Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-01713
StatusFinaled
Name HAUN GROUP INC
Site Address 853 S CAPITOLA WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a three bedroom, two and half bathroom 2108 sq. ft. two story single family dwelling (1413 sq. ft. first floor/1695 sq. ft. second floor) with a attached 748 sq. ft. two car garage, a 204 sq. ft. covered back porch and a 132 sq. ft. covered front porch. Per approved plans, engineering and requirement list. CUP00-00084 per Cody Riddle with Planning and Zoning. PC#442 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/6/20054/6/20054/6/2005PPASS
DetailsTroy James
perry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled4/6/20054/6/20054/6/2005PPASS
DetailsTroy James
Finaled by inspector at 4/6/2005 2:11:56 PM
BLD-Final3/30/20053/31/20053/31/2005AFAIL
DetailsTroy James
harry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need to insulate floor 3/31/2005 12:45:34 PM
BLD-Final3/30/20053/30/20053/30/2005PNR
DetailsTroy James
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need electrical final 3/30/2005 3:08:06 PM
BLD-Framing/Rough-in2/1/20052/1/20052/1/2005PPASS
DetailsTroy James
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Energy code compliance2/1/20052/1/20052/1/2005PPASS
DetailsTroy James
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in1/28/20051/28/20051/28/2005PPART
DetailsTroy James
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore verify blocking installed between joist space at interior bearing wall, lateral bracing still to truss west side 1/28/2005 1:23:51 PM
BLD-Framing/Rough-in1/26/20051/27/20051/27/2005PFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 1/26/2005 at 5:13:24 PM. Contact: ###-####. nail a couple hangers and need approved set of plans, lateral bracing to truss AA, AA1 and BH1. 1/27/2005 1:52:46 PM
BLD-Framing/Rough-in12/14/200412/15/200412/15/2004APART
DetailsTroy James
Harry; Phone #: ###-#### Internet Inspection Request from: Jan Rice
framer had questions 12/15/2004 10:38:51 AM
BLD-Energy code compliance11/2/200411/3/200411/3/2004APASS
DetailsTroy James
Harry; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
BLD-Energy code compliance10/27/200410/28/200410/28/2004ACANC
DetailsTroy James
Harry; Phone #: ###-#### Internet Inspection Request from: Jan Rice
applicant calling inspection for the wrong address. The previous frame inspection not for this job. Should be permit number BLD 04-01627 10/28/2004 9:33:21 AM
BLD-Framing/Rough-in10/21/200410/22/200410/22/2004AFAIL
DetailsTroy James
Harry; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
need tempered glass window at rear patio. 10/22/2004 11:50:18 AM
BLD-Foundation10/5/200410/5/200410/5/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 10/5/2004 at 10:58:56 AM. Contact: ###-####.
BLD-Foundation10/4/200410/4/200410/4/2004PNR
DetailsTroy James
Scheduled by a contractor via Hello! on 10/4/2004 at 8:45:28 AM. Contact: ###-####.
BLD-Footing9/30/20049/30/20049/30/2004APART
DetailsTroy James
Scheduled by a contractor via Hello! on 9/30/2004 at 6:47:31 AM. Contact: ###-####. wip 9/30/2004 9:20:42 AM
Issue & PRINT permit  9/28/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/27/2004 DONE
Only one set is being approved due to red-lining.
Permit Ready to Issue  9/27/2004 DONE
Inspection Record Card- Bld  9/27/2004 DONE
Telephone call  9/27/2004 DONE
left ms on vm regarding that his permit and the fees are ready
Plan assigned to (SAM)9/2/2004 9/27/2004 PASS
9/27/2004 08:27:30 SAM - activity updated through activity BLDA022 from case BLD04-01713.
Routing - PLAN CHECK9/15/2004 9/27/2004 PASS
Builder submitted information
Case Summary (BLD)  9/16/2004  
Plan Review Report  9/16/2004  
Pending Assignment by DJO7/29/2004 9/2/2004 DONE
9/2/2004 07:13:37 SAM - activity updated through activity BLDA183 from case BLD04-01713.
Routing - PLAN CHECK8/29/2004 9/2/2004 FAIL
09:37 I talked to Harry Haun. I let him know that I need the layouts for the roof and floor framing with engineering.
Routing - PUBLIC WORKS8/26/2004 8/26/2004 PASS
Routing - PLANNING8/25/2004 8/26/2004 PASS
Revised drawings submitted with corrections. O.K. per revised drawings with redlines indicating a maximum encroachment of eaves 2' into setbacks.
Routing - PLANNING7/29/2004 7/29/2004 FAIL
Eaves are shown with an overhang of 3' into the setbacks. 2' is the maximum allowed. Left message w/ Harry Haun at 4:30 p.m. on 7/29/04-CER.
Application received  7/29/2004