Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/15/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice | | 10/10/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 9/30/2005 | 10/10/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/30/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10753 issued 9-30-05 to Lacy Mechanical.
|
BLD-Final | 7/5/2005 | 7/5/2005 | 7/5/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/5/2005 at 8:07:28 AM. Contact: ###-####. OK for Perm Occ. ():
|
PubWorks Occupancy Approval | 7/5/2005 | 7/5/2005 | 7/5/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 7/5/05. R.Rokovitz
|
FIRE-Final Inspection | 6/30/2005 | 7/1/2005 | 7/1/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 6/30/2005 | 7/1/2005 | 7/1/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 4:41:26 PM. Contact: ###-####. Need Fire and ........
|
FIRE-Final Inspection | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 9:23:38 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/29/2005 | 6/29/2005 | 6/29/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide additional address numbers, provide fire extinguisher for the second floor, remove exit sign to warehouse, provide duct smoke detectors and annunciators as discussed.
|
Code Occupancy Approval | 6/29/2005 | 6/29/2005 | 6/29/2005 | P | PASS |
Carol Montgomery
|
|
|
|
Permanent Occupancy | | 6/29/2005 | 6/29/2005 | | DONE |
|
|
|
|
BLD-Other | 6/28/2005 | 6/28/2005 | 6/28/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 7:24:29 AM. Contact: ###-####. Grid OK
|
BLD-Conference | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 10:10:42 AM. Contact: ###-####.
|
BLD-Wall cover | 4/20/2005 | 4/21/2005 | 4/21/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/20/2005 at 3:05:26 PM. Contact: ###-####. Frame and energy Pass. 4/21/2005 3:13:47 PM
|
BLD-Framing/Rough-in | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/14/2005 at 5:13:11 PM. Contact: ###-####. OK to Insulate....Need to inspect for firestopping at blocking (fireblock) 4/15/2005 12:33:53 PM
|
BLD-Conference | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/14/2005 at 10:05:29 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 5:13:20 PM. Contact: ###-####. Shear naling OK.......Need to check retro fit HD's at frame. 2/18/2005 12:38:11 PM 2/18/2005 12:38:50 PM
|
BLD-Foundation | 11/22/2004 | 11/22/2004 | 11/22/2004 | P | PASS |
Jim Sly
|
|
|
Craig- this is for insulation board on foundation; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Foundation | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 11/18/2004 at 9:04:59 AM. Contact: ###-####.
stemwalls ok.
no ufer @ time of inspection. 11/18/2004 2:01:00 PM
|
BLD-Foundation | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | NR |
Jim Sly
|
|
|
Ken; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner No plans on site. 11/16/2004 11:09:51 AM
|
BLD-Foundation | 11/16/2004 | 11/16/2004 | 11/16/2004 | P | PASS |
Jim Sly
|
|
|
Ken; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner 2500 PSI No special insp Req.
11/16/2004 1:34:12 PM 11/16/2004 1:34:49 PM
|
BLD-Conference | 11/8/2004 | 11/9/2004 | 11/9/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/8/2004 at 1:44:55 PM. Contact: ###-####. 11/9/2004 10:16:48 AM Went through plans with Greg of Lacy Plumbing.....Special insp Req on everything.......Need letter from Eng. for 2500 design strength Conc. Otherwise Special insp Req. Turn N. in front of Scub A Dub car wash. 11/9/2004 10:19:38 AM 11/9/2004 10:21:50 AM
|
(F) Reprint permit | | | 11/9/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2004 | | DONE |
|
|
|
talked to cornell at ###-#### that permit is ready
|
Plan assigned to (JCM) | 8/3/2004 | | 10/7/2004 | | PASS |
|
|
|
10/7/2004 08:48:28 JCM - activity updated through activity BLDA022 from case BLD04-01721.
|
Routing - PLAN CHECK | 10/5/2004 | | 10/7/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/7/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/7/2004 | | DONE |
|
|
|
Spoke with Cornell (Architects office) and told him that permit is ready & fees///10/07/04 12:13pm BAS
|
Plan resubmittals received | | | 10/6/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of E-4 Taken to John Menard....
