Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/13/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/13/2005 | 7/13/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/7/2005 | 7/13/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/7/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10628 issued 6-7-05 to Cloverdale Dental Office.
|
BLD-Final | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Jim Sly
|
|
|
gil --call 1st before insp -re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Perm Occ. :)
|
FIRE-Conference | 6/3/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety passed.
|
Permanent Occupancy | | 6/6/2005 | 6/6/2005 | | DONE |
|
|
|
|
BLD-Final | 6/2/2005 | 6/3/2005 | 6/3/2005 | P | PART |
Jim Sly
|
|
|
gil --please call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp Occ. Need dampers and complete firestopping Bsmnt.
|
FIRE-Final Inspection | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
BLD-Framing/Rough-in | 4/28/2005 | 4/28/2005 | 4/28/2005 | P | PART |
Jim Sly
|
|
|
ceiling grid inspection and call prior to going out please///gill; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa grid ok . 4/28/2005 4:15:46 PM
|
BLD-Energy code compliance | 3/3/2005 | 3/3/2005 | 3/3/2005 | P | PASS |
Jim Sly
|
|
|
gill--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | PART |
Dave Hannah
|
|
|
Please call prior to inspection///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2/28/2005 4:29:01 PM checked hold downs added on inside per new engineering ok framing ok to insulate check fire blocking at energy code inspection 2/28/2005 4:34:53 PM
|
BLD-Conference | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | PASS |
Jim Sly
|
|
|
gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Discussed 1hr Flr/Ceil assembly Bsmnt. 2/24/2005 4:35:03 PM
|
BLD-Framing/Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | FAIL |
Jim Sly
|
|
|
SHEAR INSPECTION PLEASE///gill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Nailing OK, but many missed hold downs and HDs in wrong locations. Do per plan, or Eng to approve. 2/2/2005 11:22:05 AM
|
BLD-Foundation | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Foundation | 1/3/2005 | 1/3/2005 | 1/3/2005 | P | PASS |
Jim Sly
|
|
|
gill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Final section of footing at N wall OK. 1/3/2005 12:47:22 PM
|
BLD-Foundation | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | FAIL |
Jim Sly
|
|
|
FYI....Pouring concrete at 8:30///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Poured W/O inspection. 12/21/2004 10:08:56 AM
|
BLD-Footing | 12/14/2004 | 12/15/2004 | 12/15/2004 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell Footing OK except West end of North wall.....Need compaction test and footing insp this area. 12/15/2004 11:12:06 AM
|
BLD-Foundation | 11/19/2004 | 11/22/2004 | 11/22/2004 | A | PASS |
Jim Sly
|
|
|
Gil they will be pouring at 1:00 need late morning insp.; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Footing | 11/16/2004 | 11/17/2004 | 11/17/2004 | A | PASS |
Jim Sly
|
|
|
Late am please///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2500 PSI design. 11/17/2004 9:47:02 AM
|
(F) Reprint permit | | | 11/15/2004 | | |
|
|
|
|
Issue & PRINT permit | | | 11/12/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/23/2004 | | |
|
|
|
|
Print Occupancy Form | | | 9/23/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/23/2004 | | |
|
|
|
|
Telephone call | | | 9/23/2004 | | DONE |
|
|
|
mike ###-#### that permit is ready
|
Routing - PLAN CHECK | 9/21/2004 | | 9/22/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2004 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/2/2004 | | 9/22/2004 | | PASS |
|
|
|
9/22/2004 11:02:26 JCM - activity updated through activity BLDA022 from case BLD04-01711.
|
Routing - FIRE | 9/13/2004 | | 9/21/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 9/9/2004 | | 9/13/2004 | | |
|
|
|
|
Plan resubmittals received | | | 9/10/2004 | | DONE |
|
|
|
Received Transmittal Letter, 1 Set of G2.0, C2.0 , 1 Set of A-3.0, 3 Sets of GS,D1,D1.1,D2,CD,MD1,MD2 Taken to John Menard.....
|
Routing - PLAN CHECK | 9/7/2004 | | 9/9/2004 | | |
|
|
|
|
Plan resubmittals received | | | 9/9/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Sets of P1.0,P3.2 Taken to John Menard...
|
Routing - PLUMBING | 9/9/2004 | | 9/9/2004 | | PASS |
|
|
|
per plans and 2003 upc and nfpa 99
|
Plan resubmittals received | | | 9/8/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 1 Set of P1.0 , P3.2 Taken to John Menard...
|
Routing - FIRE | 8/30/2004 | | 9/7/2004 | | FAIL |
|
|
|
lacking FD access, fire flow, hydrant locations, haz mat and med gas info. REview faxed to archtiect.
|
Plan Review Completed(1st rev) | | | 9/7/2004 | | FAIL |
|
|
|
failed fire
|
Plan Reviewer's activity | | | 8/30/2004 | | PASS |
|
|
|
Reviewed and approved resubmitted plans as revised. JCM
|
Routing - PLAN CHECK | 8/27/2004 | | 8/30/2004 | | PASS |
|
|
|
John M.
|
Routing - PLANNING | 8/25/2004 | | 8/27/2004 | | PASS |
|
|
|
Approved per DRH04-00146.
|
Plan resubmittals received | | | 8/26/2004 | | DONE |
|
|
|
-5.0,A-7.0,A-8.0, taken to John M.
|
Routing - PLUMBING | 8/17/2004 | | 8/25/2004 | | FAIL |
|
|
|
provide floor sinkl at vacuum pump/compressor location, sewage ejector does not meet min. requirements, pipe med vac discharge air outside. size water system.
|
Plan resubmittals requested | | | 8/19/2004 | | DONE |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - Erosion and Sediment | 8/16/2004 | | 8/17/2004 | | PASS |
|
|
|
ESC plan approved with attached condtions.
|
Plan resubmittals received | | | 8/17/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 1 Set of ESC-1 Taken to John Menard....
|
Routing - PUBLIC WORKS | 8/11/2004 | | 8/16/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/3/2004 | | 8/10/2004 | | PASS |
|
|
|
Lot 6, Block 1 of Streeper Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 8/3/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/3/2004 | | |
|
|
|
|
Application received | | | 7/29/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2004 | | |
|
|
|
|
Fee Review-notes | 7/29/2004 | 7/29/2004 | | | |
|
|
|
|