BLD-Final | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | PASS |
Troy James
|
|
|
perry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 4/6/2005 2:11:56 PM
|
BLD-Final | 3/30/2005 | 3/31/2005 | 3/31/2005 | A | FAIL |
Troy James
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need to insulate floor 3/31/2005 12:45:34 PM
|
BLD-Final | 3/30/2005 | 3/30/2005 | 3/30/2005 | P | NR |
Troy James
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need electrical final 3/30/2005 3:08:06 PM
|
BLD-Framing/Rough-in | 2/1/2005 | 2/1/2005 | 2/1/2005 | P | PASS |
Troy James
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 2/1/2005 | 2/1/2005 | 2/1/2005 | P | PASS |
Troy James
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 1/28/2005 | 1/28/2005 | 1/28/2005 | P | PART |
Troy James
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore verify blocking installed between joist space at interior bearing wall, lateral bracing still to truss west side 1/28/2005 1:23:51 PM
|
BLD-Framing/Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/26/2005 at 5:13:24 PM. Contact: ###-####. nail a couple hangers and need approved set of plans, lateral bracing to truss AA, AA1 and BH1. 1/27/2005 1:52:46 PM
|
BLD-Framing/Rough-in | 12/14/2004 | 12/15/2004 | 12/15/2004 | A | PART |
Troy James
|
|
|
Harry; Phone #: ###-#### Internet Inspection Request from: Jan Rice
framer had questions 12/15/2004 10:38:51 AM
|
BLD-Energy code compliance | 11/2/2004 | 11/3/2004 | 11/3/2004 | A | PASS |
Troy James
|
|
|
Harry; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
BLD-Energy code compliance | 10/27/2004 | 10/28/2004 | 10/28/2004 | A | CANC |
Troy James
|
|
|
Harry; Phone #: ###-#### Internet Inspection Request from: Jan Rice
applicant calling inspection for the wrong address. The previous frame inspection not for this job. Should be permit number BLD 04-01627 10/28/2004 9:33:21 AM
|
BLD-Framing/Rough-in | 10/21/2004 | 10/22/2004 | 10/22/2004 | A | FAIL |
Troy James
|
|
|
Harry; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
need tempered glass window at rear patio. 10/22/2004 11:50:18 AM
|
BLD-Foundation | 10/5/2004 | 10/5/2004 | 10/5/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/5/2004 at 10:58:56 AM. Contact: ###-####.
|
BLD-Foundation | 10/4/2004 | 10/4/2004 | 10/4/2004 | P | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/4/2004 at 8:45:28 AM. Contact: ###-####.
|
BLD-Footing | 9/30/2004 | 9/30/2004 | 9/30/2004 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/30/2004 at 6:47:31 AM. Contact: ###-####. wip 9/30/2004 9:20:42 AM
|
Issue & PRINT permit | | | 9/28/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2004 | | DONE |
|
|
|
Only one set is being approved due to red-lining.
|
Permit Ready to Issue | | | 9/27/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/27/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/27/2004 | | DONE |
|
|
|
left ms on vm regarding that his permit and the fees are ready
|
Plan assigned to (SAM) | 9/2/2004 | | 9/27/2004 | | PASS |
|
|
|
9/27/2004 08:27:30 SAM - activity updated through activity BLDA022 from case BLD04-01713.
|
Routing - PLAN CHECK | 9/15/2004 | | 9/27/2004 | | PASS |
|
|
|
Builder submitted information
|
Case Summary (BLD) | | | 9/16/2004 | | |
|
|
|
|
Plan Review Report | | | 9/16/2004 | | |
|
|
|
|
Pending Assignment by DJO | 7/29/2004 | | 9/2/2004 | | DONE |
|
|
|
9/2/2004 07:13:37 SAM - activity updated through activity BLDA183 from case BLD04-01713.
|
Routing - PLAN CHECK | 8/29/2004 | | 9/2/2004 | | FAIL |
|
|
|
09:37 I talked to Harry Haun. I let him know that I need the layouts for the roof and floor framing with engineering.
|
Routing - PUBLIC WORKS | 8/26/2004 | | 8/26/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 8/25/2004 | | 8/26/2004 | | PASS |
|
|
|
Revised drawings submitted with corrections. O.K. per revised drawings with redlines indicating a maximum encroachment of eaves 2' into setbacks.
|
Routing - PLANNING | 7/29/2004 | | 7/29/2004 | | FAIL |
|
|
|
Eaves are shown with an overhang of 3' into the setbacks. 2' is the maximum allowed. Left message w/ Harry Haun at 4:30 p.m. on 7/29/04-CER.
|
Application received | | | 7/29/2004 | | |
|
|
|
|