|
Routing - PLANNING | 10/5/2004 | | 10/5/2004 | | PASS |
|
|
|
Approved per DRH04-47.
|
Routing - PLAN CHECK | 9/27/2004 | | 10/5/2004 | | |
|
|
|
Received building envelope revisions, waiting for building lighting revisions. JCM
|
Routing - PUBLIC WORKS | 10/1/2004 | | 10/1/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/1/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Copys of Sheets of 1 of 2 Taken to John Menard...
|
Plan resubmittals received | | | 9/27/2004 | | |
|
|
|
Received Transmittal Letter, & 2 Copys of EN1.1 Taken to John Menard.... Energy building envelope revisions.
|
Routing - PLAN CHECK | 9/8/2004 | | 9/27/2004 | | |
|
|
|
|
Routing - FIRE | 9/27/2004 | | 9/27/2004 | | PASS |
|
|
|
Resubmittals acceptable.
|
Plan resubmittals requested | | | 9/23/2004 | | DONE |
|
|
|
Faxed the architect a request for additional revisions. Requested revised energy sheets for building envelope and lighting. JCM
|
Plan resubmittals received | | | 9/22/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Sets of 0,1 OF 2,2 OF 2, ESC-1,L-1,A-0.1,A-1,A-2,A-3,A-4,A-5,S-0,A-1,S-2,S-3,E-0,E-1,E-2,E-3,E-4,M0.0,M0.1,M1.0,P0.0,P0.1,P1.0,P2.0,EN1.0,EN1.1 Taken to John Menard....
|
Plan Review Completed(1st rev) | | | 9/8/2004 | | FAIL |
|
|
|
failed structural, plan check, planning, public works and fire.
|
Routing - FIRE | 9/1/2004 | | 9/8/2004 | | FAIL |
|
|
|
lacks adequate FD access; fire flow information
|
Routing - PLAN CHECK | 8/27/2004 | | 9/1/2004 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 9/1/2004 | | |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLANNING | 8/26/2004 | | 8/27/2004 | | FAIL |
|
|
|
Site plan does not match the design as approved per Design Review. Fencing is shown in the parking spaces near the building's southwest corner. Also, the angled parking near the south building wall should be directed to the traffic flow from the shared access driveway. The applicant has the option to change the plans to address these items, or submit a Design Review modification application.
|
Routing - PLUMBING | 8/19/2004 | | 8/26/2004 | | PASS |
|
|
|
1. over flow and roof drains-piping from drains that goes horizonal needs to be three inch mi8nimun per code 2. need expansion tank
|
Routing Off Site - STRUCTURAL | 8/23/2004 | | 8/23/2004 | | PASS |
|
|
|
Called PDQ for pick - up - Received a fax from the consulting structural engineer approving the resubmittals. JCM
|
Plan resubmittals received | | | 8/20/2004 | | |
|
|
|
Received Transmittal Letter, 3 books of Materials Testing & Inspection, & 1 Set of S-0 Taken to John Menard...
|
Plan resubmittals requested | | | 8/19/2004 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 8/18/2004 | | 8/19/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/11/2004 | | 8/18/2004 | | FAIL |
|
|
|
NEEDS VARIANCE ON VERTICAL POND SLOPE. CONTACT BRIAN MURPHY AT ###-####
|
Routing - PLANNING Land Div | 8/3/2004 | | 8/10/2004 | | PASS |
|
|
|
Lot 4, Block 1 of Fairview Commercial Subdivision.
|
Routing Off Site - STRUCTURAL | 8/3/2004 | | 8/10/2004 | | FAIL |
|
|
|
Called PDQ for pick -up - Received comment list from consulting structural engineer requesting revisions. JCM
|
Plans ACCEPTED BY PLAN TECH | | | 8/3/2004 | | DONE |
|
|
|
No Envelope Compliance...
|
Plan routing begun/NEW & ADDTN | | | 8/3/2004 | | |
|
|
|
|
Application received | | | 7/29/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2004 | | |
|
|
|
|
Fee Review-notes | 7/29/2004 | 7/29/2004 | | | |
|
|
|
|