 AM. Contact: ###-####. ceiling grid front area ok to cover
|
BLD-Other | 5/25/2005 | 5/25/2005 | 5/25/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 9:00:51 AM. Contact: ###-####. ceiling grid office area ok
|
BLD-Other | 5/23/2005 | 5/24/2005 | 5/24/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/23/2005 at 10:54:44 AM. Contact: ###-####. ceiling grid still not per plans
|
BLD-Framing/Rough-in | 5/19/2005 | 5/20/2005 | 5/23/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 3:33:13 PM. Contact: ###-####.ceiling gred ok
|
BLD-Framing/Rough-in | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 9:22:43 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 3/21/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 3/17/2005 | | |
|
|
|
|
Plan assigned to (DRS) | 2/3/2005 | 2/3/2005 | 3/9/2005 | | PASS |
|
|
|
3/9/2005 08:16:27 DRS - activity updated through activity BLDA022 from case BLD04-01705.
|
Routing - PLAN CHECK | 3/8/2005 | | 3/9/2005 | | PASS |
|
|
|
2nd plan modification review has been rerouted to PW, Plumbing, Fire Code & Plan Review and modification approved for the third time.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2005 | | PASS |
|
|
|
To permit desk to issue.
|
Plan assigned to (DRS) | 8/3/2004 | | 3/9/2005 | | PASS |
|
|
|
10/1/2004 13:01:16 DRS - activity updated through activity BLDA022 from case BLD04-01705. 12/15/04 - 1st plan modification reviewed and approved with plans to permit desk for second time. 3/09/05 - 2nd plan modification review completed with plans to permit desk for issuing permit.
|
Routing - PLUMBING | 3/8/2005 | | 3/8/2005 | | PASS |
|
|
|
approved per plan and 2003 UPC
|
Routing - FIRE | 3/1/2005 | | 3/8/2005 | | PASS |
|
|
|
revised comments faxed to architect.
|
Routing - PLAN CHECK | 3/8/2005 | | 3/8/2005 | | PEND |
|
|
|
Routing to plumbing reviewer.
|
Plan Reviewer's activity | | | 3/1/2005 | | DONE |
|
|
|
Assembled two sets of last submitted plan modification submittals, added original front and back sheets to plans, re-wrote permit scope description, reviewed new plans for code compliance, assembled copies of all items to be attached to front of plans and began routing to other agencies.
|
Routing - PLAN CHECK | 2/23/2005 | | 3/1/2005 | | PEND |
|
|
|
3rd plan modification plans assembled. The plans have been approved two times previously by all reviewing agencies and taken to permit desk for issuing permit. This is the third time plans will be circulated for review due to scope of work changes.
|
Routing - PUBLIC WORKS | 3/1/2005 | | 3/1/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/23/2005 | | DONE |
|
|
|
Received Transmittal Letter,& 2 Copys of sheets A0.1,A0.2,A2.1,A2.2,A7.1,A8.1,A8.2,A8.3,MC1.1,M1.1,M1.2,M2.1,M2.2,M3.1,P1.1,P1.2,P2.1,P3.1,E0.0,E2.1,E2.2,E2.3,E3.0,E3.1 Taken to Dan S.
|
Telephone call | | | 2/18/2005 | | DONE |
|
|
|
Call to Bryan Gilbreath, ZGA, to tell him the plans have changed sufficiently from the original plans that a full submittal for all sheets is required.
|
Plan resubmittals received | | | 2/17/2005 | | DONE |
|
|
|
Received Transmittal Letter, 2 Copys of sheets A0.1,A2.1,A2.2,A7.1,A8.1,A8.2,A8.3,MC1.1,M1.1,M2.1,P1.1,P2.1,M3.1,E0.0,E2.0,E2.1,E2.2,E2.3,E3.0,E3.1,E3.2 & 7 Copys of sheet A0.2 Taken to Dan S.
|
Plan resubmittals received | | | 2/3/2005 | | DONE |
|
|
|
Received letter, & 5 Copys of sheets A0.2, A2.1 Taken to Dan S.
|
Permit Ready to Issue | | | 12/20/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/20/2004 | | DONE |
|
|
|
Spoke with Joe and told him that permit is ready & fees///12/20/04 12:40pm BAS
|
Routing - PUBLIC WORKS | 12/14/2004 | | 12/15/2004 | | PASS |
|
|
|
Plans resubmitted with scope of work reduced removing all new plumbing fixtures, using existing sink and floor sink that already exist under original plans of BLD98-03343.
|
Routing - PLUMBING | 12/15/2004 | | 12/15/2004 | | PASS |
|
|
|
provide an r.p. for the humidifier over the existing floor sink.
|
Routing - PLAN CHECK | 12/15/2004 | | 12/15/2004 | | PASS |
|
|
|
Approved as noted and attached.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2004 | | PASS |
|
|
|
|
Routing - FIRE | 12/10/2004 | | 12/14/2004 | | PASS |
|
|
|
plan modification approved per revised comments.
