Permit Information
Permit NumberBLD04-01711
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 13219 W PERSIMMON LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Cloverdale Dental Office Building - To construct a new 3,825 square foot, one story, wood framed, dental office building with a 990 square foot basement and related site improvements. The basement contains a 250 square foot mechanical room and except for the finished stairway, the remainder of the basement is unfinished for future occupancy. The unfinished portion of the basement will require a tenant improvement permit to finish for occupancy. All construction per the approved plans and attached comment list. #04-480/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/13/2005 DONE
Second Notice has not been responded to.
Second Notice BLD7/13/20057/13/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 6/7/20057/13/2005 DONE
Permanent occupancy  6/7/2005 DONE
Perm. Occ. Cert. # 10628 issued 6-7-05 to Cloverdale Dental Office.
BLD-Final6/6/20056/6/20056/6/2005PPASS
DetailsJim Sly
gil --call 1st before insp -re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
OK for Perm Occ. :)
FIRE-Conference6/3/20056/6/20056/6/2005PPASS
DetailsTroy Cobbley
Fire life safety passed.
Permanent Occupancy 6/6/20056/6/2005 DONE
Details
BLD-Final6/2/20056/3/20056/3/2005PPART
DetailsJim Sly
gil --please call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp Occ. Need dampers and complete firestopping Bsmnt.
FIRE-Final Inspection6/2/20056/3/20056/3/2005APASS
DetailsTroy Cobbley
fire life safety finaled
BLD-Framing/Rough-in4/28/20054/28/20054/28/2005PPART
DetailsJim Sly
ceiling grid inspection and call prior to going out please///gill; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa grid ok . 4/28/2005 4:15:46 PM
BLD-Energy code compliance3/3/20053/3/20053/3/2005PPASS
DetailsJim Sly
gill--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in2/28/20052/28/20052/28/2005PPART
DetailsDave Hannah
Please call prior to inspection///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2/28/2005 4:29:01 PM checked hold downs added on inside per new engineering ok framing ok to insulate check fire blocking at energy code inspection 2/28/2005 4:34:53 PM
BLD-Conference2/24/20052/24/20052/24/2005PPASS
DetailsJim Sly
gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Discussed 1hr Flr/Ceil assembly Bsmnt. 2/24/2005 4:35:03 PM
BLD-Framing/Rough-in2/1/20052/2/20052/2/2005AFAIL
DetailsJim Sly
SHEAR INSPECTION PLEASE///gill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Nailing OK, but many missed hold downs and HDs in wrong locations. Do per plan, or Eng to approve. 2/2/2005 11:22:05 AM
BLD-Foundation1/3/20051/4/20051/4/2005APASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Foundation1/3/20051/3/20051/3/2005PPASS
DetailsJim Sly
gill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Final section of footing at N wall OK. 1/3/2005 12:47:22 PM
BLD-Foundation12/20/200412/21/200412/21/2004AFAIL
DetailsJim Sly
FYI....Pouring concrete at 8:30///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Poured W/O inspection. 12/21/2004 10:08:56 AM
BLD-Footing12/14/200412/15/200412/15/2004APART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell Footing OK except West end of North wall.....Need compaction test and footing insp this area. 12/15/2004 11:12:06 AM
BLD-Foundation11/19/200411/22/200411/22/2004APASS
DetailsJim Sly
Gil they will be pouring at 1:00 need late morning insp.; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Footing11/16/200411/17/200411/17/2004APASS
DetailsJim Sly
Late am please///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2500 PSI design. 11/17/2004 9:47:02 AM
(F) Reprint permit  11/15/2004  
Issue & PRINT permit  11/12/2004 DONE
Permit Ready to Issue  9/23/2004  
Print Occupancy Form  9/23/2004 DONE
Inspection Record Card- Bld  9/23/2004  
Telephone call  9/23/2004 DONE
mike ###-#### that permit is ready
Routing - PLAN CHECK9/21/2004 9/22/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/22/2004 DONE
Plan assigned to (JCM)8/2/2004 9/22/2004 PASS
9/22/2004 11:02:26 JCM - activity updated through activity BLDA022 from case BLD04-01711.
Routing - FIRE9/13/2004 9/21/2004 PASS
resubmittal acceptable.
Routing - PLAN CHECK9/9/2004 9/13/2004  
Plan resubmittals received  9/10/2004 DONE
Received Transmittal Letter, 1 Set of G2.0, C2.0 , 1 Set of A-3.0, 3 Sets of GS,D1,D1.1,D2,CD,MD1,MD2 Taken to John Menard.....
Routing - PLAN CHECK9/7/2004 9/9/2004  
Plan resubmittals received  9/9/2004 DONE
Received Transmittal Letter, & 2 Sets of P1.0,P3.2 Taken to John Menard...
Routing - PLUMBING9/9/2004 9/9/2004 PASS
per plans and 2003 upc and nfpa 99
Plan resubmittals received  9/8/2004 DONE
Received Transmittal Letter, & 1 Set of P1.0 , P3.2 Taken to John Menard...
Routing - FIRE8/30/2004 9/7/2004 FAIL
lacking FD access, fire flow, hydrant locations, haz mat and med gas info. REview faxed to archtiect.
Plan Review Completed(1st rev)  9/7/2004 FAIL
failed fire
Plan Reviewer's activity  8/30/2004 PASS
Reviewed and approved resubmitted plans as revised. JCM
Routing - PLAN CHECK8/27/2004 8/30/2004 PASS
John M.
Routing - PLANNING8/25/2004 8/27/2004 PASS
Approved per DRH04-00146.
Plan resubmittals received  8/26/2004 DONE
-5.0,A-7.0,A-8.0, taken to John M.
Routing - PLUMBING8/17/2004 8/25/2004 FAIL
provide floor sinkl at vacuum pump/compressor location, sewage ejector does not meet min. requirements, pipe med vac discharge air outside. size water system.
Plan resubmittals requested  8/19/2004 DONE
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - Erosion and Sediment8/16/2004 8/17/2004 PASS
ESC plan approved with attached condtions.
Plan resubmittals received  8/17/2004 DONE
Received Transmittal Letter, & 1 Set of ESC-1 Taken to John Menard....
Routing - PUBLIC WORKS8/11/2004 8/16/2004 PASS
Routing - PLANNING Land Div8/3/2004 8/10/2004 PASS
Lot 6, Block 1 of Streeper Subdivision.
Plans ACCEPTED BY PLAN TECH  8/3/2004 DONE
Plan routing begun/NEW & ADDTN  8/3/2004  
Application received  7/29/2004  
Recd Pcfee & Taken To Pln CK  7/29/2004  
Fee Review-notes7/29/20047/29/2004