|
Routing - PLAN CHECK | 12/14/2004 | | 12/14/2004 | | PEND |
|
|
|
Re-routing to public works.
|
Routing - PLAN CHECK | 12/9/2004 | | 12/10/2004 | | PEND |
|
|
|
No resubmittals required. Routing to fire code analyst for re-review.
|
Additional plans submitted | | | 12/9/2004 | | DONE |
|
|
|
Received two complete copies of new plans reducing scope of work and area involved. Plans need to be recirculated to plumbing & fire code analysts for re-review and approval.
|
Meeting | | | 12/9/2004 | | DONE |
|
|
|
Met with Steve Turney & Eric Anderson, ZGA to review resubmittal plans and accepted same for re-review.
|
Telephone call | | | 11/30/2004 | | DONE |
|
|
|
Call from Eric Anderson, ZGA, concerning the Idaho Elk's Rehabilitation Hospital Wound Clinic project. The plans have not been picked up from the permit desk (ready 10/1/04) and they would like to resubmit plans for reduction in scope of work, reducing the area involved in the remodel. They are preparing new plans for submittal. I have retrieved the plans from the permit desk and had status changed to review.
|
CHANGE STATUS TO (REV) | | | 11/29/2004 | | DONE |
|
|
|
per Dan S.
|
Plan resubmittals received | | | 10/5/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of Exam Light Detail. Taken to Dan S.
|
Routing - PLAN CHECK | 10/1/2004 | | 10/1/2004 | | PASS |
|
|
|
Approved as noted on and attached plan review conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2004 | | PASS |
|
|
|
To permit desk to issue.
|
Inspection Record Card- Bld | | | 10/1/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/1/2004 | | |
|
|
|
|
Telephone call | | | 10/1/2004 | | DONE |
|
|
|
talked to eric anderson at ###-#### that permit is ready
|
Routing - FIRE | 9/28/2004 | | 10/1/2004 | | PASS |
|
|
|
resubmittal acceptable; revised review comments accordingly.
|
Plan resubmittals received | | | 9/29/2004 | | DONE |
|
|
|
Received letter of transmittal with two M3.1 sheets taken to Dan S.
|
Routing - PLAN CHECK | 8/17/2004 | | 9/28/2004 | | PEND |
|
|
|
Plan resubmittals received and inserted into original plans. No further resubmittals required. Routing to fire code analyst for re-review.
|
Plan resubmittals received | | | 9/24/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Stes of A0.2,A2.1 Taken to Dan S....
|
Plan Review Completed(1st rev) | | | 8/17/2004 | | FAIL |
|
|
|
failed plan check and fire.
|
Routing - FIRE | 8/13/2004 | | 8/17/2004 | | FAIL |
|
|
|
lacks Haz mat inventory statement and details of system design. Review comments faxed to architect.
|
Routing - PLAN CHECK | 8/11/2004 | | 8/13/2004 | | FAIL |
|
|
|
PLAN REVIEW COMMENTS TO ARCHITECT FOR RESPONSE. ROUTING TO FIRE CODE ANALYST.
|
Plan resubmittals requested | | | 8/13/2004 | | FAIL |
|
|
|
COPY OF PLAN REVIEW FAXED AND MAILED TO STEVE TURNEY.
|
Telephone call | | | 8/11/2004 | | DONE |
|
|
|
Call from Eric Anderson, ZGA, stsating the plans had been submitted under the wrong occupancy use group. Major area of remodel to remain an "I" occupancy suite rather than change to a "B" use. The original "B" occupancy mechanical & office area is being modified to expand the "I" occupancy suite and the original two hour occupancy separation wall constructed under the UBC will be relocated behind the new Chamber room.
|
Plan resubmittals requested | | | 8/10/2004 | | DONE |
|
|
|
Talked with Eric at ZGA, designer, and faxed him a follow up notice concerning plan submittal occupancy use change proposal and need for analysis between existing under the UBC and the proposed changes under the IBC for the 1st floor. Also faxed a copy of the fire floor fire code analysis from BLD98-03343, original approved plans, for architects use.
|
Routing - PLAN CHECK | 8/5/2004 | | 8/10/2004 | | FAIL |
|
|
|
Plans are incomplete pertaining to the occupancy use change proposed based on comparison with the 1998 original plans, BLD98-03343. Have spoken with Eric at ZGA and have faxed him a follow up cover letter stating the deficiency. The code analysis for the proposed changes are needed before the plan review can continue. Routing ti fire code anlyst for review.
|
Routing - PLUMBING | 8/4/2004 | | 8/5/2004 | | PASS |
|
|
|
note 16 page P1.1- pipe condensate to branch tailpiece or other indirect waste receptor not located in a cabinet.
|
Routing - PUBLIC WORKS | 8/3/2004 | | 8/4/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2004 | | DONE |
|
|
|
No MEC or Envelope Compliance ...
|
Application received | | | 7/28/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/28/2004 | | |
|
|
|
|
Fee Review-notes | 7/28/2004 | 7/28/2004 | | | |
|
|
|
|